Professional Documents
Culture Documents
Hopper Design
Hopper Design
Hopper Design
fck 25N/mm2
btan((90+phi)/2) 12.8705802507068
Design it as a bunker
31.9469297272707kn/m2
Mmax 179.262209432148Knm
dreq 216.429219293245mm
Overall depth 246.429219293245mm
thickness is ok
Ast 2543.1434834227mm2
provided 1884
Net BM 73.8173745010748Kn
Ast 1410.51832275928mm2
Mmax 70.4429800486319Knm
dreq 131.185640008296mm
Ast 934.354485310089mm2
Net BM 24.1518788738166Knm
Ast 554.278084505985mm2
625.32136784099Kn
theta 68.9753942662619
1/csctheta 1.07132170068346
required 8 mm @ 96.7934415486257mm
h 8.2m
pn = 96.8166814284891kn/m2
M-ve pr 213.255424807199Knm
Ast 3355.98545919097mm2
Ast 1677.99272959549mm2
Ast 1677.99272959549mm2
required 10 mm @ 135.438584256472mm
h 8.2m
pn = 91.2525043348978kn/m2
M-ve pr 98.2864185997649Knm
Ast 1546.7263820134mm2
Ast 773.363191006699mm2
Ast 773.363191006699mm2
Design of Beam of Long Span @ junction of vertical wall and sloping slab
4.2
T SPAN
5*0.3*(4.200/2)*(SQRT((4.200/2)^2+(8.700)^2))*2
0.5
DATA
unitr weight of Iron Ore 25kn/m3
fck 25N/mm2
btan((90+phi)/2) 8.26022314597601
Design it as a bunker
39.4218417101915kn/m2
Mmax 86.9251609709723Knm
dreq 145.727055586697mm
Overall depth 175.727055586697mm
thickness is ok
Ast 1152.97385180835mm2
provided 1507.2
Net BM 23.9487688389414Kn
Ast 683.96753920834mm2
Mmax 91.1137316526802Knm
dreq 149.519843388607mm
Overall depth 179.519843388607mm
Ast 1213.77096640464mm2
Net BM 31.5719674796496Knm
Ast 716.925158728017mm2
475.78017069034Kn
theta 68.9753942662619
1/csctheta 1.07132170068346
required 8 mm @ 113.161332701631mm
h 8.2m
pn = 155.154938186681kn/m2
M-ve pr 165.463852186452Knm
Ast 2603.89287851173mm2
Ast 1301.94643925587mm2
required 8 mm @ 161.659046716615mm
h 8.2m
pn = 91.2525043348978kn/m2
M-ve pr 101.704822576035Knm
Ast 1600.52156236285mm2
Ast 800.260781181426mm2
Ast 800.260781181426mm2
0.5
4.2
4.3
T SPAN
5*0.3*(4.200/2)*(SQRT((4.200/2)^2+(8.700)^2))*2
DATA
unitr weight of Clay 11kn/m3
fck 25N/mm2
btan((90+phi)/2) 8.26022314597601
Design it as a bunker
21.1750803448704kn/m2
Mmax 101.746261057102Knm
dreq 162.333711984233mm
Overall depth 192.333711984233mm
thickness is ok
Ast 1430.72615636057mm2
provided 1507.2
Net BM 40.3914657578404Kn
Ast 800.586838396709mm2
Mmax 46.6910521604393Knm
dreq 106.803200870643mm
Overall depth 136.803200870643mm
Ast 619.30931910938mm2
Net BM 16.008360740722Knm
Ast 367.386884217429mm2
592.82108032986Kn
theta 68.9753942662619
1/csctheta 1.07132170068346
required 8 mm @ 133.759734660626mm
h 8.2m
pn = 68.2681728021398kn/m2
M-ve pr 134.058046439387Knm
Ast 2109.66194620783mm2
Ast 1054.83097310391mm2
required 8 mm @ 129.444904510283mm
h 8.2m
pn = 91.2525043348978kn/m2
M-ve pr 98.2864185997649Knm
Ast 1546.7263820134mm2
Ast 773.363191006699mm2
Ast 773.363191006699mm2
4.2
T SPAN
5*0.3*(4.200/2)*(SQRT((4.200/2)^2+(8.700)^2))*2
DATA
unit weight of Sand 16kn/m3
fck 25N/mm2
btan((90+phi)/2) 8.26022314597601
Design it as a bunker
30.8001168652661kn/m2
Mmax 172.827155760224Knm
dreq 209.853728549231mm
Overall depth 239.853728549231mm
thickness is ok
Ast 1948.19028966119mm2
provided 2055.27272727273
Net BM 67.702506884463Kn
Ast 1108.05389989219mm2
Mmax 71.1867701048463Knm
dreq 129.410222055125mm
Overall depth 159.410222055125mm
Ast 740.858314799826mm2
Net BM 22.1837841722079Knm
Ast 456.402686767801mm2
757.480645188932Kn
theta 68.9753942662619
1/csctheta 1.07132170068346
required 8 mm @ 139.555555555556mm
h 8.2m
pn = 99.299160439476kn/m2
M-ve pr 219.565189216925Knm
Ast 2815.41477810251mm2
Ast 1407.70738905125mm2
required 8 mm @ 139.555555555556mm
h 8.2m
pn = 91.2525043348978kn/m2
M-ve pr 102.192664116881Knm
Ast 1310.38411778507mm2
Ast 655.192058892536mm2
Ast 655.192058892536mm2
4.3
T SPAN
5*0.3*(4.200/2)*(SQRT((4.200/2)^2+(8.700)^2))*2