A. FOR LEGEND AND SYMBOLS, REFER TO DWG. D-000-1225-0001V TO


D-000-1225-0026V.
151-F-001 151-P-003 1. 1x100% PUMP.

A CRUDE SHIFT PUMP SUCTION FILTER CRUDE STORAGE SHIFT PUMP 2. DELETED. A
3. PUMP TRIP ON ANY OF THE TANK LIQUID LEVEL HIGH HIGH. AFTER A
CODE ASME SEC.VIII DIV.1 CODE API 610
PUMP TRIP, IN ORDER TO ENABLE RE STARTING THE PUMP AFTER
TYPE BASKET PUMP TYPE/ NO.OF STAGE HORIZONTAL CENTRIFUGAL / 1 LINING UP TO A DIFFERENT TANK, ADEQUATE OVERRIDE OPTIONS ON
DESIGN PRESSURE 0.873MPa(g) RATED CAPACITY/ NPSHr 500m³/hr / 1.12m TANK HIGH HIGH LEVEL TRIP PROVIDED.

DESIGN TEMPERATURE 93°C DIFF. HEAD/ SHUT-OFF PRESSURE 66 / 0.873MPa(g) 4. PUMP LOCATED AT OFFSITE CRUDE CHARGE PUMP AREA.
MAX. PRESSURE DROP (DIRTY) 0.009MPa SPECIFIC GRAVITY@ PUMPING 0.866 5. DELETED.
INSULATION TYPE NI MOTOR SIZE 160kW 6. PUMP TRIP LOGIC FOR LOW LOW SUCTION PRESSURE.
TRIM SPECIFICATION A4AR INSULATION TYPE NI 7. FOR FUTURE CONNECTION.
B TRIM SPECIFICATION A4AR B

C C
Pump 151-P-003 mechanical seal
damaged.
task is to make isolation plan: to
determine where isolation points,
status of isolation points -how they
become positive isolation?
151
A4AR B2AP PCV
0004
D 3/4"
D

8"-P-151-0505-B2AP-NI
8" 6" 8"
1" 1"

CRUDE 10"-P-151-0504-B2AP-NI SHIFT DISCHARGE HEADER 10"


151-0003G
E TO 151-TK-001/002/003/
NOTE 7 E
004/005/006/007/008

3/4" 1"
NOTE 6

MIN.
151
H US
151
PDI 0108
8"-P-151-0506-A4AR-NI

B2AP
0005
A4AR
151
PG
151
F PI 0007 F
151 L
PDT 0006 LL
0005 10"-P-151-0501-A4AR-NI

RS
151 NOTE 6 NOTE 3
PT 151 151

10"x8"
1 1/2" 0006 US US
NC 0108 0109

1"
RUN FEED DWG.No.
CRUDE RS RS 151
24"-P-151-0138-A4AR-NI SHIFT SUCTION HEADER 24"-P-151-0503-A4AR-NI 24"x14"
151-0003G MGL
G FROM 151-TK-001/002/003/ 0001A G
M-2 A,B,C,D,E
004/005/006/007/008

RS
151-F-001 1 1/2" 1 1/2"

151-P-003 1"-WO-151-0502-A4AR-NI
NC DWG.No. Title
1 1/2" 1 1/2"-WO-151-0504-A4AR-NI NOTE 1
A4AR REFERENCE DRAWINGS
A4AR A1AP
A1AP 7 18/AUG/18 AS BUILT N.V.T N.L.T N.D.T
3/4"

12"-P-151-0511-A4AR-NI
1"-WO-151-0501-A4AR-NI 6 26/JUL/17 AS BUILT Y.I.L J.J.C Y.S.K
5 14/APR/17 AS BUILT Y.I.L J.J.C Y.S.K
1 1/2"-WO-151-0505-A1AP-NI 4 24/FEB/17 AS BUILT\ Y.I.L J.J.C Y.S.K
3/4" 3 11/DEC/15 ISSUED FOR CONSTRUCTION Y.I.L J.J.C Y.S.K
H 2 24/APR/15 ISSUED FOR CONSTRUCTION Y.I.L J.J.C Y.S.K H
Rev Date Description Prep'd Chk'd App'd
1"-WO-151-0503-A1AP-NI
REVISIONS
WO Operation Centre JOB Code: 09105I
Operation Centre DWG.No.:
WO
151 Contractor JOB Code Responsible Company
PG 0-6495-20 GS
0008 151 STR
Prepared by Checked by Approved by
0501 Y.I.LEE J.J.CHA Y.S.KIM

I I
1"

NSRP
Complex Project
Nghi Son Refinery and Petrochemical
Nghi Son, Vietnam Limited Liability Company

Drawing Title
D-151-1225-0005G

J PIPING AND INSTRUMENTATION DIAGRAM J


UNIT 151
CRUDE OIL STORAGE & PUMPING
CRUDE STORAGE SHIFT PUMP

Issue Purpose Document Class


AS BUILT Z
K Unit No. Unit Abbreviation PCWBS Size Scale K
151 XXXX C100 A1 NONE
Contractor DWG.No. Sheet Rev.
A1

D-151-1225-0005G 001 OF 001 7


1 2 3 4 5 6 7 10 11 12 13 14 15 16
8 9
NOTE: THIS PRINT IS OF A CONFIDENTIAL NATURE AND IS THE PROPERTY OF JGC, Chiyoda, GS E&C, SK E&C, Technip AND SHALL NOT BE TRACED,PHOTOGRAPHED,PHOTOSTATED OR REPRODUCED IN ANY MANNER,NOR USED FOR ANY PURPOSE WHATSOEVER EXCEPT BY WRITTEN PERMISSION OF JGC, Chiyoda, GS E&C, SK E&C, Technip.