Professional Documents
Culture Documents
Seminar 2 MMC 17101
Seminar 2 MMC 17101
260
Time
required
for full journey
=450
4503 minutes
150
journey 3 minutes
required for empty
Time
changing & delaysa 6 minutes
delays
required for
Time
for one cycle 12 minutes
Total time
hour = o =
5
trips per
Number of
complete 12
tonnes.
=
25
Output per
hour
4
5 tonnes.
Tractive
force = 6X
O A1.5
1 5Xx 1000 1000
6X1.5 X1000 1.54 X500
7
50 7
1.54 X500 =
1285.8 180 110 +
10 77 1652.8 kgs.
Soeed of haulage =9 km per hour =9000 metres/min
60
1652.8 X 9000
Rope power in KM =
40.5 kw.
60X 102 X60
Minimum power of motor = 40.5X 100 X 100 = 64.3 Kw
70 90
I shall use 8-pole slip-ring induction motor with 725 r.p.m speed,
a
ope kw.
of haulage = 2400 X9000= 58.82
60 X 102 X 60
100 kw.
=58.82 X 100x100
=
Ainimumpo
p o w e r of motor 84 70
Haulage
And Winding
Pumps,
Mine
tub of 0.5 tonna
262 one
tonne e. It has
is using at of 1 in
A mine
at aa gradient of 5. The
Problem 7. depth of
100m
The
raise coal
from a
ten with maximum
sn
maximum speed
o
to be
raised in trains of
vor
your own
reasonable
ofand
10 data of
tubes a r e
hour.
Assume
other
n e e d e d . Give
Give size
n
Km. per haulage
power
of the t n
the required and reasons ons for
calculate
of the haulage
rope that
construction
= 10 Km per hour
= 166 m per minute.
Speed of haulage
10 tonnes.
10 tubs each 1 tonne capacity
=
Size of Rope:
Tension in full rope = G F 10 +5 + 10 +5 tonnes
5 56
5
1.780 X 510 kgs. =
3541 kgs.
10
Haulage in Mines
263
z
TE.X Speed in minute
APof
Motor60 X 76.12 X Gear Effi.
Motor
60 X 76.12 X 0.75
hswer: Assumptions
-eficient offriction of tubs= 66
icient of friction of rope 10
lorcdor oror safety of rope :8 =
200m min.
per min.
2 0 o m per
hours '
2 100tonnes.
17 tonnes.
6
= say,
+
=100
Coa nauled per
hour
al per . 5 min.
2 2.5
= min.
Train
200
me =
500
2 . 5 min.
required
me quired u journey
full
for émptý
ea for
o
journey
7 min.
Rme tor delays = 12 min.
changin a n d c o m p l e t e
cycle
it is 1 ton
0.707
Allowing for
1 X 8 =8tonnes
=
0.63 Ca
load of rope
Breaking
C =V8 0.63=3
Circumference
=
An
An inc 500 meters long,
incline 265
bem Tubs are
le track. Tubs are too
to be dippingiatn1nin 44 is
i t h a s!ngle
ubS
er:Assumnp nption
Co-efficien of friction of tubs =1
56
Co- efficient of friction of rope 1
(i) 10
Gearefficiency 70 %
i)
niameter of drum 80 times diameter of rope
= 80X 1.9 152 cm =1.52 metres.
train =
8 X 600 = 4800 kgs;
Ctalper
2400 kgs.
veghtoftubs= 8 X 300
500 X 1.5 750 kgs.
Weightof 500 metres
=
rope
km per hour
10000 Say 167 metres/min.
Ropespeed= 10 60
4 56 4 10