A CRUDE SHIFT PUMP SUCTION FILTER CRUDE STORAGE SHIFT PUMP 2. DELETED. A
3. PUMP TRIP ON ANY OF THE TANK LIQUID LEVEL HIGH HIGH. AFTER A
CODE ASME SEC.VIII DIV.1 CODE API 610
PUMP TRIP, IN ORDER TO ENABLE RE STARTING THE PUMP AFTER
TYPE BASKET PUMP TYPE/ NO.OF STAGE HORIZONTAL CENTRIFUGAL / 1 LINING UP TO A DIFFERENT TANK, ADEQUATE OVERRIDE OPTIONS ON
DESIGN PRESSURE 0.873MPa(g) RATED CAPACITY/ NPSHr 500m³/hr / 1.12m TANK HIGH HIGH LEVEL TRIP PROVIDED.
DESIGN TEMPERATURE 93°C DIFF. HEAD/ SHUT-OFF PRESSURE 66 / 0.873MPa(g) 4. PUMP LOCATED AT OFFSITE CRUDE CHARGE PUMP AREA.
MAX. PRESSURE DROP (DIRTY) 0.009MPa SPECIFIC GRAVITY@ PUMPING 0.866 5. DELETED.
INSULATION TYPE NI MOTOR SIZE 160kW 6. PUMP TRIP LOGIC FOR LOW LOW SUCTION PRESSURE.
TRIM SPECIFICATION A4AR INSULATION TYPE NI 7. FOR FUTURE CONNECTION.
B TRIM SPECIFICATION A4AR B
C C
Pump 151-P-003 mechanical seal
damaged.
task is to make isolation plan: to
determine where isolation points,
status of isolation points -how they
become positive isolation?
151
A4AR B2AP PCV
0004
D 3/4"
D
8"-P-151-0505-B2AP-NI
8" 6" 8"
1" 1"
3/4" 1"
NOTE 6
MIN.
151
H US
151
PDI 0108
8"-P-151-0506-A4AR-NI
B2AP
0005
A4AR
151
PG
151
F PI 0007 F
151 L
PDT 0006 LL
0005 10"-P-151-0501-A4AR-NI
RS
151 NOTE 6 NOTE 3
PT 151 151
10"x8"
1 1/2" 0006 US US
NC 0108 0109
1"
RUN FEED DWG.No.
CRUDE RS RS 151
24"-P-151-0138-A4AR-NI SHIFT SUCTION HEADER 24"-P-151-0503-A4AR-NI 24"x14"
151-0003G MGL
G FROM 151-TK-001/002/003/ 0001A G
M-2 A,B,C,D,E
004/005/006/007/008
RS
151-F-001 1 1/2" 1 1/2"
151-P-003 1"-WO-151-0502-A4AR-NI
NC DWG.No. Title
1 1/2" 1 1/2"-WO-151-0504-A4AR-NI NOTE 1
A4AR REFERENCE DRAWINGS
A4AR A1AP
A1AP 7 18/AUG/18 AS BUILT N.V.T N.L.T N.D.T
3/4"
12"-P-151-0511-A4AR-NI
1"-WO-151-0501-A4AR-NI 6 26/JUL/17 AS BUILT Y.I.L J.J.C Y.S.K
5 14/APR/17 AS BUILT Y.I.L J.J.C Y.S.K
1 1/2"-WO-151-0505-A1AP-NI 4 24/FEB/17 AS BUILT\ Y.I.L J.J.C Y.S.K
3/4" 3 11/DEC/15 ISSUED FOR CONSTRUCTION Y.I.L J.J.C Y.S.K
H 2 24/APR/15 ISSUED FOR CONSTRUCTION Y.I.L J.J.C Y.S.K H
Rev Date Description Prep'd Chk'd App'd
1"-WO-151-0503-A1AP-NI
REVISIONS
WO Operation Centre JOB Code: 09105I
Operation Centre DWG.No.:
WO
151 Contractor JOB Code Responsible Company
PG 0-6495-20 GS
0008 151 STR
Prepared by Checked by Approved by
0501 Y.I.LEE J.J.CHA Y.S.KIM
I I
1"
NSRP
Complex Project
Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company
Drawing Title
D-151-1225-0005G