S131 - LEVEL 3 - SOUTH TOWER - GENERAL ARRANGEMENT PLAN Rev.C3 Markup
S131 - LEVEL 3 - SOUTH TOWER - GENERAL ARRANGEMENT PLAN Rev.C3 Markup
S131 - LEVEL 3 - SOUTH TOWER - GENERAL ARRANGEMENT PLAN Rev.C3 Markup
BW4 CERTIFICATION BY OTHERS. BW4 BW4 CERTIFICATION BY OTHERS. BW4 T4 CONSTRUCTION REVIEW RA SB 10.02.21
C1 ISSUED FOR CONSTRUCTION AV SB 06.04.21
BW4
BW4
C2 ISSUED FOR CONSTRUCTION AC SB 07.10.21
BW4
BW4
R.C. HOB
BW4 BW4 200 BW4 BW4 C3 ISSUED FOR CONSTRUCTION AC SB 25.10.21
R.C. HOB
200 200 200 MIN.
R.C. HOB
R.C. HOB
R.C. HOB
R.C. HOB R.C. HOB R.C. HOB
R.C. HOB
R.C. HOB
MIN. R.C. HOB R.C. HOB
R.C. HOB
MIN. MIN.
R.C. HOB
R.C. HOB R.C. HOB R.C. HOB 200
R.C. HOB
R.C. HOB R.C. HOB
R.C. HOB
C3
MIN.
200 HATCH DENOTES
A
PW2
200
PW2
200
C8
C7
A
A
350 THICK DRAWING REFERENCE REFERENCE No.
C8
A
C8
C8
C8
R.C. HOB DOWN PIPE DOWN PIPE DROP PANEL TYP. DOWN PIPE
R.C. HOB DRAWING INDEX S000
DOWN PIPE
BA R.C. HOB R.C. HOB
R.C. HOB R.C. HOB
DOWN PIPE R.C. HOB
GENERAL NOTES
RETENTION
S001-S002
S010-S029
R.C. HOB
PW2
200 200 200 CONCRETE COLUMNS S800-S819
C7
200 200 200 200
A
MIN. MIN. IN-SITU WALLS S820-S879
C8
MIN.
C8
MIN. MIN. SLAB ON GROUND DETAILS S950-S951
BB 200 R.C. HOB R.C. HOB SUSPENDED CONCRETE SLABS S960-S962
200
PW2
A
C8
R.C. STAIR DETAILS S970
C8
MIN. MIN.
200 MASONRY DETAILS S980-S981
C.J
200 BRICK WALL DETAILS S985
MIN. 200 200
MIN.
200 R.C.HOB
MIN. 200 200 MIN.
200 200 200
R.C. HOB
MIN. MIN. 2600 MIN. MIN. MIN. GENERAL ARRANGEMENT LEGEND
PW2
C1
BC xx*
PW2
C8
C3 300 THICK
DROP PANEL 200
)
C8
-DENOTES COLUMN OVER
(o
200
C8
2600
200
Cx
CW2 MIN. CW2
7
MIN.
C1
MIN. -DENOTES WALL OVER
BD
PW2
PW2
PW2*
PW2
T
W1
AF
CW2
200*
200*
200*
CW2
200*
-DENOTES LOAD BEARING ELEMENT UNDER
CW2
CW2
CW2
CW2
SH
LI
LI
LI
200
FT
FT
FT
FT
200
LI
SH
SH
SH
MIN. -DENOTES LOAD BEARING ELEMENT
AF
AF
AF
R.C. HOB MIN.
CW2
T
T
UNDER & OVER
200
PW2
CW2 200 200 -DENOTES BLOCK WALL OVER
C.J
CW2
200 200 200
C8
MIN. 200
PW2
CW2
PW2
MIN. MIN.
PW2*
CW2
CW2
2
C3 C.J. -DENOTES CONSTRUCTION JOINT
PW
BE CW2 CW2 4N20-100 4N20-100
C8
A
200
C8
200 C3
300 THICK -DENOTES SLAB SETDOWN.
R.C. HOB 200 200 STEP
C8
REFER DRAWING S970 FOR 350 THICK DROP PANEL MIN. REFER TO ARCH. DETAILS FOR ALL LEVELS.
MIN.
PW2*
STAIR THICKNESS AND DROP PANEL TYP. MIN.
200
PW2*
PW2
PW2
REINFORCEMENT DETAILS DOWN PIPE
200 200 R.C. HOB -DENOTES SLAB SPAN DIRECTION OF
TYPICAL
DOWN PIPE 1.0 BMT BONDEK
C.J
R.C. HOB 200
C8
PW2*
200
R.C. HOB
DOWN PIPE (REFER TYPICAL DETAILS)
R.C. HOB
R.C. HOB
R.C. HOB
R.C. HOB
PW2
DOWN PIPE 200
R.C. HOB
R.C. HOB
R.C. HOB MIN.
PW2
B
200 MIN. 200 LIGHT WEIGHT FEATURE 200 CAST IN
HO
PW2*
C.
MIN. MIN.
1
FORMWORK LEGEND:
R.
C1
R.C. HOB MIN.
C1
C4
R.C. HOB R.C. HOB R.C. HOB R.C. HOB
BF ALL FORMWORKS SHALL BE OF:-
R.C. HOB R.C. HOB CLASS 3 MIN. - GENERALLY
1
2N20-100
C1
CLASS 2 MIN. - LIVING AREA WITH
EXPOSED CONCRETE FINISH
C3 CLASS 1 MIN. - REFER ARCHITECT
LIGHT WEIGHT FEATURE
(D&C BY OTHERS)
CONSTRUCTION ISSUE
C:\Users\Ramu Karnati\Documents\ASHOK LOCAL FILES\WD19112_159 Epping Rd, Macquarie Park\WD19112_159 Epping Rd, Macquarie Park_LOCAL_Ramu Karnati.rvt
C9 2200 x 220 REFER DWG. S805 FOR DETAIL INSITU CONCRETE COLUMN CLIENT
C9A 2200 x 200 REFER DWG. S805 FOR DETAIL INSITU CONCRETE COLUMN
C9B 2000 x 200 40 INSITU CONCRETE COLUMN
C10 1000 x 250 REFER DWG. S805 FOR DETAIL INSITU CONCRETE COLUMN VIMG
C11 260 x 700 REFER DWG. S805 FOR DETAIL INSITU CONCRETE COLUMN
C12 400 DIA. REFER DWG. S805 FOR DETAIL INSITU CONCRETE COLUMN
PROJECT
C13 2400 x 200 REFER DWG. S805 FOR DETAIL INSITU CONCRETE COLUMN
C14 1000 x 350 REFER DWG. S805 FOR DETAIL INSITU CONCRETE COLUMN 159-161 EPPING ROAD
C15 700 x 350 REFER DWG. S805 FOR DETAIL INSITU CONCRETE COLUMN
C16 1700 x 300 REFER DWG. S805 FOR DETAIL INSITU CONCRETE COLUMN MACQUARIE PARK NSW
NOTES:
REFER TO DRG. S002 FOR THE FOLLOWING NOTES:
C17
C18
1300 x 200
450 x 250
65
40
INSITU CONCRETE COLUMN
INSITU CONCRETE COLUMN
2113
1. DESIGN AND CONSTRUCTION POST-TENSIONING C19 1200 x 250 REFER DWG. S805 FOR DETAIL INSITU CONCRETE COLUMN TITLE
NOTES: PLAN
1. ALL PENETRATIONS TO BE REVIEWED AND RESOLVED. DATE DESIGNED BY CHECKED BY
2. ALL SERVICES PENETRATIONS TO BE CO-ORDINATED AND APPROVED BY WEBBER DESIGN. LEVEL 3 - SOUTH TOWER - SLAB SCHEDULE
3. REBATES AND CAST IN PLATES FOR STRUCTURAL STEEL WORK AND FACADE TO BE OCT 2020 AC AC
CO-ORDINATED WITH ARCHITECT. THICKNESS f'c (MPa) REMARKS
SCALES AT B1 DRAWN BY APPROVED BY
4. CONTRACTOR SHALL ALLOW FOR CONSTRUCTION JOINTS AS REQUIRED. 200 40 MPa PT SLAB BY D&C CONTRACTOR
5. BALUSTRADES ASSUMED TO BE OF LIGHT WEIGHT CONSTRUCTION. As indicated SB AC
200* 40 MPa R.C SLAB (N12-200 TOP & BOTTOM E.W.)
DESIGN AND CERTIFICATION BY OTHERS, TYPICAL.
6. REFER ARCHITECTURAL DRAWINGS FOR R.C HOB'S LOCATION AND DIMENSIONS. REFER DRG. S961 JOB No. DRAWING No. REV.
PRINT TIME: