‫الكبالت التي توضع علي حوامل كبالت‬

labour
earth size
cable size cable cost cable tray
and cost
cable+earth cable tray

C >=300mm2 25 15% 30%

150=< C =<240 25 20% 30%

70=< C =<120 25 30% 30%

35=< C =< 70 25 45% 30%

C < 35 25 45% 30%

‫الكبالت التي توضع علي حوامل كبالت‬

labour
earth size
cable size cable cost Tiles
and cost
cable+earth cable tray

C >=300mm2 20 15% --

150=< C =<240 15 15% --

70< C =<120 15 20% --

35=< C =< 70 15 30% --

C < 35 15 45% --
‫مفاتيح االنارة‬

switch type buying PVC Pipes/Boxes/ Labor


cost Fittings/Wires

One gang One Way 10.00

Two gang One Way 10.00

One Gang Three way 10.00

Two Gang Three way 10.00

Four Gang Three way 15.00

‫المقابس ومقابس البيانات‬

buying PVC Pipes/Boxes/


cost Fittings/Wires Labor

SINGLE SOCKET 13 AMP/220 V/ P+N+E 100 60


WALL MOUNTED
SINGLE SOCKET 13 AMP/220 V / P+N+E 100 60
WALL MOUNTED / WP
DUPLEX SOCKET 13 AMP/220 V / P+N+E
WALL MOUNTED
100 60
SINGLE SOCKET 30 AMP/380 V/ 3P + E
WALL MOUNTED 100 60

30 Amp, NFDS 100 60

45 Amp A/C Switch 100 60

Water Heater 100 60

Data Outlet Wall Mounted 100 60


JUNCTION BOX OUTLET 100 60

‫تركيب أعمدة االنارة‬

item pole cost lamp cost foundation labour


3M POLE +Lamp 500 500
6-9 m pole+lamp 800 500
10m pole+lamp 800 350
12m pole+lamp 1000 500

‫تركيب االرضي‬

total Labor/ Excavation


cost
cost with over head /Back Fill

SDBC (16mm2 to 240 mm²) cost 1.1*cost 0.35*total cast


GROUNDING ROD 20MM Ø X 3000 MM LONG (rod+ cocret) price 1.1*(rod+ cocret) 0.35*total cast
& CONCRETE INSPECTION PIT
GROUNDING ROD 20MM Ø X 3000 MM LONG rod price 1.1*rod 0.35*total cast
GROUNDING ROD 20MM Ø X 1200 MM LONG rod price 1.1*rod 0.7*total cast
BUS BAR b price 0.35*total cast

Description Buying Points + Labor Direct Cost Unit Cost


(23%)
Master Fire Aalem Panel 10,352.00 12,422.40 1,863.36 14,286 17,571
Fire Alarm Panel 8,112.00 9,734.40 1,460.16 11,195 13,769
Fire Alarm Panel 6 Loops (SHAQRA
25,964.00 25,964.00 3,894.60 29,859 36,726
UNIVERSITY)
Fire Alarm Panel 6 Loops (Jeddah High Tech
College) 21,990.00 21,990.00 3,298.50 25,289 31,105
Fire Alarm Panel 2 Loops (Umm Al Qurra
Qunfudah) 13,500.00 13,500.00 2,025.00 15,525 19,096
Reapeter Panel - - - -
Smoke 220.00 242.00 180.00 425 523
Heat 180.00 198.00 180.00 380 467
Bell 128.00 140.80 180.00 321 395
Break Glass 216.00 237.60 180.00 418 514
Sirine 164.00 180.40 180.00 360 443
Duct Smoke Detector 456.00 501.60 180.00 682 838
IFU 1,081.60 1,189.76 180.00 1,370 1,685

ATS PANEL

Description Buying Labor


ATS PANEL 21,000.00 10%

GENERATOR

Description Buying Labor Total Direct Cost 20 % Profit 5%


Overhead

GENERATOR
Larg KVA>=600 5% 5%(buying+labor)
300=<MIDUIM kva<600 8% 5%(buying+labor)
small kva<300 10% 5%(buying+labor)
direct cost

direct cost
direct cost
Direct Cost
14,500
12,500
30,000

25,500

15,500

425
380
325
420
360
685
1,370

Total
Unit Cost Direct Total Total Total