Civil4M Solutions LLP

Forum Project
Aluminium Shuttering Works (Mivan Formwork)

Name of Structure : Date :

Reference Drawings : Location:

Sr. Particulars Yes / No / Remarks


No. N.A.

1 Deviation report for survey record (kicker


level)
2 Dimension of room checked as per drawing
3 Diagonal check done for room
4 All formwork has been cleaned and coated
with release agent
5 Flat wall ties installed with proper tie sleeves
6 Verticality checked for external as well as
internal wall
7 Check all pins and wedges
8 Check verticality of all props
9 Check outer tie for external beam and sunk
portion
10 Slab soffit formwork level
11 Door spacer installed as per drawing issued
12 Vertical soldiers installed as per drawing
13 All kicker level have been lined and adjusted
accordingly
14 All kicker bolts installed correctly
15 All excessive spaces between rocker and
floor level have been sealed
Conclusion by Civil4M Representative - Activities Are Satisfactory / Not satisfactory

Contractor's Representative Civil4M Representative

Signature Signature