Professional Documents
Culture Documents
Manzana Case Study - 020409
Manzana Case Study - 020409
Total 39 39 39 29 (75%)
Requests Per
Day (22 +17)
Requests
Processed
2nd
Quarter
1991
RUNs 326
RAPs 936
Ave Total
Processing
RAINs 206 Time: 407.7
RERUNs 1063
Total
Requests
Days per
Quarter 60
Minutes per
Day 450
0.917
Ave Time in
Queue (Tq) 138.8
Underwitin
g Team
Teams of
Two 3
Mean 29.362 43.6 38.0 22.6 18.7
Standard
Deviation 22.450 32.0 24.5 11.7 19.8
95% SCT 107.2 87.5 49.4 62.8
Weighted
Average 28.4
Interarrival
Time (a) 10.7
Average
Utilization 0.887
Coeff of
Variation
(CVp) 0.791
0.804
Ave Time in
Queue (Tq) 54.9
Rating
Rating
Employees 8
Mean 70.692 75.5 64.7 65.5 75.5
Standard
Deviation 13.038 20.5 13.6 15.9 9.7
95% SCT 112.3 88.7 89.4 92.2
Weighted
Average 70.4
Interarrival
Time (a) 10.7
Average
Utilization 0.825
Coeff of
Variation
(CVp) 0.185
Ave Time in
Queue (Tq)
Policy
Writing
Writing
Employees 5
Mean 34.582 71.0 N/A 54.0 50.1
Standard
Deviation 9.547 10.3 N/A 8.6 9.5
89.3 72.1 67.0
Weighted
Average 54.8
Interarrival
Time (a) 16.9
Average
Utilization 0.647
Coeff of
Variation
(CVp) 0.174
0.343
Ave Time in
Queue (Tq)