ALLWEILER

Operating Instructions VM–Nr.: 490.0011 GB


Ausgabe: 03.95
Air Ejector A25A Ident–Nr.: 550 163

Keep for future


reference!

Job No.: Pump Ident No.:

Machine No.: Pump type:

Pump operating data according to order data sheet

1 General
The maintenance–free air ejector A25A serves for the According to the respective operating conditions, the
automatic ventilation of pumps and suction pipelines. It pressure switch must be set so as to switch the air ejec-
operates according to the ejector principle with a pres- tor off at approx. 80% of the lowest delivery pressure of
sure–dependent control and is adapted for clean, the pump switching it in again at approx. 30%.
chemically neutral water. The water–air mixture is drained through connection
Proper functioning is only assured if suction pipeline, Q3. The connection pipeline may be used for drainage,
fittings and pump are tight. Due to a force–controlled however, it must not be lockable.
shutoff valve in the suction pipeline, the device can also
be used in plants with temporary supply pressure.
5 Materials
2 Safety Lower–flow nozzle: Plastic
Connection of the power supply cables is to be effected Upper–flow nozzle: Plastic
by an electrical expert according to the circuit diagram. Inlet nozzle: G–CuZn l6Si4
In doing so, the current VDE regulations and the regula- Tubes in contact with the liquid: Cu
tions of the local power supply association are to be ob-
served.
Danger by electrical energy must be excluded. 6 Electric connection
Electric connection of the air ejector is to be effected ac-
3 Transportation and Intermediate Stor- cording to the following wiring diagram.
age
The graphical symbols provided on the packing are to
be observed.
During transportation and storage, all connections
must be closed with plugs. For installation, the plugs
are to be removed.

4 Functional Description
Through the venting pipeline, suction branch Q2 of the
air ejector is connected with the venting connection of
the pump. The compressed air required for the venting
process is supplied to the ejector at connection Q1.
To avoid dry running of the pump, the electrical circuit
(not included in the standard scope of supply) must be
designed so that the pump is put into operation only af-
ter the entire system is vented on the suction side
(please refer to Section 8.2 below).
As soon as a delivery pressure has been built up and
the specified pressure limit reached, the air ejector is Control voltage: 230 V, 50 Hz or 60 Hz (80% cyclic
switched off by means of the pressure switch. The duration), enclosure IP 54.
pulse is via the control pipeline connecting the pressure (Special voltages on request),
connection of the pump with connection Q4 at the pres-
sure switch. Power consumption: Start/operation = 22 VA/l5VA.
The delivery pressure dropping to below the specified
pressure limit, the air ejector is switched in again. Operating voltage and frequency must correspond to
the data on the type plate of the air ejector.

VM 490.0011 GB/03.95 – Ident–Nr. 550 163 1


ALLWEILER
7 Propellent Air Required Example:
The propellent air consumption in a normal com- Required vacuum: 40 %
pressed–air network of 6 bar is approx. 16.8 m3/h. Venting capacity: 180 l/min = 3 l/s
Air content of the suction pipeline: 30 l
Coarse estimate of the delay: 10 s
8 Connections/Closing Delay
However, the exact value can only be determined at the
8.1 Venting connections completed plant and must therefore be set at the time of
Venting connections must be arranged above the start–up.
pump and below the air ejector. Venting pipelines
should be laid with a slight inclination towards the air 8.3 Mounting example
ejector.

8.2 Closing delay


(not included in the scope of supply)
In case of suction operation or if air ingress has to be
expected, the pump must be started with a certain time
delay to the air ejector.
If necessary, attach an information plate ”Pump start
Venting
time–delayed” at a suitable place. pipeline(s)

Proposal for motor starter via timing relay: Control line


to manostat

The following diagram may be used for a rough deter-


mination of the closing delay to be expected.
Vacuum [%]

Aspirated air flow [l/min]

VM 490.0011 GB/03.95 – Ident–Nr. 550 163 2


ALLWEILER
9 Sectional Drawing with Parts List
Air ejector A25A

Denomination Part No. Denomination Part No.

Lower–flow nozzle 1 Socket–head cap screw 16


Double nipple 2 Socket–head cap screw 17
Piston control valve 3 Union 20
Solenoid valve 4 Joint ring 21
Manostat 5 Pipe 22
Clamping casing 6 Pipe union 23
Upper–flow nozzle 7 Pipe union 24
Inlet nozzle 8 Cable 26
O–Ring 10 Cable sleeve 27
O–Ring 11 Name plate 90
Socket–head cap screw 14 Information plate 91
Socket–head cap screw 15

VM 490.0011 GB/03.95 – Ident–Nr. 550 163 3


ALLWEILER

Subject to technical changes.

ALLWEILER AG
Werk Radolfzell
Postfach 1140
D–78301 Radolfzell
Allweilerstraße 1
D–78315 Radolfzell
Germany
& (++ 49) 7732 86 0
Fax (++ 49) 7732 86 436
E–mail: service@allweiler.de
Internet: http://www.allweiler.de

VM 490.0011 GB/03.95 – Ident–Nr. 550 163 4