MUNICIPALITY OF MONREAL
(LGU)
ECONOMIC
Functions/Services/ Existing?
Legal Basis
Facilities (Y/N)
RA 8435 AFMA
1997;
RA 7309
N
RA 8435 AFMA
1997;
RA 7309 Y
N
N
RA 622
Soil Conservation Projects and
RA3435
Soil Utilization N
PD 1436
N
EO 138 Section 2.B Irrigation and infrastructure
N
Artificial Insemination Centers
N
Y
Operation of Slaughterhouse N
Credit Financing
RA 8435
RA 7161
Establishment and
improvement of local
distribution channels,
operations of farm produce
collection and buying station,
Livestock Market
Livestock Market
RA 11321 Sagip-
Market Information Services
Saka Act
RA 8435, EO 338 S.
2001,Section 20 of
Organic Agriculture
Agricultural Extension
Act of 2010, EO 801
S. 2009, EO 801 s.
2009, RA 7161
EO 116 s. 1987, RA
8435, EO 127 S. On site Research and Facilities
1999
Legend:
[1] LGUs legal basis for the devolved responsibilities.
Enumeration of devolved functions and services according to Section 17 of the LGC and
[2] and/or functions and services that LGUs will fully assume with reference to LGU consult
DTPs, if available.
[3] Indicate if the LGU is already performing the devolved responsibilities or not.
[4] The specific program, project, or activity being implemented by the LGU under the devo
If LGU is already performing the devolved responsibilities, indicate the LGU office or uni
[5]
devolved responsibilities.
[6] If LGU is already performing the devolved responsibilities, indicate the staff complemen
ANNEX E-1
nventory of LGU Functions, Services, and Facilities for Provinces/Cities/Municipalities
MUNICIPALITY OF MONREAL
(LGU)
ECONOMIC
Product Development:
Design Services and Intervention
LEIPO, MAO, MTO
Packaging and Labeling
FDA, Nutrifacts, and Testing Assistance
proved by:
_____________ __________________________
Administrator Local Chief Executive
esponsibilities.
and services according to Section 17 of the LGC and other pertinent laws on devolution,
GUs will fully assume with reference to LGU consultations with NGAs concerned and NGA
MUNICIPALITY
(L
Functions/Services/ Programs/Projects/
Timeline for Full Implementing
Facilities to be Activities for
Assumption Office/Unit
Assumed Implementation
[1] [2] [3] [4]
Prepared by: Reviewed by: Approved by:
Legend:
[1] All devolved functions and services to be fully assumed by LGU according to Sec
[2] The specific program, project, or activity to be implemented by the LGU under the
[3] The target year the LGU plans to fully assume the devolved functions, services, a
[4] The LGU office/unit responsible for the devolved functions, services, and facilities
[5] The resources needed by the LGU to fully assume, absorb, and manage the dev
ment 2-A: Phasing of Full Assumption of Devolved Functions, Services, and Facilities for Provinces/Cities/M
MUNICIPALITY OF CONCEPCION
(LGU)
Resource Requirements
Personnel/Staffing Capacity Development Funding
FY 2022 FY 2023 FY 2024 FY 2022 FY 2023 FY 2024 FY 2022
[5]
______________________________
Local Chief Executive
Funding
FY 2023 FY 2024
`
CAPACITY DEVE
(L
Performance Area/
Governance Sector:
Current State
Structure
Competencies
Management
Systems
Enabling Policies
Knowledge and
Learnings
Leadership
Prepared by:
Head, CapDev Agenda TWG
Date
(LGU)
Desired State
Goals:
Objectives:
Funding Requirements
Target of Capacity
Expected Output Timeframe
Development
Year 1 Year 2
Approved by:
G Governor/Mayor
Date
pacity Pillar; describes what is working/not working in each pillar; the pillars referred to are (1) structure; (2) competen
earning and, lastly, (6) leadership.
apacity Pillars so that performance goals can be achieved.
lity of the LGU to achieve its desired performance.
s, or people trained.
elopment intervention within the three-year time frame of the current leadership.
ed for capacity development interventions covered in Year 1.
ed for capacity development interventions covered in Year 2.
ed for capacity development interventions covered in Year 3.
or making sure that the intervention happens.
who can provide the necessary coaching/mentoring/technical assistance in the installation, implementation, and inst
ANNEX G-1
elopment Agenda for Provinces/Cities/Municipalities
State
Requirements Source of
Process
Support/
Owner/Office
Technical
Year 3 Responsible
Assistance
/Mayor
e
MONREAL
(LGU)
Legend:
[1 and 2] Indicate the old and new item numbers of the plantilla position.
Indicate the position title and the name of the incumbent occupying each position. If the position is unfilled, indicate the word “vacant” under
[3 and 4] column 4. If the position is proposed for abolition, place the position title inside a bracket. If the position is proposed for reclassification, place the
previous position title in a bracket and indicate the proposed title below it.
Indicate the current salary grade/step and corresponding rate per annum of each position. Include as a footnote the compensation law/circular
[5 and 6]
being implemented. For the initial implementation of changes, attach a copy of the Position Allocation List.
[7 and 8] Indicate the salary grade/step and corresponding rate per annum of each position proposed for the budget year.
[9] Indicate the difference between the old and the new rates of compensation per annum for the budget year.
Additional Instructions:
1. Prepare the same form for each local economic enterprise/public utility.
2. Separate plantilla using the same format shall be prepared for Casual Employees whose salaries are chargeable against Personal Services appropriation.
3. Only funded vacant positions shall be included in the plantilla. All unfunded vacant positions shall be removed/deleted from the plantilla.
4. LGUs are advised to first fill up the unfilled positions before they propose to expand their staffing pattern.
Note: This form is a consolidation of all LBP Form No. 3-A of all departments and offices in the LGU.
PERFORM
_______
Functions/
Programs/Projects/ Performance
Services/ Baseline
Activities Indicators
Facilities
Legend:
[1] All devolved services to LGUs in accordance with Section 17 of the LGC and other law
[2] Corresponding programs/projects/activities implemented or to be implemented by the L
[3] Quantity or quality parameters or measures to be used to assess the presence, extent
[4] Information about the indicator before the implementation of the full devolution for the L
[5] The desired change or level of performance the LGU aims to achieve as a measure of
[6] Frequency of monitoring and the methodology to be used to assess progress and effec
[7] Monitoring tool used to collect information.
[8] Sources of primary and secondary information.
[9] LGU office responsible for collecting the data and monitoring the performance.
[10] Capacity development needs of the LGU to strengthen its performance monitoring cap
PERFORMANCE MONITORING FRAMEWORK
____________________________________
(LGU)
by:
_______ ______________________________
ng Committee Governor/Mayor
LGU Monitoring
Responsible and Evaluation
Data Sources Office in the Capacity
LGU Development
Needs
MUNIICIPALITY
(
Functions/Services/ Programs/Projects/
Timeline for Full
Facilities to be Activities for
Assumption
Assumed Implementation
[1] [2] [3]
2022-2024
Preparation of Technical
Documents using road
standards
Construction 2022-2024
2022-2024
Evaluation of Accomplishment
of Engineering Works and
Projects
Transportation Services
Issuance of Development
2022-2024
permit
Municipal buildings, cultural
centers, public parks including
freedom parks, playgrounds
2022-2024
and sports facilities and
equipment,and other similar
facilities.
Other Services:
Local Infrastructure Services
Local Government
Development and
Supervision
Local Government
Development and
Supervision
Public markets,
slaughterhouses, and other 2022-2024
municipal enterprises.
Legend:
[1] All devolved functions and services to be fully assumed by LGU according to Sec
[2] The specific program, project, or activity to be implemented by the LGU under the
[3] The target year the LGU plans to fully assume the devolved functions, services, a
[4] The LGU office/unit responsible for the devolved functions, services, and facilities
[5] The resources needed by the LGU to fully assume, absorb, and manage the dev
Attachment 2-A: Phasing of Full Assumption of Devolved Functions, Services, and Facilities
MUNIICIPALITY OF MENDEZ-NUÑEZ
(LGU)
Resource Requirements
Implementing
Personnel/Staffing Capacity Development
Office/Unit
FY 2022 FY 2023 FY 2024 FY 2022 FY 2023
[4] [5]
-Enactment of
Ordinance on the
creation and hiring
of 1 Engineer I
(CE) Position
-Provision of
-Updating of
trainings/technical
technical
assistance for
knowledge and
preparation of
1ME, 1ME, 1ME, skills for
Municipal Engineering technical
preparation of
1EngrI(CE) 1EngrI(CE) 1EngrI(CE) documents re: road
technical
standards
documents re: road
-Crafting of
standards
technical reference
for comparison of
road standards
when preparing
technical
documents
-Provision of
trainings/technical
assistance for
preparation of -Refresher course
technical on technical
documents in knowledge and
accordance to skills for
1ME, 1ME, 1ME, National Building preparation of
Municipal Engineering Code technical
1EngrI(CE) 1EngrI(CE) 1EngrI(CE)
-Crafting of documents in
technical reference accordance to
for comparison of National Building
road standards Code
when preparing
technical
documents
-Enactment of
Appropriations
1ME, 1ME, 1ME, Ordianance with -Enactment of
funding provision
1EngrI(CE) 1EngrI(CE) 1EngrI(CE) Appropriations
for constructions of Ordianance with
Lcoal Roads and
funding provision
Infrastructures
for constructions of
Lcoal Roads and
Municipal Engineering Infrastructures
-Provision of -Updating of
technical technical
development for knowledge and
1ME, 1ME, 1ME, evaluation of skills for evaluation
1EngrI(CE) 1EngrI(CE) 1EngrI(CE) accomplishment of of accomplishment
Municipal Engineering engineering works of engineering
Office and projects works
-Conduct of
technical workshop
for identification of
O&M & ROWA
-Revisiting of
-Formulation of
strategic plan on
strategic plan on
1MPDO, 1 1MPDO, 1 1MPDO, 1 identification of
identification of
MPDC and Municipal O&M and ROWA
Zoning Zoning Zoning O&M and ROWA
including all
Assessor including all
Administrator Administrator Administrator stakeholders for
stakeholders
monitoring and
-Enactment of
evaluation
Ordinance on the
creation and Hiring
of 1 Zoning
Administrator
-Identification and
inventory of all
-Conduct of
facilities related to
quarterly
health
assessment of all
-Conduct of
infrastracture
structural
facilities
assessment of all
-Implementation of
facilities
infra projects to
-Implementation of
improve,
infra projects to
Municipal Engineering 1ME, 1ME, 1ME, improve,
rehabilitate,
Office 1EngrI(CE) 1EngrI(CE) 1EngrI(CE) develop and
rehabilitate,
construct additional
develop and
health facilities
construct additional
-Enactment of
health facilities
Appropriations
-Enactment of
Ordinance with
Appropriations
funding provision
Ordinance with
for health and
funding provision
sanitation
for health and
sanitation
-Enactment of -Enactment of
Appropriations Appropriations
Ordinance with Ordinance with
funding provision funding provision
Municipal Engineering 1ME, 1ME, 1ME, for Infrastructure for Infrastructure
Office 1EngrI(CE) 1EngrI(CE) 1EngrI(CE) facilities such as facilities such as
traffic signals and traffic signals and
road signs and road signs and
similar facilities similar facilities
- -Enactment of - -Enactment of
Appropriations Appropriations
Ordinance with Ordinance with
Municipal Engineering 1ME, 1ME, 1ME, funding provision funding provision
Office 1EngrI(CE) 1EngrI(CE) 1EngrI(CE) for Infrastructure for Infrastructure
facilities such as facilities such as
terminals terminals
-Enactment of
ordinance
determining a
specific facility (SK -Enactment of
Municipal Engineering 1ME, 1ME, 1ME, JOY CENTER) as Appropriations
Office, Municipal Tourism 1EngrI(CE), 1EngrI(CE), 1EngrI(CE), Tourism/Cultural Ordinance with
Office 1MTO 1MTO 1MTO Facility -Enactment funding provision
of Appropriations for tourism facilities
Ordinance with
funding provision
for tourism facilities
-Inventory of
existing and
identification of
need for additional
-Conduct of
school facilities
quarterly
-Enactment of
1ME, 1ME, 1ME, Ordinance on the
assessment of all
school facilities
Municipal Engineering 1EngrI(CE), 1EngrI(CE), 1EngrI(CE), creation and hring
-Review and
Office, DepEd 1Engr1(ME), 1Engr1(ME), 1Engr1(ME), of 2 Engineer I
monitoring on
postion (1ME and
1Engr1(EE) 1Engr1(EE) 1Engr1(EE) 1EE) -Conduct
implementation of
School
of consultation
Improvement Plan
meetings and
workshops for
School
Improvement Plan
-Enactment of
Appropriations
Ordinance
designating a site --Enactment of
for the construction Appropriations
1ME, 1ME, 1ME, of a public library Ordinance with
--Enactment of funding provision
Municipal Library 1EngrI(CE), 1EngrI(CE), 1EngrI(CE), Appropriations maintenance of
1Engr1(EE) 1Engr1(EE) 1Engr1(EE) Ordinance with information
funding provision services suc as
maintenance of public library
information
services suc as
public library
-Eanctment of
Ordinance for the
contruction and
--Enactment of
establishment of a
1ME, 1ME, 1ME, Appropriations
coomunity college
Ordinance with
Office of the Mayor, DepEd 1EngrI(CE), 1EngrI(CE), 1EngrI(CE), ---Enactment of
funding provision
1Engr1(EE) 1Engr1(EE) 1Engr1(EE) Appropriations
construction on
Ordinance with
community college
funding provision
construction on
community college
- Crafting of
Citizen's Charte for
the Issuance of
Demolition Permit -Maintenance and
regular updating of
Municipal Engineering 1ME, 1ME, 1ME, -Building, database for the
Office 1EngrI(CE) 1EngrI(CE) 1EngrI(CE) maintenance and issuance of
regular updating of demolition permit
database for the
issuance of
demolition permit
-Crafting of
Citizen's Charter
for the issuance of
Building and
Sanitary permit
-Building,
maintenance and -Maintenance and
1ME, 1ME, 1ME, regular updating of regular updating of
Municipal Engineering
1EngrI(CE), 1EngrI(CE), 1EngrI(CE), database for the database for the
Office issuance of issuance of
1EngrI(SE) 1EngrI(SE) 1EngrI(SE)
building ans sanitary permit
sanitary permit
-Enactment of SB
Ordinance on the
Creation and Hiring
of 1 Engineer I
Position (SE)
- Crafting of
Citizen's Charter
for the Issuance of
signage and -Maintenance and
billboard permit - regular updating of
Municipal Engineering 1ME, 1ME, 1ME, -Building, database for the
Office 1EngrI(CE) 1EngrI(CE) 1EngrI(CE) maintenance and issuance of
regular updating of signage and
database for the billboard permit
issuance of
signage and
billboard permit
- Crafting of
Citizen's Charter
for the Issuance of
-Maintenance and
1ME, 1ME, 1ME, repair permit -
regular updating of
Municipal Engineering -Building,
1EngrI(CE), 1EngrI(CE), 1EngrI(CE), maintenance and
database for the
Office issuance of repair
1Engr(EE) 1Engr(EE) 1Engr(EE) regular updating of
permit
database for the
issuance of repair
permit
- Crafting of
Citizen's Charter
for the Issuance of
1ME, 1ME, 1ME, occupancy permit -
-Maintenance and
regular updating of
Municipal Engineering 1EngrI(CE), 1EngrI(CE), 1EngrI(CE), -Building,
database for the
Office 1EngrI(EE), 1EngrI(EE), 1EngrI(EE), maintenance and
issuance of
regular updating of
1EngrI(SE) 1EngrI(SE) 1EngrI(SE) database for the
occupancy permit
issuance of
occupancy permit
- Crafting of
Citizen's Charter
for the Issuance of
-Maintenance and
electrical permit
regular updating of
1ME, 1ME, 1ME, and certificate
database for the
Municipal Engineering -Building,
1EngrI(ME), 1EngrI(ME), 1EngrI(ME), maintenance and
electrical permit
Office and certificate of
1EngrI(EE) 1EngrI(EE) 1EngrI(EE) regular updating of
final electrical
database for the
inspection
issuance of
electrical permit
and certificate
- Crafting of
Citizen's Charter
for the Issuance of
-Maintenance and
fencing permit
regular updating of
Municipal Engineering 1ME, 1ME, 1ME, -Building,
database for the
Office 1EngrI(CE) 1EngrI(CE) 1EngrI(CE) maintenance and
issuance of fencing
regular updating of
permit
database for the
issuance of fencing
permit
-Enactment of
Ordinance for the
Issuance Annual
Building Inspection
permit -
Crafting of
1ME, 1ME, 1ME, Citizen's Charter
1EngrI(CE), 1EngrI(CE), 1EngrI(CE), for the Issuance of
Municipal Engineering
1Engr1(ME), 1Engr1(ME), 1Engr1(ME), Annual Building
Office Inspection Permit
1Engr1(EE), 1Engr1(EE), 1Engr1(EE),
-Building,
1Engr1(SE) 1Engr1(SE) 1Engr1(SE) maintenance and
regular updating of
database for the
issuance Annual
Building Inspection
permit
- Crafting of
Citizen's Charter
for the Issuance of
-Maintenance and
mechanical permit
regular updating of
Municipal Engineering 1ME, 1ME, 1ME, -Building,
database for the
Office 1EngrI(ME) 1EngrI(ME) 1EngrI(ME) maintenance and
issuance of
regular updating of
mechanical
database for the
issuance of
mechanical permit
- Crafting of
Citizen's Charter
for the Issuance of
Land Use
Clearances and
permits -Building,
-maintenance and
maintenance and
1MPDO, 1MPDO, 1MPDO, regular updating of
regular updating of
database for the
MPDC 1Zoning 1Zoning 1Zoning database for the
Issuance of Land
Administrator Administrator Administrator Issuance of Land
Use Clearances
Use Clearances
and permits
and permits
-Enactment of
Ordinance on the
creation and Hiring
of 1 Zoning
Administrator
-Conduct of
consultation
meetings and
dialogue with all
developers re:
1MPDO, 1MPDO, 1MPDO, issuance of
1Zoning 1Zoning 1Zoning development
permit
MPDC, Municipal Administrator, Administrator, Administrator, -Coordination
Engineering Office 1EngrI(CE), 1EngrI(CE), 1EngrI(CE), meeting with all
1EngrI(EE), 1EngrI(EE), 1EngrI(EE), agencies involved
1EngrI(SE) 1EngrI(SE) 1EngrI(SE) re: issuance of
development
permit
-Action planning on
all identified issues
and concerns
- Enactment of - Enactment of
Appriations Appriations
Ordinance with Ordinance with
provision for provision for
funding for funding for
constrcution, constrcution,
1ME, 1ME, 1ME, development and development and
1EngrI(CE), 1EngrI(CE), 1EngrI(CE), maintenance of maintenance of
Municipal Engineering Municipal Municipal
1Engr1(ME), 1Engr1(ME), 1Engr1(ME), buildings, cultural buildings, cultural
Office
1Engr1(EE), 1Engr1(EE), 1Engr1(EE), centers, public centers, public
1Engr1(SE) 1Engr1(SE) 1Engr1(SE) parks including parks including
freedom parks, freedom parks,
playgrounds and playgrounds and
sports facilities and sports facilities and
equipment,and equipment,and
other similar other similar
facilities facilities
-Conduct of
-Assessment of quarterly
existing ssessment of
infrastructure re: existing
peace & order and infrastructure re:
1ME, 1ME, 1ME, public safety peace & order and
1EngrI(CE), 1EngrI(CE), 1EngrI(CE), -Enactment of public safety
Municipal Engineering
1Engr1(ME), 1Engr1(ME), 1Engr1(ME), Appropriation -Enactment of
Office ordiannace with Appropriation
1Engr1(EE), 1Engr1(EE), 1Engr1(EE),
the provisions for ordiannace with
1Engr1(SE) 1Engr1(SE) 1Engr1(SE) Sites for police and the provisions for
fire stations and Sites for police and
substations and fire stations and
municipal jail substations and
municipal jail
-Implementation of
strategic plans on
identified municipal
enterprises to be
established
-Strategic planning -Identification of
on formulation of site for
master plan on construction of
municipal municipal
enterprises enterprise
--Enactment of -Exploring
1ME, 1ME, 1ME, Appropriation possibilities of PPP
1EngrI(CE), 1EngrI(CE), 1EngrI(CE), ordinanace with on establishment
Municipal Engineering
1Engr1(ME), 1Engr1(ME), 1Engr1(ME), the provisions for of municipal
Office constructio, enterprise
1Engr1(EE), 1Engr1(EE), 1Engr1(EE),
improvement and --Enactment of
1Engr1(SE) 1Engr1(SE) 1Engr1(SE) maintenance of Appropriation
Public markets, ordinanace with
slaughterhouses, the provisions for
and other constructio,
municipal improvement and
enterprises maintenance of
Public markets,
slaughterhouses,
and other
municipal
enterprises
-Enactment of
ordinance on
master plan of -Continuous
public cemetery implementation of
-Continuous infra projects on
implementation of construction and
1ME, 1ME, 1ME, infra projects on development of
1EngrI(CE), 1EngrI(CE), 1EngrI(CE), construction and public cemetery
Municipal Engineering development of --Enactment of
1Engr1(ME), 1Engr1(ME), 1Engr1(ME), public cemetery Appropriation
Office
1Engr1(EE), 1Engr1(EE), 1Engr1(EE), --Enactment of ordinanace with
1Engr1(SE) 1Engr1(SE) 1Engr1(SE) Appropriation the provisions for
ordinanace with construction,
the provisions for improvement and
construction, maintenance of
improvement and public cemetery
maintenance of
public cemetery
Approved by:
___________________ ______________________________
dministrator/ Local Chief Executive
ent Officer/ Date
be fully assumed by LGU according to Section 17 of the LGC and other pertinent laws on devolution.
ty to be implemented by the LGU under the devolved functions and services.
assume the devolved functions, services, and facilities.
e devolved functions, services, and facilities.
ully assume, absorb, and manage the devolved functions, services, and facilities.
ANNEX F-1
Services, and Facilities for Provinces/Cities/Municipalities
CITIES/MUNICIPALITIES
e Requirements
y Development Funding
FY 2024 FY 2022 FY 2023 FY 2024
[5]
-Updating of
technical 80,000 MLGU - 80,000 MLGU - 80,000 MLGU -
knowledge and CAPITAL CAPITAL CAPITAL
skills for
preparation of OUTLAY OUTLAY OUTLAY
technical 350,000 MLGU 350,000 MLGU 350,000 MLGU
documents re: road - PS - PS - PS
standards
-Refresher course
on technical
knowledge and
skills for
preparation of 50,000 MLGU - 50,000 MLGU - 50,000 MLGU -
technical MOOE MOOE MOOE
documents in
accordance to
National Building
Code
-Revisiting of
strategic plan on
identification of
O&M and ROWA
including all
stakeholders for
monitoring and
evaluation
-Monitoring and
evaluation of site
development of
identified O&M and
ROWA acquired
- -Enactment of
Appropriations
Ordianance with
funding provision
for site
development
-Conduct of
quarterly
assessment of all
infrastracture
facilities
-Implementation of
infra projects to
improve,
rehabilitate,
develop and
construct additional 230,000 MLGU 230,000 MLGU 230,000 MLGU
infrastructure - PS - PS - PS
facilities
-Enactment of
Appropriations
Ordinance with
funding provision
for munciipal roads
and bridges,
rainwater
collectors, water
supply system
-Conduct of
quarterly
assessment of all
infrastracture
facilities
-Implementation of
infra projects to
improve,
rehabilitate,
develop and
construct additional
health facilities
-Enactment of
Appropriations
Ordinance with
funding provision
for health and
sanitation
-Enactment of
Appropriations
Ordinance with
funding provision
for Infrastructure
facilities such as
traffic signals and
road signs and
similar facilities
- -Enactment of
Appropriations
Ordinance with
funding provision
for Infrastructure
facilities such as
terminals
-Enactment of
Appropriations
Ordinance with
funding provision
for tourism facilities
-Conduct of
quarterly
assessment of all 15,000 MLGU - 15,000 MLGU - 15,000 MLGU -
school facilities
-Review and
MOOE MOOE MOOE
monitoring on 700,000 MLGU 700,000 MLGU 700,000 MLGU
implementation of - PS - PS - PS
School
Improvement Plan
--Enactment of
Appropriations
Ordinance with
funding provision
maintenance of
information
services suc as
public library
-Enactment of
Appropriations
Ordinance with
funding provision
construction on
community college
-Maintenance and
regular updating of
database for the
issuance of
demolition permit
-Maintenance and
regular updating of
database for the
350,000 MLGU 350,000 MLGU 350,000 MLGU
issuance of - PS - PS - PS
sanitary permit
-Maintenance and
regular updating of
database for the
issuance of
signage and
billboard permit
-Maintenance and
regular updating of
database for the
issuance of repair
permit
-Maintenance and
regular updating of
database for the
issuance of
occupancy permit
-Maintenance and
regular updating of
database for the
electrical permit
and certificate of
final electrical
inspection
-Maintenance and
regular updating of
database for the
issuance of fencing
permit
-Maintenance and
regular updating of
database for the
issuance of Annual
Building and
Inpection permit
-Maintenance and
regular updating of
database for the
issuance of
mechanical
-maintenance and
regular updating of
database for the
Issuance of Land
Use Clearances
and permits
-maintenance and
regular updating of
database for the
Issuance of
Development
permit
- Enactment of
Appriations
Ordinance with
provision for
funding for
constrcution,
development and
maintenance of
Municipal
buildings, cultural
centers, public
parks including
freedom parks,
playgrounds and
sports facilities and
equipment,and
other similar
facilities
-Conduct of
quarterly
ssessment of
existing
infrastructure re:
peace & order and
public safety
-Enactment of
Appropriation
ordiannace with
the provisions for
Sites for police and
fire stations and
substations and
municipal jail
--Enactment of
Appropriation
ordinanace with
the provisions for
constructio,
improvement and
maintenance of
Public markets,
slaughterhouses,
and other
municipal
enterprises
--Enactment of
Appropriation
ordinanace with
the provisions for
construction,
improvement and
maintenance of
public cemetery
evolution.
C
Current State
Automation of RPTAR's
Automation of eBPLS
Implementation of Revise Revenue Code On process of Queing System
Structure
COMPETENCIES
Lack of storage room for safe keeping Presence of storage room for safe
of COMELEC ballot boxes keeping of Government properties
Lack of service vehicle to supplement one (1) unit 4 wheel vehicle to be use
the need of bank transactions, for bank transactions & conduct joint
dissemenation of delinquencies inspection
Management Systems
ENABLE
Current State of Capacity Desired State of Capacity
Leadership
Linkages
Prepared by:
JUDITH C DUKA
Date
rrent State
Identified Delinquent
Full inventory of all properties MTO & Assessor's Office
properties
Construction of safety
Provision of storage room for safe
storage of government MTO
keeping of Government properties
properties
Approved by:
ITH C DUKA
Date
on of each Capacity Pillar; describes what is working/not working in each pillar; the pillars referred to are (1) structur
d, lastly, (6) leadership.
ovements in Capacity Pillars so that performance goals can be achieved.
nhance the ability of the LGU to achieve its desired performance.
system, process, or people trained.
ntion.
e capacity development intervention within the three-year time frame of the current leadership.
st/budget required for capacity development interventions covered in Year 1.
al stakeholders who can provide the necessary coaching/mentoring/technical assistance in the installation, implemen
Attachment 3-A: Capacity Development Agenda for Provinces/Cities/Municipalities
NDA
ATIONS PROGRAM
Desired State
Funding Requirements
Process
Timeframe Owner/Office
Year 1 Year 2 Year 3 Responsible
2022 HRMO, SB
2023 HRMO, SB
2023 257,868.00 HRMO, SB
Prov'l Treasurer
2022-2023 30,000.00 30,000.00 30,000.00 Office
VICTOR U PERETE
Date
pillars referred to are (1) structure; (2) competencies; (3) management systems; (4) enabling policies; (5)
eadership.
ance in the installation, implementation, and institutionalization of the capacity development intervention.
ANNEX G-1
ovinces/Cities/Municipalities
Updating
Updating
Source of Support/
Technical
Assistance
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
CSC
Source of Support/
Technical
Assistance
MAO, LCE
LCE, MEO
LCE, MEO,
Source of Support/
Technical
Assistance
BPLO, LCE
LCE
LCE
Source of Support/
Technical
Assistance
BAATI, HRMO
PHALTRA, HRMO
PTO,BLGF, HRMO
OFFICE OF TH
ADMIN. AIDE IV
ADMIN. AIDE I
ADMIN. AIDE I
ADMIN. AIDE I
Prepared by: Reviewed by: Approved by:
MUNICIPAL TREASURER
ADMIN. AIDE I
:
__ VICTOR U PERETE
Mayor
ANNEX H
Attachment 4: Proposed Modification to the LGU Organizational Structure
RUCTURE
CASH DIVISION
CASH DISBURSEMENT
CASH CONTROL SECTION
SECTION
ADMIN. AIDE I
ANNEX I
Attachment 5: Proposed Additional Positions to the Plantilla of LGU Personnel
(LBP Form No. 3)
Local Municipal
Disaster Risk
Reduction and vacant 24/1 73761
Management Officer
V
Local Municipal
Disaster Risk
Reduction and vacant 22/1 58153
Management Officer
IV
Local Municipal
Disaster Risk
Reduction and
vacant 18/1 37129
Management Officer
III (Research and
Planning Division)
Local Municipal
Disaster Risk
Reduction and
Management Officer I
(Planning Officer)
Local Municipal
Disaster Risk
Reduction and
vacant 18/1 37129
Management Officer
III (Training
Local and
Municipal
Admin.) Risk
Disaster
Reduction and
field 18/1 37129
Management Officer
III (Operation and
Warning)
Additional Instructions:
1. Prepare the same form for each local economic enterprise/public utility.
2. Separate plantilla using the same format shall be prepared for Casual Employees whose salaries are chargeable against Personal Services appropriation.
3. Only funded vacant positions shall be included in the plantilla. All unfunded vacant positions shall be removed/deleted from the plantilla.
4. LGUs are advised to first fill up the unfilled positions before they propose to expand their staffing pattern.
Note: This form is a consolidation of all LBP Form No. 3-A of all departments and offices in the LGU.