a 20 mm dia rope

Problems A 40 KM direct rope haulage using


.

shift (taking 4 hours effective


aeals with an output of 100 tonnes per
haulage road 450 metres in length dippina
time ) along a
nauling the number of
own other data, calculate
at 1 in 6.4. Assuming your
in a loaded set. ( Average rope speed can
one tonne capacity tubs

be taken as 9 kms / hour ).


(Second Class, 1975)
speed
= 9 km. per hour
Answer : Average rope = 9000 =150 metres per min.
60
Mine Pumps, Haulage And Vinding

260

Time
required
for full journey
=450
4503 minutes
150
journey 3 minutes
required for empty
Time
changing & delaysa 6 minutes
delays
required for
Time
for one cycle 12 minutes
Total time
hour = o =
5
trips per
Number of
complete 12
tonnes.
=
25
Output per
hour
4
5 tonnes.

Coal per trip or set =4 =


5
tubs in a set = 5
tonne capacity
Number of 1
a r e avallable
in respeca
below
5. The data given
Problem incline
haulage at the top of an
direct rope
500 m
Length of incline
1 in 7
Gradient
tubs per set
6
No. of loaded
1.50 tonnes
loaded tub
Wt. of each hour.
9 km. per
Speed of rope
1.54 kg/metre.
Wt. of rope

Co-efficient of tub friction


50

Co-efficient of rope friction


quired

size of the electric motor in KW requ


Calculate the minimum and moto
of 70%
to work the haulage assuming gear efficiency a
?
you use Class,
efticiency of 90%. What type óf motor would(Second 1974

Answer Tractive force required = G+ F +9,+t


where G Gravitational resistance of full tubs
F Friction of full tubs
9, Gradient resistance of rope
, friction of rope.
Weight of gross loads per set =
6 X 1.5 X 1000 kgs.
Haulage in Mines

Tractive
force = 6X
O A1.5
1 5Xx 1000 1000
6X1.5 X1000 1.54 X500
7
50 7
1.54 X500 =
1285.8 180 110 +
10 77 1652.8 kgs.
Soeed of haulage =9 km per hour =9000 metres/min

60
1652.8 X 9000
Rope power in KM =
40.5 kw.
60X 102 X60
Minimum power of motor = 40.5X 100 X 100 = 64.3 Kw
70 90
I shall use 8-pole slip-ring induction motor with 725 r.p.m speed,
a

supply frequency 50 cycles rating 1 hour.


probler
probles 6 An incline 500 metres long dipping at 1 in 6 is to be
WOTked by a direct rope haulage. The carrying capacity of a tub is
1 tonne and tare is 500 kg. 8 tubs are hauled in each train at a
speed of 9 kilometres per hour. Calculate the power of the haulage
motor in KW if the gear efficiency is 70% and moton efficiency is
84%. Assume co-efficeint offriction for tubs as aand for rope
as Weight of rope is 1.5 kg per metre. (Second class. 1978)

Answer: Tractive force required = G +F+9, +

where, G = Gravitational resistance of full tubs


F Friction of full tubs
9, gradient resistance of rope
f,= friction of rope.
eight of gross loads per set = 8 X ( 1000 + 500) kgs.
= 12000 kgs.

ractive Force =12000 12000 1.5 X5001.6X500


6 10
6 60

2000 + 200 125 + 75 =


2400 kgs.
peed of haulage = 9 km. hour - 9000 metres/ min.
60

ope kw.
of haulage = 2400 X9000= 58.82
60 X 102 X 60
100 kw.
=58.82 X 100x100
=

Ainimumpo
p o w e r of motor 84 70
Haulage
And Winding
Pumps,
Mine
tub of 0.5 tonna
262 one
tonne e. It has
is using at of 1 in
A mine
at aa gradient of 5. The
Problem 7. depth of
100m
The
raise coal
from a
ten with maximum
sn
maximum speed
o
to be
raised in trains of
vor
your own
reasonable
ofand
10 data of
tubes a r e
hour.
Assume
other
n e e d e d . Give
Give size
n
Km. per haulage
power
of the t n
the required and reasons ons for
calculate

of the haulage
rope that
construction

construction of the rope.


(First Class, 1979)
type of
Answer: Assumptions

Co-efficient of friction of tubs 56


=
of rope
Co-efficient of friction
= 8
Factor of safety of rope
75 %
Gear efficiency at a gradient of 1 in 5.
coal to be raised
from a depth of 100m
inclined path
Therefore the length of haulage
510m.
V1002+ (100 X5)2
=
=

= 10 Km per hour
= 166 m per minute.
Speed of haulage
10 tonnes.
10 tubs each 1 tonne capacity
=

Coal hauled per train


=

Tare of 10 tubs 10 X 0.5 = 5 tonnes.

Size of Rope:
Tension in full rope = G F 10 +5 + 10 +5 tonnes
5 56

3+0.269 3.269 tonnes.


Allowing for contingenies, let the tension in full rope be conside red
as 3.5 tonnes.
Breaking load of rope = Rope tension x Factor of Satety

3.5 X8 28 tonnes =0.63c


Circumference of rope =c =V28 +0.63 6.667 cms.

Diameter of Rope Circumf X7 =6.667 X 7 = 2.12 cms


22 22
Weight of rope =
0.04 c2 kg / metre =
1.78 kg. per mere
Tractive effort required G + F +
g1 + f1 Kgs.
3 X 1000 kgs + 0.269 X 1000 kas + 1.780 X 51 Kg

5
1.780 X 510 kgs. =
3541 kgs.
10
Haulage in Mines
263

z
TE.X Speed in minute
APof
Motor60 X 76.12 X Gear Effi.
Motor

3541X 166_ 171.6 H.P. =

60 X 76.12 X 0.75

.G for contingencies a motor of 200 B.H.P would be


Jowingfor
talled.

and Construction of Rope


A2.5 cms. dia. flattened strand 3-wire core (7 around 3)
g's lay type rope will increase flexibility and lesson the risk of
enal fracture. The advantages of the flattened strand ropes

greater strength, (c) greater resistance


greater durability, (b)
1CUShing and less readily forced out of shape, and (d) less
RMdency to twist and stretch in working.
for
0em 8. A direct rope haulage is required to be installed
Particulars of the
e mine to produce 200t of coal per day.
ine are as follows
distance of
inclined path
of the seam 1 in 10;
ation of the
hour; efficiency
speed
of the rope 12 Km. per
0.5t.
tare weight
g r o s s weight of tub 1.5t and
motor is
What type of
out the H.P. of the haulage.
quiredd ? Giv Oive s p e c i f i c a t i o n s of the motor. (First
Class, 1978).

hswer: Assumptions
-eficient offriction of tubs= 66
icient of friction of rope 10
lorcdor oror safety of rope :8 =
200m min.
per min.
2 0 o m per

eed of haulage age given


Km. per
=
hour
12
12
Km effective
hauling time
of

the min SWorking in


2 shifts
with a n

hours '
2 100tonnes.
17 tonnes.
6
= say,
+
=100
Coa nauled per
hour

al per . 5 min.
2 2.5
= min.
Train
200

me =
500
2 . 5 min.

required
me quired u journey
full
for émptý
ea for
o
journey
7 min.
Rme tor delays = 12 min.
changin a n d c o m p l e t e
cycle

Tota ime for a


Haulage And Wi
Mine Pumps,
264
Windin
60+ 12 = 5
=

Trains perhour train=


17 + 55 Say 3.5
=
Say tonnes
per
hauled ight -tare 1.5 - 0.5
-tare = 1.5
Coal
=
Gross
weight
= Say4
1ton
tonne.
Coal per
tub of tubs
train
per train
= Say 4
number
Therefore,
full tubs
=
4 X 1.5 =
6 tonnes.
weight of4
Gross
56t* 70 0.6 +010%.
Tension in full rope
contingencies, let
= G*F=

it is 1 ton
0.707
Allowing for
1 X 8 =8tonnes
=
0.63 Ca
load of rope
Breaking
C =V8 0.63=3
Circumference
=

of rope 3.56 ms (sa


= 0.04C2kg. per metre =
0.04 X 12.7
weight of rope

0.51 kg. per metre.


G + F + g,=
+f, kgs.
Tractive Effortrequired
= 0.6 X 1000 kgs + 0.107 X 1000 kgs. +.51 X500
10
0.51 X500 kgs.
10
600 kgs + 107 kgs + 25.5 kgs+ 25.5 kgs = 758 kgs.

B.H.P. of Motor = 758.0 X 200 47.5 H.P.


60 X 76.12 X0.7

Type of MotorHaving regard to the fact that the haulage w


standing idle during changing times and delays, it will be suina
to install
3-phase, 50 cycles, 550 V grade Slip-Ring Inu
a
Motor having intermittent rating of about 50 BHP unless
extensions or heavier loads are
anticipated.
Specifications: Slip-ring Induction Motor
H.P.
50
Speed 4-Pole 1440 R.P.M.
tator Voltage
550V
Power Factor
0.8
Frequency
Rotor voltage 50 cycles per second
Stator Delta 120 V
Control connected;
Gear: Direct on Rotor Star connected.
fitted with O.C.B. or A.C.B. for the circul
circuit
with gird overload and orA.C.B. for
stator
c i r c u i t conne
or
waterarangements.
and interlocking releases, Rotordedcircuit
no-volt releases;
resistance, contro
sistance controller wiwith reve provided
age
ge nin Mines

An
An inc 500 meters long,
incline 265
bem Tubs are
le track. Tubs are too
to be dippingiatn1nin 44 is
i t h a s!ngle

1.9 tracdiameter, weighing


and
hauled
car.elghing
up
up in sets of
1.5 kgs
gs per 8,
metre.
e 1uoslare
re 300 kgs.would kg of coal. per metre.
n e t e r o fd r u r
adopt
of drum you wOrk the and calculate State what
the B.H.Po
m o t o
o
haulage. Assume full
nelectric
per hour. speed oft
be km.
kn
e 1O
be

ubS
er:Assumnp nption
Co-efficien of friction of tubs =1
56
Co- efficient of friction of rope 1
(i) 10
Gearefficiency 70 %
i)
niameter of drum 80 times diameter of rope
= 80X 1.9 152 cm =1.52 metres.

train =
8 X 600 = 4800 kgs;
Ctalper
2400 kgs.
veghtoftubs= 8 X 300
500 X 1.5 750 kgs.
Weightof 500 metres
=
rope

km per hour
10000 Say 167 metres/min.
Ropespeed= 10 60

Tectiveforce required in Kgs. G +F +9,+,


4800+2400 + 4800 + 2400 + 750 +750

4 56 4 10

1800+ 128.57 + 187.50 + 75 2191.07 kgs.

ope H.P.- 2191.07 X 16780.12 H.P


60 X 76.12
A.P. ofmotor=80.12 X 100= 114.5 H.P.
70
standing
will be
Ving regard to the fact that the haulage be
duifto changinng time
ing and delays,
it will
it
probably
prooo114.5
rating
of
t o install one-hour

nless furthe a anticipated.

8 furt a motor having loads a r e


extensions or h e a r v i e r

You might also like