01.C 01.D 01.E 01.F 01.G 01.H 01.I 01.J 01.

K
01.A' 01.A 01.B
63000

3000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000

01.01
6000

FF Section A

1500 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 1500

ø50 - SPR ø65 - SPR ø80 - SPR ø100 - SPR


To Open Drain Bop. 300 Bop. 300 Bop. 300 Bop. 300
01.02 c/w Test Drain
ø50 - SPR

1236
Bop. 300 ø50 - SPR ø50 - SPR
ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR

ø40 - SPR

ø40 - SPR

ø40 - SPR
ø40 - SPR

ø40 - SPR

ø40 - SPR
ø40 - SPR

ø40 - SPR

ø40 - SPR
ø40 - SPR

ø40 - SPR

ø40 - SPR

ø40 - SPR
ø40 - SPR
ø40 - SPR
3000

ø40 - SPR
6000

ø40 - SPR
ø40 - SPR
ø40 - SPR

ø40 - SPR
ø40 - SPR

ø40 - SPR

ø40 - SPR

ø40 - SPR
ø40 - SPR

ø40 - SPR
ø40 - SPR

ø40 - SPR

ø40 - SPR

ø40 - SPR
3000

ø40 - SPR
ø40 - SPR
01.03

ø100 - SPR
Bop. 3300

ø32 - SPR
ø32 - SPR

ø32 - SPR

ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR

ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR

ø32 - SPR
3000
6000

ø32 - SPR

ø32 - SPR

ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR

ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR
3000

01.04

ø25 - SPR
ø25 - SPR

ø25 - SPR

ø25 - SPR

ø25 - SPR
ø25 - SPR
ø25 - SPR

ø25 - SPR

ø25 - SPR
ø25 - SPR

ø25 - SPR
ø25 - SPR

ø25 - SPR
ø25 - SPR

ø25 - SPR

ø25 - SPR
3000
6000

1764

01.05
Connect From Main Sprinkler
Third Fllor Service Area

ø100 - SPR
Bop. 3300
6000
60000

01.06
6000

ø100 - SPR
Bop. 3300
Connect From Main Sprinkler
Third Fllor Service Area

01.07
1764

ø25 - SPR

ø25 - SPR
ø25 - SPR

ø25 - SPR
ø25 - SPR

ø25 - SPR

ø25 - SPR

ø25 - SPR
ø25 - SPR

ø25 - SPR
ø25 - SPR

ø25 - SPR

ø25 - SPR
ø25 - SPR

ø25 - SPR
6000

ø25 - SPR
3000

ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR

ø32 - SPR

ø32 - SPR
ø32 - SPR
ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR
ø32 - SPR

01.08
3000

Standard remarks:
- All dimensions are in millimeters (mm) and indicated levels in meters (m).
- All drawings to be read in conjunction with the Structural,- Civil,- and Mechanical & Electrical drawings.
- Drawings are not to be scaled; written dimensions should be followed and verified with details.

ø32 - SPR
ø32 - SPR
ø32 - SPR

ø32 - SPR

ø32 - SPR

ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR

ø32 - SPR
ø32 - SPR

ø32 - SPR
ø32 - SPR

- Indicated Finished Floor Level of the buildings is 0.00 = 96.1 or 97.1 or 106.1 MSL
ø32 - SPR

ø32 - SPR
6000

ø32 - SPR

- Building locations (corners) are fixed with the relevant UMT coordinates and related to the coordinated
3000

of the Boundary Bench mark A1.


- Pre Engineered Building Systems: Steel Super Structure of the Packaging Building and Full Product Store (BR),
Utility Building (E), Malt Intake Building (M),
ø100 - SPR Chemical Storage Building (S), Power Station (T) and Brew House & Service Block (Z) will be designed, fabricated
Bop. 3300 and delivered by the Pre Engineered Building Supplier.
- Pipe Bridge: The Pipe Bridges (P) as indicated on the drawings will be designed, fabricated and delivered
by the Pre Engineered Building Supplier.
ø40 - SPR

ø40 - SPR

- Builders steel: Support Steel frames for industrial doors (overhead doors) will be designed, fabricated and delivered
ø40 - SPR

ø40 - SPR
ø40 - SPR
ø40 - SPR

ø40 - SPR

ø40 - SPR
ø40 - SPR
ø40 - SPR

ø40 - SPR

ø40 - SPR

ø40 - SPR
ø40 - SPR

ø40 - SPR

ø40 - SPR
by the Pre Engineered Building Supplier.
01.09 - Industrial doors: Overhead doors, man doors and louvre doors will be designed, fabricated and delivered
3000

by the Pre Engineered Building Supplier.


- All equipment and equipment related building services are indicative. Exact dimensions and positions still to be determined.
- Roof, wall and floor openings are not yet indicated. Openings are listed in file “openings PEB”.
Exact dimensions, amounts and positions still to be determined.
- Safety facilities for working on roofs are yet not indicated. To be taken into account.
ø40 - SPR
ø40 - SPR

ø40 - SPR
ø40 - SPR

ø40 - SPR

ø40 - SPR
ø40 - SPR

0
ø40 - SPR

ø40 - SPR

.5
88
ø40 - SPR

87 .50
ø40 - SPR

88
ø40 - SPR

86 .50
ø40 - SPR

85 .50
6000

ø40 - SPR

ø40 - SPR

ø40 - SPR

.00
.50

88

0
.5
U

87
87.
00

. 50
87
3000

B T GEDUNG EXISTING
86.00

86 .50
Existing Building
Center Line

e
S

nc
fe
om r
fr ete
87.50

87.50

ck m

87 .50
in line
87.00
87.50
86.50

87.50
87.00
86.50
86.00
.50
87

ba 5
87.00
86.50
86.50 87 .50
87.00

t
se
X = 705616.838
Y = 9270621.605
Z = 87.514 Wate r p lant

Wate r t ank
15 0 m 3

.00
85 50
85. 00 Gen
86. .50
86 .00
87 .50
87 Wate r t ank
Gen 15 0 m 3
87.50

86.50
85.50 LV MDB
85.00

ø50 - SPR ø50 - SPR


86.00 87.00

ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR
1236

ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR ø50 - SPR
TR

ø50 - SPR
TR MV

ø50 - SPR ø50 - SPR ø50 - SPR


ø50 - SPR
Bop. 300 N A' A B C D E F G H I J

01.10 To Open Drain S etb


ac
k1
5
m
7

er

c/w Test Drain ø50 - SPR ø65 - SPR ø80 - SPR ø100 - SPR
Riv

s
Bop. 300 Bop. 300 Bop. 300 Bop. 300

ea
Cik
S.
1500 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 1500
© 2013 HaskoningDHV Nederland B.V. All intellectual property rights among which the copyright related to this drawing shall vest in
HaskoningDHV Nederland B.V.. The drawing is the property of HaskoningDHV Nederland B.V. and may not without the prior written

6000
consent of Haskoning DHV Nederland B.V. be duplicated or published in any way in whole or in part, or be used for any purpose

FF Section A

CD0 21.08.2017 RHD SMT ISSUED FOR CONSTRUCTION


Nr. Date Issued by Issued to Description

01.11 Drawn By : Designed By : Checked By : Approved By :


YgM IZH BM MA
Client :

PT Sinarmas Agro Resources And Technology, TBK


Sinarmas Land Plaza Tower 2, Jl. M.H. Thamrin PT. SMART Tbk
No.Kav 51, RT.9/RW.4, Gondangdia, Menteng, Kota (PT SINARMAS AGRO RESOURCES & TECHNOLOGY Tbk.)
Jakarta Pusat, DKI Jakarta 10350
Project Name : Subject :

TISSUE CULTURE PHASE II FIRE SPRINKLER INSTALLATION


SMART Biotechnology Center, Sentul Bogor. ON ROOF FLOOR

FIRE SPRINKLER INSTALLATION ROOF FLOOR


other than for which it is supplied.

PT. HASKONING INDONESIA, P.Size : A0 Phase : For Construction


a company of :
1 : 100 Ventura Building 2nd & 3rd Floor
R.A. Kartini #26 (Outer Ring Road) Scale : 1:100 Status : Final
Cilandak 12430
Jakarta - Indonesia Proj.Nr. : TA1811 Suitability :
T: +62 21 750 46 05

I&B
E: info@rhdhv.com
www.royalhaskoningdhv.com
Drw.Nr. : B1-04-DR-M-6014-CD0
2/6/2018 10:03:59 AM
C:\TEMP\TA1811_Lab_MEP_204298.rvt