Exercise 8 Answers: High Collapse Casing: Chapter 9: Exercises

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Chapter 9: Exercises

Exercise 8 Answers: High Collapse Casing


1. Open Design E3S0P1, select File > Save As, and save the Design
with a new name, E3S0P1_HC.

2. In the Work tab, perform the following.

a) Select Tubular > Tubular Properties > Grades, and then enter
the following grade:

Create a new Grade


named P-110HC.

b) Select Tubular > Pipe Inventory and enter the following high
collapse pipe information:

Notice after entering the special pipe, the StressCheck software


sorts the new row according to its weight, grade, and ID.

9-110 StressCheckTM Software Release 5000.1.13 Training Manual


Chapter 9: Exercises

3. Select Tubular > Special Connections Inventory and enter the


following connection information:

4. Perform the following:

a) Select Tubular > String Sections and apply the high


collapse pipe.

Select P-110HC as the new


grade for the string section.

b) Select Tubular > Connections and apply the VAM SLIJ


connection to the 9 5/8”, 53.50 ppf, P-110HC pipe.

Select VAM SLIJ-II as the new


connection for the pipe section.

5. Yes, the new Design tolerates a Full Evacuation scenario during


production under geothermal temperature conditions.

StressCheckTM Software Release 5000.1.13 Training Manual 9-111