Eng.

Joao Pedro Amaral REPUBLIC DEMOCRATIC OF TIMOR LESTE


(Regional Enginner Dili, MOP) MINISTRY OF PUBLIC WORKS, TRANSPORT
Eng. Mouzinho Tilman Eng. Aleixo H.G. Lopes da Cruz DIRECTORATE OF ROADS, BRIDGES AND F
(Regional Supervisor Dili, MOP)
(Chefe Depart. de Estradas Municipio de Dili)
Eng. Joao Gregorio de CarvalhoNatalino Bianco
(Chief of Department Construction, M
(Supervisor Municipio de Dili) Road Design Engineer, MOP
Eng.Rui Hernani F. Guteres Regional Supervisor Dili, MOP
(Director Of RBFC, MOP) Regional Enginner Dili, MOP
Director Of RBFC, MOP
CONTRACT PACKAGE No. : ……………….
PROJECT NAME : DILI ROAD AND DRAIN. REHAB. PROJECT : DILI ROAD AND DRAINAGE REH
ROAD SECTION : PALACIO PRESIDENTE - BIDAU SANTANA : PALACIO PRESIDENTE - BIDAU
CONTRACTOR : MONTANA DIAK UNIPESSOAL, LDA Montana Diak Unipessoal, Lda
SUPERVISION : MINISTRY OF PUBLIC WORKS Mr. Lay Fu Seng
MONTHLY CERTIFICATE No. : 01 (Director)
PERIOD COVERED : UP TO OCTOBER 2014
LOCATION : MUNICIPIO DE DILI Municipio de Dili
LINK : MUNICIPIO DE DILI
1 : PALACIO PRESIDENTE - BIDAU S : 2.93 KM Montana Diak Unipessoal, Lda 76.08%
2 : JUNCTION PALACIO PRESIDENTE: 4.09 KM Meteor Unipessoal, Lda 5.78%
3 : JUNCTION INDONESIA EMBASI- J : 1.07 KM Super Jaya Unipessoal, Lda 0%
4 : PALACIO PRESIDENTE-BAIROPI : 4.74 KM Santana Diak Unipessoal, Lda 45.38%
5 : BECORA BRIDGE TO HERA JUNCT: 7.50 KM Fitun Diak Unipessoal, Lda 63.06%
6 : MERCADO LAMA TO CULUHUN BR: 1.66 KM Montana Diak Unipessoal, Lda 72.36%
7 : BEMORI TO LICEDE, TIMOR TRAV : 0.98 KM Montana Diak Unipessoal, Lda 70.47%

City : Dili
Date : October 20, 2014 October 20, 2014
Tender ID No. : ______________
Name of Project : NEW LINE DRAIN AND SAND POCKET CONS
Location of Project : DILI LARAN
Name Company : METEOR UNIPESSOAL LDA
Address : Rua. Bairro Formosa - Dili, East Timor
Mobile : (+670) 77233899
Email : montanadiak@yahoo.com
Contact Name : Mr. Lay Fu Seng
Title : Director

Submitted by: Checked by : Checked by :


Kristian Adoe, ST Natalino Bianco Eng. Joao Pedro Amaral Eng. Aleixo H.G. Lopes d
(Projet Manager) (Supervisor Municipio de Dili) (Regional Enginner Dili, MOP) (Chefe Depart. de Estradas Mun
DEMOCRATIC OF TIMOR LESTE
OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION Eng. Aleixo H.G. Lopes da Cruz
ATE OF ROADS, BRIDGES AND FLOOD CONTROLS
ENG. JOAO GREGORIO DE CARVALHO
CHIEF OF DEPARTMENT CONSTRUCTION, MOP
n Engineer, MOP Eng. Simâo Laranjinha
pervisor Dili, MOP Technic DNEPCC
ginner Dili, MOP Eng. Rogerio Freitas
Technic Support Section
1
: DILI ROAD AND DRAINAGE REHABILITATION PROJECT
: PALACIO PRESIDENTE - BIDAU SANTANA
Montana Diak Unipessoal, Lda
Mr. Lay Fu Seng

Municipio de Dili
MUNICIPIO DE DILI Location Contract No.
Mr. Lay Fu Seng (Director) ANZ 166895 Municipio de Dili …………….
Mrs. Fronica Lim (Directress) ANZ 144033 Municipio de Dili …………….
Ms. King Nhiuc Jong (Directress) ANZ 321467 Municipio de Dili …………….
Ms. Elicy Lay (Directress) ANZ 252016 Municipio de Dili …………….
Mrs. Vera Veronica Lim (Directress) ANZ 109100 Municipio de Dili …………….
Mr. Lay Fu Seng (Director) ANZ 166895 Municipio de Dili …………….
Mr. Lay Fu Seng (Director) ANZ 166895 Municipio de Dili …………….

October 20, 2014

SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS

, East Timor NEW LINE DRAIN AND SAND POCK

Verified by :
Eng. Aleixo H.G. Lopes da Cruz
(Chefe Depart. de Estradas Municipio de Dili)
DE CARVALHO
T CONSTRUCTION, MOP

AN ROADS

NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
BILL OF QUANTITIES

ITEM
ITEM DESCRIPTION UNIT UNIT RATE
NO.

100 GENERAL REQUIREMENTS


101 Facilities for the Engineer Lump Sum
102 Other general requirements Lump Sum
102(1) Mobilization Lump Sum 10,325.49
102(2) Demobilization Lump Sum 6,723.87

200 EARTHWORKS
201(1) Clearing and grubbing Sq.m 0.23
201(3) Individual removal of trees (small) Each 59.27
201(4) Individual removal of trees (large) Each 118.53
201(5) Shoulder clearing L.m 0.16
202(3) Removal and disposal of existing asphalt pavement Sq.m 3.05
203(1) Unsuitable excavation Cu.m 4.64
203(2) Surplus common excavation Cu.m 2.71
203(3) Surplus rock excavation Cu.m 26.91
204(1) Structure excavation Cu.m 5.13
204(2) Bridge excavation Cu.m 5.71
204(3) Foundation fill Cu.m 51.42
204(6) Pipe culvert and drain excavation Cu.m 7.03
205(1) Embankment Cu.m 9.79
205(1)a Embankment from excavation Cu.m 2.19
205(1)b Embankment from borrow Cu.m 25.89
206(1) Subgrade preparation (Common Material) Sq.m 1.04
206(2) Subgrade preparation Sq.m 1.71
206(2)a Subgrade Preparation on Existing Road Sq.m 1.71
206(2)b Subgrade Preparation on Shoulder Sq.m 1.71
206(3) Subgrade preparation (Unsuitable Material) Sq.m 2.09

300 SUBBASE AND BASE COURSE


301 Aggregate subbase course Cu.m 46.11
302 Aggregate base course Cu.m 45.46
303 Crushed aggregate base course Cu.m 60.14
307 Portland cement treated base course Cu.m 68.90

400 SURFACE COURSES AND PAVEMENT


401.1 Gravel Surface Course Cu.m 59.38
402.1 Bituminous Prime Coat (MC-70, Cutback Asphalt) Sq.m 3.85
402.2 Bituminous Tack Coat (RC-___, Cutback Asphalt) Sq.m 4.52
404.5 Sealing of Cracks L.m 1.19
406.1 Bituminous Penetration Macadam Sq.m 25.39
406.2 Bituminous Sand Sheet (Bridge Overlay) Sq.m 7.53
411a Bituminous Concrete Surface Course, Hot Laid (30mm thick) Sq.m 24.10
411b Asphaltic Concrete Wearing Course (AC-WC) t=40mm Sq.m 35.64
411c Bituminous Concrete Surface Course, Hot Laid (50mm thick) Sq.m 39.01
411d Asphaltic Concrete - Base Course (AC-Base) t=60mm Sq.m 54.34
411e Bituminous Concrete Surface Course, Hot Laid (70mm thick) Sq.m 53.92
411f Bituminous Concrete Surface Course, Hot Laid (80mm thick) Sq.m 61.38
411g Bituminous Concrete Surface Course, Hot Laid (Leveling) Ton 312.36
412(1) Portland Cement Concrete Pavement (200 mm thick) Sq.m 43.33
412(2) Portland Cement Concrete Pavement (250 mm thick) Sq.m 50.38

500 BRIDGE CONSTRUCTION


501(3) Steel H-Piles furnished (356mm x 368mm x 20.4mm x 12000mm) Each 3,183.45
501(4) Precast concrete piles furnished (400mm x 400mm x 12000mm) Each 1,376.24
BILL OF QUANTITIES

ITEM
ITEM DESCRIPTION UNIT UNIT RATE
NO.
501(10) Steel H-Piles driven (356mm x 368mm x 20.4mm) L.m 35.41
501(12) Precast concrete piles driven (400mm x 400mm) L.m 38.42
501(15) Precast concrete test piles (400mm x 400mm x 12000mm) Each 1,837.30
501(15)a Steel H-Test Piles (356mm x 368mm x 20.4mm x 12000mm) Each 3,608.40
504(1) Structural steel, furnished, fabricated and erected Kg 2.59
505 Reinforcing steel Kg 1.73
506(1)a Structural concrete class "A" (25 MPa) Cu.m 326.61
506(1)b Structural concrete class "A" (30 MPa) Cu.m 388.16
506(1)c Structural concrete class "A" (35 MPa) Cu.m 405.83
506(6) Lean Concrete (17.5 Mpa) Cu.m 124.60

600 DRAINAGE AND SLOPE PROTECTION WORKS


601(1)a Reinforced concrete pipe culvert, 600mm diameter L.m 348.12
601(1)b Reinforced concrete pipe culvert, 710mm diameter L.m 396.94
601(1)c Reinforced concrete pipe culvert, 1070mm diameter L.m 280.29
601(1)d Reinforced concrete pipe culvert, 1200mm diameter L.m 344.87
601(1)e Corrugated steel pipe culvert, 600mm diameter L.m 163.60
601(1)f Corrugated steel pipe culvert, 1000mm diameter L.m 249.04
601(1)g Corrugated steel pipe culvert, 1200mm diameter L.m 399.22
601(2) Lined Drain L.m 30.00
604(1) Removing, cleaning and stockpiling salvaged culvert pipe L.m 24.19
604(2) Removing, cleaning and re-laying salvaged culvert pipe L.m 48.37
604(3) Cleaning culvert pipe in-place L.m 4.90
604(3)a Cleaning and Reconditioning Culvert Pipe in-place L.m 5.18
604(4)a Cleaning of existing lined drain L.m 2.73
604(4)b Cleaning of existing road side drain (Dili) Cu.m 4.54
604(4)c Remove and reinstall sidewalk paving blocks and concrete drain cover Sq.m 1.36
605(5) Grouted riprap class "A" Cu.m 66.60
606 Stone masonry Cu.m 73.67
610 Gabion Cu.m 68.87
611 Rock Fill Cu.m 38.39

700 MISCELLANEOUS STRUCTURES


701(1) Concrete curb L.m 17.26
701(2) Concrete gutter L.m 9.97
701(3) Combination curb and gutter L.m 24.08
702(1) Sidewalk (100mm thick concrete) Sq.m 21.90
702(2) Sidewalk (concrete paving blocks ) Sq.m 23.92
704(3) Metal guardrail (metal beam) L.m 71.01
706(1) Warning signs Each 195.08
706(2) Regulatory signs Each 218.65
706(3) Informatory signs Each 242.21
707(1) Pavement markings (relfective) Sq.m 2.38
708(2) Reflective pavement studs (raised profile type) Each 71.38
710 Reflectorized Thermoplastic Pavement Markings Sq.m 14.24

800 BIOENGINEERING
801(1) Nursery Establishment, Operation and Management Lump Sum 1,243.40
803(1) Slope Trimming and Preparation Sq.m 0.28
803(2) Spoil Disposal Cu.m 0.93
804(2) Contour Bolsters (300mm) L.m 12.84
804(3) Herringbone Bolsters (600mm) L.m 30.68
805(1) Sowing of Grasses Sq.m 2.04
805(4) Planting of Tree/Shrub, Bamboo and Harwood Cuttings Each 2.03
805(5) Construction of Brush Layers, Pallisades and Fascines L.m 1.23
808(1) Fabrication of Tree Guards Each 1.68
808(2) Maintenance and Aftercare Lump Sum 5,647.81
BILL OF QUANTITIES

ITEM
ITEM DESCRIPTION UNIT UNIT RATE
NO.
Pay Item Item Description Unit

100 GENERAL REQUIREMENTS


101 Material Testing LS
102.1 Contractor's Mobilization Ls
102.3 Contractor's Demobilization Ls
103.1 Relocation of Public Utilities (Electrical pole) nos
103.2 Relocation of Public Utilities (Telephone pole) nos
103.3 Relocation of Public Utilities (Compensasion for water line) LS
104 Traffic Management System & Safety Ls

105 Progress Report Ls


106 Survey and Drawing Ls

200 EARTHWORKS
201.1 Clearing and Grubbing Hectare
201.2 Individual Removal of Tree (giant) Each
201.3 Individual Removal of Trees (Large) Each
201.4 Individual Removal of Trees (Small) Each
202.2 Removal of Existing Pipe Culvert and Lined Drain Ln.m
202.3 Removal and Disposal of Existing Asphalt Pavement Sq.m
202.4 Demolition Existing Structure Sq.m
202.5 Demolition Existing Paving and Kerb Stone Sq.m
203.1 Soft Rock Excavation Cu.m
203.2 Rock Excavation Cu.m
203.3 Structure Excavation Cu.m
203.4 Unsuitable Excavation Cu.m
203.5 Pipe Culvert and Lined Drain Excavation Cu.m
204.1a Structure Excavation For Pothole Cu.m
204.1b Structure Excavation Cu.m
205.1 Embankment Cu.m
205.2 Sand bedding under Side Walk Cu.m
205.3 Aanstamping Cu.m
205.4 Granular Fill Material Cu.m
206.1 Subgrade Preparation (Common Material) Sq.m
206.2 Subgrade Preparation (Existing Pavement) Sq.m

300 SUB BASE AND BASE COURSE


301 Aggregate Subbase Course Cu.m
303.1 Crushed Aggregate Base Course, Grading A Cu.m
307 Portland Cement Treated Base Course Cu.m

400 SURFACE COURSE


401.1 Gravel Surface Course Cu.m
402.1 Bituminous Prime Coat (MC-70, Cutback Asphalt) Sq.m
403 Bituminous Tack Coat (RC , Cutback Asphalt) Sq.m
404.5 Sealing of Cracks L.m
406.1 Bituminous Penetration Macadam Sq.m
406.2 Bituminous Sand Sheet (Bridge Overlay) Sq.m
411.1 Asphalt Concrete Binder Course (ACBC), 60mm thick Sq.m
411.5a Hot Rolled Asphalt 50mm thick (Overlay) Sq.m
411.2 Asphalt Concrete Binder Course (ACBC), 50mm thick Sq.m
411.3 Asphalt Concrete Wearing Course (ACWC), 40mm thick Sq.m
411.4 Asphalt Concrete Wearing Course (ACWC), 30mm thick Sq.m
411.5 Asphalt Concrete Binder Course - Leveling (ACBC-L) Ton
412.1 Portland Cement Concrete Pavement, 200 mm thick Sq.m
412.2 Portland Cement Concrete Pavement, 250 mm thick Sq.m

500 BRIDGE CONSTRUCTION


502 Railing 3" diameter Ln.m
505.2 Reinforcing Steel Kg
506.1 Structural Concrete Class "A" (25 MPa) Cu.m
506.1a Structural Concrete (21 MPa) Cu.m
506.1b Structural Concrete (17 MPa) Cu.m
506.2 Structural Concrete Class "A" (30 MPa) Cu.m
506.5 Seal Concrete Cu.m
506.6 Lean Concrete Cu.m
512 Paint for Railing Sq.m

600 DRAINAGE AND SLOPE PROTECTION STRUCTURES


601.11 RCPC 600mm diameter Ln.m
601.211 RCPC 800mm diameter Ln.m
601.3 RCPC 1000mm diameter Ln.m
601.4 RCPC 1200mm diameter Ln.m
602.1 Pipe Culvert, RCPC Ø 500 mm Ln.m
601.5 RCPC 1500mm diameter Ln.m
603 Inlet Cover Each
604.1 Cleaning Culvert Pipe In-place Ln.m
604.2 Cleaning of Existing Lined Drain Ln.m
604.3 Removing, Cleaning and Stockpiling Salvaged Culvert Pipe Ln.m
604.4 PVC 4" Dia. Ln.m
604.5 PVC 6" Dia. Ln.m
604.6 Concrete Plaster Sq.m
601.1 Steel Grill Cover Opening for Manhole Each
601.2 Steel Grill Cover Opening for Sand Pocket Each
604.7 Steel Grill Each
604.8 Concrete Lined Drain 25 Mpa Cu.m
605 Riprap Cu.m
606 Stone Masonry Cu.m
607 Boulder Soiling Cu.m
610 Gabions Cu.m

700 MISCELLANEOUS STRUCTURES


701.1 Concrete Curb Ln.m
701.2 Concrete Gutter Ln.m
701.3 Painting of Curb Ln.m
702 Paving Block For Sidewalk Sq.m
705 Fencing (for median road, h = 0.8m) Ln.m
706.1 Warning Signs Each
706.2 Regulatory Signs Each
706.3 Informatory Signs Each
707 Reflectorized Thermoplastic Pavement Markings Sq.m

800 BIOENGINEERING
805 Planting of Tree Each
808.1 Fabrication of Tree Guards Nos
808.2 Maintenance and Aftercare Each-Day
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 202.3
ITEM DESCRIPTION : Removal and Disposal of Existing Asphalt Pavement
Page 1 of 11

Sketch :
Left
Midle

Rigth

PALACIO DO GOVERNO TO TIMOR PLAZA

NO STA Left Midle Rigth Area Remarks


Long (m) Wide (m) Long (m) Wide (m) Long (m) Wide (m) (Sq.m)

1 PH 1 1.35 1.35 1.90 1.80 1.45 0.85 6.48

2 PH 2 1.45 1.80 2.61

3 PH 3 1.05 2.10 1.90 2.90 7.72

4 PH 4 1.70 0.80 0.85 1.40 2.55

5 PH 5 2.33 1.15 2.68

6 PH 6 4.10 4.70 2.05 2.00 1.35 0.86 24.53

7 PH 7 0.60 2.20 2.25 5.20 2.30 4.35 23.03

8 PH 8 2.45 2.16 5.29

9 PH 9 3.70 1.37 5.07

10 PH 10 3.70 1.23 4.55

11 PH 11 10.63 0.92 9.73

12 PH 12 2.54 1.34 3.40

13 PH 13 5.30 1.52 8.06


5.21
SUB TOTAL 105.68
MOVING FROM PAGE - 0.00
TOTAL 105.68

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 202.3
ITEM DESCRIPTION : Removal and Disposal of Existing Asphalt Pavement
Page 2 of 11

Sketch :
Left
Midle

Rigth

PALACIO DO GOVERNO TO TIMOR PLAZA

NO STA Left Midle Rigth Area Remarks


Long (m) Wide (m) Long (m) Wide (m) Long (m) Wide (m) (Sq.m)

14 PH 14 3.63 1.38 5.01

15 PH 15 3.89 2.58 1.80 2.20 14.00

16 PH 16 4.70 0.80 3.76

17 PH 17

18 PH 18 2.85 1.50 4.28

19 PH 19 2.40 6.04 7.70 0.80 20.66

20 PH 20 8.10 4.49 36.33

21 PH 21 1.10 0.85 6.48 6.95 45.94

SUB TOTAL 129.96


MOVING FROM PAGE -1 105.68
TOTAL 235.64

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 202.3
ITEM DESCRIPTION : Removal and Disposal of Existing Asphalt Pavement
Page 3 of 11

Sketch :

Left
Midle

Rigth

MARCADO LAMA TO CULUHUN

NO STA Left Midle Rigth Area Remarks


Long (m) Wide (m) Long (m) Wide (m) Long (m) Wide (m) (Sq.m)

22 PH 1 4.00 3.60 0.90 2.70 5.20 6.90 53.99

23 PH 2 1.55 17.20 26.66

24 PH 3 3.55 1.95 0.20 1.65 0.85 1.50 8.52

25 PH 4 1.20 1.10 2.30 1.10 0.85 3.10 6.49

26 PH 5 1.20 0.60 10.08 3.26 28.25

27 PH 6 0.95 1.65 1.57

28 PH 7 0.85 1.50 1.28

29 PH 8 1.20 1.10 1.32

30 PH 9 3.55 1.95 6.92

31 PH 10 3.58 5.75 1.95 2.75 25.92

32 PH 11 0.85 3.10 0.85 2.20 4.51

33 PH 12 0.85 1.10 0.85 0.85 1.66

34 PH 13 1.38 16.00 2.20 1.90 1.75 0.90 27.76

SUB TOTAL 194.83


MOVING FROM PAGE -2 235.64
TOTAL 430.47

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 202.3
ITEM DESCRIPTION : Removal and Disposal of Existing Asphalt Pavement
Page 4 of 11

Sketch :
Left
Midle

Rigth

MARCADO LAMA TO CULUHUN

NO STA Left Midle Rigth Area Remarks


Long (m) Wide (m) Long (m) Wide (m) Long (m) Wide (m) (Sq.m)

35 PH 14 2.60 2.30 5.98

36 PH 15 2.35 0.85 1.10 1.05 3.90 2.48 12.81

37 PH 16 0.85 17.50 14.88

38 PH 17 1.20 4.05 4.86

39 PH 18 1.20 1.20 1.44

40 PH 19 1.70 2.60 4.42

SUB TOTAL 44.38


MOVING FROM PAGE -3 430.47
TOTAL 474.85

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 202.3
ITEM DESCRIPTION : Removal and Disposal of Existing Asphalt Pavement
Page 5 of 11

Sketch :
Left
Midle

Rigth

SANTACRUZ TO TUGU PRAMUKA

NO STA Left Midle Rigth Area Remarks


Long (m) Wide (m) Long (m) Wide (m) Long (m) Wide (m) (Sq.m)

41 PH 1 1.50 0.85 1.28

42 PH 2 1.60 0.90 1.44

43 PH 3 3.30 0.90 2.97

44 PH 4 1.50 3.30 4.95

45 PH 5 12.90 0.90 1.40 1.00 13.01

46 PH 6 1.55 3.40 5.30 2.30 17.46

47 PH 7 1.70 1.40 2.38

48 PH 8 1.65 1.75 2.89

49 PH 9 3.80 2.70 10.26

50 PH 10 2.50 7.00 17.50

51 PH 11 0.90 1.60 1.44

52 PH 12 1.65 2.88 1.70 1.25 6.87

53 PH 13 1.10 1.85 2.04

SUB TOTAL 84.48


MOVING FROM PAGE -4 474.85
TOTAL 559.33

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 202.3
ITEM DESCRIPTION : Removal and Disposal of Existing Asphalt Pavement
Page 6 of 11

Sketch :
Left
Midle

Rigth

SANTACRUZ TO TUGU PRAMUKA

NO STA Left Midle Rigth Area Remarks


Long (m) Wide (m) Long (m) Wide (m) Long (m) Wide (m) (Sq.m)

54 PH 14 1.65 1.30 2.15

55 PH 15 2.80 6.00 16.80

56 PH 16 2.00 9.00 18.00

57 PH 17 4.10 2.50 10.25

58 PH 18 6.20 1.80 11.16

59 PH 19 5.70 2.40 13.68

60 PH 20 3.10 1.20 3.72

61 PH 21 16.60 1.56 25.90

62 PH 22 17.40 1.00 17.40

SUB TOTAL 119.05


MOVING FROM PAGE -5 559.33
TOTAL 678.38

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 202.3
ITEM DESCRIPTION : Removal and Disposal of Existing Asphalt Pavement
Page 7 of 11

Sketch :
Left
Midle

Rigth

COLMERA

NO STA Left Midle Rigth Area Remarks


Long (m) Wide (m) Long (m) Wide (m) Long (m) Wide (m) (Sq.m)

63 PH 1 0.00

64 PH 2 0.00

SUB TOTAL 0.00


MOVING FROM PAGE -6 678.38
TOTAL 678.38

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 202.3
ITEM DESCRIPTION : Removal and Disposal of Existing Asphalt Pavement
Page 8 of 11

Sketch :
Left
Midle

Rigth

HUDILARAN

NO STA Left Midle Rigth Area Remarks


Long (m) Wide (m) Long (m) Wide (m) Long (m) Wide (m) (Sq.m)

65 PH 1 0.00

66 PH 2 0.00

67 PH 3 0.00

68 PH 4 0.00

69 PH 5 0.00

70 PH 6 0.00

71 PH 7 0.00

SUB TOTAL 0.00


MOVING FROM PAGE -7 678.38
TOTAL 678.38

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 202.3
ITEM DESCRIPTION : Removal and Disposal of Existing Asphalt Pavement
Page 9 of 11

Sketch :
Left
Midle

Rigth

AIMUTIN

NO STA Left Midle Rigth Area Remarks


Long (m) Wide (m) Long (m) Wide (m) Long (m) Wide (m) (Sq.m)

72 PH 1 0.00

73 PH 2 0.00

74 PH 3 0.00

75 PH 4 0.00

76 PH 5 0.00

77 PH 6 0.00

78 PH 7 0.00

82 PH 8 0.00

83 PH 9 0.00

84 PH 10 0.00

SUB TOTAL 0.00


MOVING FROM PAGE -8 678.38
TOTAL 678.38

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 202.3
ITEM DESCRIPTION : Removal and Disposal of Existing Asphalt Pavement
Page 10 of 11

Sketch :
Left
Midle

Rigth

TASITOLU

NO STA Left Midle Rigth Area Remarks


Long (m) Wide (m) Long (m) Wide (m) Long (m) Wide (m) (Sq.m)

79 PH 1 3.70 1.40 5.18

80 PH 2 8.00 1.65 13.20

81 PH 3 2.25 1.45 3.26

82 PH 4 4.00 1.95 7.80

83 PH 5 3.10 3.90 3.60 1.20 16.41

84 PH 6 4.60 2.20 10.12

85 PH 7 5.60 2.30 12.88

SUB TOTAL 68.85


MOVING FROM PAGE -9 678.38
TOTAL 747.23

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 202.3
ITEM DESCRIPTION : Removal and Disposal of Existing Asphalt Pavement
Page 11 of 11

Sketch :
Left
Midle

Rigth

PANTAI KELAPA

NO STA Left Midle Rigth Area Remarks


Long (m) Wide (m) Long (m) Wide (m) Long (m) Wide (m) (Sq.m)

86 PH 1 9.20 4.00 36.80

87 PH 2 2.65 5.35 14.18

SUB TOTAL 50.98


MOVING FROM PAGE -10 747.23
TOTAL 798.21

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 202.5
ITEM DESCRIPTION : Demolition Existing Paving and Kerb Stone
Page 1 of 1

Sketch :
Left

Midle

Rigth

NO STA Left Midle Rigth Area Remarks


Long (m) Wide (m) Long (m) Wide (m) Long (m) Wide (m) (Sq.m)

1 Link-2 412.00 1.20 162.00 1.20 688.80

2 Link-3 286.00 1.20 274.00 1.20 672.00

3 Link-4 198.00 1.20 186.00 1.20 460.80

2.40
SUB TOTAL 1,821.60
MOVING FROM PAGE - 0.00
TOTAL 1,821.60

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 1 of 15

Sketch :

PALACIO DO GOVERNO TO TIMOR PLAZA


DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Thick Volume Remarks
(Sq.m) (Sq.m) (m) (Qu.m)

1 PH 1 1.35 1.35 1.90 1.80 1.45 0.85 6.48


6.48 0.25 1.62
2 PH 1 1.35 1.35 1.90 1.80 1.45 0.85 6.48

3 PH 2 1.45 1.80 2.61


2.61 0.25 0.65
4 PH 2 1.45 1.80 2.61

5 PH 3 1.05 2.10 1.90 2.90 7.72


7.72 0.25 1.93
6 PH 3 1.05 2.10 1.90 2.90 7.72

7 PH 4 1.70 0.80 0.85 1.40 2.55


2.55 0.25 0.64
8 PH 4 1.70 0.80 0.85 1.40 2.55

9 PH 5 2.33 1.15 2.68


2.68 0.25 0.67
10 PH 5 2.33 1.15 2.68

11 PH 6 4.10 4.70 2.05 2.00 1.35 0.86 24.53


24.53 0.25 6.13
12 PH 6 4.10 4.70 2.05 2.00 1.35 0.86 24.53

13 PH 7 0.60 2.20 2.25 5.20 2.30 4.35 23.03


23.03 0.25 5.76
14 PH 7 0.60 2.20 2.25 5.20 2.30 4.35 23.03

SUB TOTAL 17.40


MOVING FROM PAGE - -
TOTAL 17.40

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 2 of 15

Sketch :

PALACIO DO GOVERNO TO TIMOR PLAZA


DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

15 PH 8 2.45 2.16 5.29


5.29 0.25 1.32
16 PH 8 2.45 2.16 5.29

17 PH 9 3.70 1.37 5.07


5.07 0.25 1.27
18 PH 9 3.70 1.37 5.07

19 PH 10 3.70 1.23 4.55


4.55 0.25 1.14
20 PH 10 3.70 1.23 4.55

21 PH 11 10.63 0.92 9.73


9.73 0.25 2.43
22 PH 11 10.63 0.92 9.73

23 PH 12 2.54 1.34 3.40


3.40 0.25 0.85
24 PH 12 2.54 1.34 3.40

25 PH 13 5.30 1.52 8.06


8.06 0.25 2.01
26 PH 13 5.30 1.52 8.06

27 PH 14 3.63 1.38 5.01


5.01 0.25 1.25
28 PH 14 3.63 1.38 5.01

SUB TOTAL 10.28


MOVING FROM PAGE -1 17.40
TOTAL 27.67

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 3 of 15

Sketch :

PALACIO DO GOVERNO TO TIMOR PLAZA


DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

29 PH 15 3.89 2.58 1.80 2.20 14.00


14.00 0.25 3.50
30 PH 15 3.89 2.58 1.80 2.20 14.00

31 PH 16 4.70 0.80 3.76


3.76 0.25 0.94
32 PH 16 4.70 0.80 3.76

33 PH 17 -
- 0.25 -
34 PH 17 -

35 PH 18 2.85 1.50 4.28


4.28 0.25 1.07
36 PH 18 2.85 1.50 4.28

37 PH 19 2.40 6.04 7.70 0.80 20.66


20.66 0.25 5.16
38 PH 19 2.40 6.04 7.70 0.80 20.66

39 PH 20 8.10 4.49 36.33


36.33 0.25 9.08
40 PH 20 8.10 4.49 36.33

41 PH 21 1.10 0.85 6.48 6.95 45.94


45.94 0.25 11.48
42 PH 21 1.10 0.85 6.48 6.95 45.94

SUB TOTAL 31.24


MOVING FROM PAGE -2 27.67
TOTAL 58.91

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 4 of 15

Sketch :

MARCADO LAMA TO CULUHUN


DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

43 PH 1 4.00 3.60 0.90 2.70 5.20 6.90 53.99


53.99 0.25 13.50
44 PH 1 4.00 3.60 0.90 2.70 5.20 6.90 53.99

45 PH 2 1.55 17.20 26.66


26.66 0.25 6.67
46 PH 2 1.55 17.20 26.66

47 PH 3 3.55 1.95 0.20 1.65 0.85 1.50 8.52


8.52 0.25 2.13
48 PH 3 3.55 1.95 0.20 1.65 0.85 1.50 8.52

49 PH 4 1.20 1.10 2.30 1.10 0.85 3.10 6.49


6.49 0.25 1.62
50 PH 4 1.20 1.10 2.30 1.10 0.85 3.10 6.49

51 PH 5 1.20 0.60 10.08 3.26 33.56


33.56 0.25 8.39
52 PH 5 1.20 0.60 10.08 3.26 33.56

53 PH 6 0.95 1.65 1.57


1.57 0.25 0.39
54 PH 6 0.95 1.65 1.57

55 PH 7 0.85 1.50 1.28


1.28 0.25 0.32
56 PH 7 0.85 1.50 1.28

SUB TOTAL 33.02


MOVING FROM PAGE -3 58.91
TOTAL 91.93

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 5 of 15

Sketch :

MARCADO LAMA TO CULUHUN


DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

43 PH 8 1.20 1.10 1.32


1.32 0.25 0.33
44 PH 8 1.20 1.10 1.32

45 PH 9 3.55 1.95 6.92


6.92 0.25 1.73
46 PH 9 3.55 1.95 6.92

47 PH 10 3.58 5.75 1.95 2.75 25.92


25.92 0.25 6.48
48 PH 10 3.58 5.75 1.95 2.75 25.92

49 PH 11 0.85 3.10 0.85 2.20 4.51


4.51 0.25 1.13
50 PH 11 0.85 3.10 0.85 2.20 4.51

51 PH 12 0.85 1.10 0.85 0.85 1.66


1.66 0.25 0.41
52 PH 12 0.85 1.10 0.85 0.85 1.66

53 PH 13 1.38 16.00 2.20 1.90 1.75 0.90 27.76


27.76 0.25 6.94
54 PH 13 1.38 16.00 2.20 1.90 1.75 0.90 27.76

55 PH 14 2.60 2.30 5.98


5.98 0.25 1.50
56 PH 14 2.60 2.30 5.98

SUB TOTAL 18.51


MOVING FROM PAGE -4 91.93
TOTAL 110.44

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 6 of 15

Sketch :

MARCADO LAMA TO CULUHUN


DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

57 PH 15 2.35 0.85 1.10 1.05 3.90 2.48 12.81


12.81 0.25 3.20
58 PH 15 2.35 0.85 1.10 1.05 3.90 2.48 12.81

59 PH 16 0.85 17.50 14.88


14.88 0.25 3.72
60 PH 16 0.85 17.50 14.88

61 PH 17 1.20 4.05 4.86


4.86 0.25 1.22
62 PH 17 1.20 4.05 4.86

63 PH 18 1.20 1.20 1.44


1.44 0.25 0.36
64 PH 18 1.20 1.20 1.44

65 PH 19 1.70 2.60 4.42


4.42 0.25 1.11
66 PH 19 1.70 2.60 4.42

SUB TOTAL 9.60


MOVING FROM PAGE -5 110.44
TOTAL 120.04

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 7 of 15

Sketch :

SANTACRUZ TO TUGU PRAMUKA


DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

67 PH 1 1.50 0.85 1.28


1.28 0.25 0.32
68 PH 1 1.50 0.85 1.28

69 PH 2 1.60 0.90 1.44


1.44 0.25 0.36
70 PH 2 1.60 0.90 1.44

71 PH 3 3.30 0.90 2.97


2.97 0.25 0.74
72 PH 3 3.30 0.90 2.97

73 PH 4 1.50 3.30 4.95


4.95 0.25 1.24
74 PH 4 1.50 3.30 4.95

75 PH 5 12.90 0.90 1.40 1.00 13.01


13.01 0.25 3.25
76 PH 5 12.90 0.90 1.40 1.00 13.01

77 PH 6 1.55 3.40 5.30 2.30 17.46


17.46 0.25 4.37
78 PH 6 1.55 3.40 5.30 2.30 17.46

79 PH 7 1.70 1.40 2.38


2.38 0.25 0.60
80 PH 7 1.70 1.40 2.38

SUB TOTAL 10.87


MOVING FROM PAGE -6 120.04
TOTAL 130.91

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 8 of 15

Sketch :

SANTACRUZ TO TUGU PRAMUKA


DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

81 PH 8 1.65 1.75 2.89


2.89 0.25 0.72
82 PH 8 1.65 1.75 2.89

83 PH 9 3.80 2.70 10.26


10.26 0.25 2.57
84 PH 9 3.80 2.70 10.26

85 PH 10 2.50 7.00 17.50


17.50 0.25 4.38
86 PH 10 2.50 7.00 17.50

87 PH 11 0.90 1.60 1.44


1.44 0.25 0.36
88 PH 11 0.90 1.60 1.44

89 PH 12 1.65 2.88 1.70 1.25 6.87


6.87 0.25 1.72
90 PH 12 1.65 2.88 1.70 1.25 6.87

91 PH 13 1.10 1.85 2.04


2.04 0.25 0.51
92 PH 13 1.10 1.85 2.04

93 PH 14 1.65 1.30 2.15


2.15 0.25 0.54
94 PH 14 1.65 1.30 2.15

SUB TOTAL 10.78


MOVING FROM PAGE -7 130.91
TOTAL 141.70

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 9 of 15

Sketch :

SANTACRUZ TO TUGU PRAMUKA


DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

95 PH 15 2.80 6.00 16.80


16.80 0.25 4.20
96 PH 15 2.80 6.00 16.80

97 PH 16 2.00 9.00 18.00


18.00 0.25 4.50
98 PH 16 2.00 9.00 18.00

99 PH 17 4.10 2.50 10.25


10.25 0.25 2.56
100 PH 17 4.10 2.50 10.25

101 PH 18 6.20 1.80 11.16


11.16 0.25 2.79
102 PH 18 6.20 1.80 11.16

103 PH 19 5.70 2.40 13.68


13.68 0.25 3.42
104 PH 19 5.70 2.40 13.68

105 PH 20 3.10 1.20 3.72


3.72 0.25 0.93
106 PH 20 3.10 1.20 3.72

107 PH 21 16.60 1.56 25.90


25.90 0.25 6.47
108 PH 21 16.60 1.56 25.90

SUB TOTAL 24.88


MOVING FROM PAGE -8 141.70
TOTAL 166.57

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 10 of 15

Sketch :

COLMERA
DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

117 PH 1 -
- 0.25 -
118 PH 1 -

119 PH 2 -
- 0.25 -
120 PH 2 -

SUB TOTAL -
MOVING FROM PAGE -9 166.57
TOTAL 166.57

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 11 of 15

Sketch :

HUDILARAN
DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

121 PH 1 -
- 0.25 -
122 PH 1 -

123 PH 2 -
- 0.25 -
124 PH 2 -

125 PH 3 -
- 0.25 -
126 PH 3 -

127 PH 4 -
- 0.25 -
128 PH 4 -

129 PH 5 -
- 0.25 -
130 PH 5 -

131 PH 6 -
- 0.25 -
132 PH 6 -

133 PH 7 -
- 0.25 -
134 PH 7 -

SUB TOTAL -
MOVING FROM PAGE -10 166.57
TOTAL 166.57

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 12 of 15

Sketch :

AIMUTIN
DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

135 PH 1 -
- 0.25 -
136 PH 1 -

137 PH 2 -
- 0.25 -
138 PH 2 -

139 PH 3 -
- 0.25 -
140 PH 3 -

141 PH 4 -
- 0.25 -
142 PH 4 -

143 PH 5 -
- 0.25 -
144 PH 5 -

145 PH 6 -
- 0.25 -
146 PH 6 -

147 PH 7 -
- 0.25 -
148 PH 7 -

SUB TOTAL -
MOVING FROM PAGE -11 166.57
TOTAL 166.57

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 13 of 15

Sketch :

AIMUTIN
DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

149 PH 8 -
- 0.25 -
150 PH 8 -

151 PH 9 -
- 0.25 -
152 PH 9 -

153 PH 10 -
- 0.25 -
154 PH 10 -

SUB TOTAL -
MOVING FROM PAGE -12 166.57
TOTAL 166.57

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 14 of 15

Sketch :

TASITOLU
DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

149 PH 1 3.70 1.40 5.18


5.18 0.25 1.30
150 PH 1 3.70 1.40 5.18

151 PH 2 8.00 1.65 13.20


13.20 0.25 3.30
152 PH 2 8.00 1.65 13.20

153 PH 3 2.25 1.45 3.26


3.26 0.25 0.82
154 PH 3 2.25 1.45 3.26

149 PH 4 4.00 1.95 7.80


7.80 0.25 1.95
150 PH 4 4.00 1.95 7.80

151 PH 5 3.10 3.90 3.60 1.20 16.41


16.41 0.25 4.10
152 PH 5 3.10 3.90 3.60 1.20 16.41

153 PH 6 4.60 2.20 10.12


10.12 0.25 2.53
154 PH 6 4.60 2.20 10.12

155 PH 7 5.60 2.30 12.88


12.88 0.25 3.22
156 PH 7 5.60 2.30 12.88

SUB TOTAL 17.21


MOVING FROM PAGE -13 166.57
TOTAL 183.79

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1a
ITEM DESCRIPTION : Structure Excavation For Pothole
Page 15 of 15

Sketch :

PANTAI KELAPA
DIMENSION (m) Section Average
NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

149 PH 1 9.20 4.00 36.80


36.80 0.25 9.20
150 PH 1 9.20 4.00 36.80

151 PH 2 2.65 5.35 14.18


14.18 0.25 3.54
152 PH 2 2.65 5.35 14.18

SUB TOTAL 12.74


MOVING FROM PAGE -14 183.79
TOTAL 196.53

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 203.4
ITEM DESCRIPTION : Unsuitable Excavation
Page 1 of 5

Sketch :

for Line Drain

DIMENSION (m) Section Average


NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (m) (Qu.m)

1 Link-2, Left 1.00 1.00 1.00


1.00 123.60 123.60
1.00 1.00 1.00

2 Link-2, Right 1.00 1.00 1.00


1.00 283.20 283.20
1.00 1.00 1.00

3 Link-3, Left 1.00 1.00 1.00


1.00 408.00 408.00
1.00 1.00 1.00

4 Link-3, Right 1.00 1.00 1.00


1.00 408.00 408.00
1.00 1.00 1.00

5 Link-4, Left 1.00 1.00 1.00


1.00 115.60 115.60
1.00 1.00 1.00

SUB TOTAL 1,338.40


MOVING FROM PAGE - -
TOTAL 1,338.40

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 203.4
ITEM DESCRIPTION : Unsuitable Excavation
Page 2 of 5

Sketch :

for Line Drain

DIMENSION (m) Section Average


NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

6 Link-4, Right 1.00 1.00 1.00


1.00 204.00 204.00
1.00 1.00 1.00

7 Link-5, Left 1.00 1.00 1.00


1.00 102.90 102.90
1.00 1.00 1.00

8 Link-5, Right 1.00 1.00 1.00


1.00 13.50 13.50
1.00 1.00 1.00

9 Link-6, Left 1.00 1.00 1.00


1.00 80.00 80.00
1.00 1.00 1.00

10 Link-6, Right 1.00 1.00 1.00


1.00 80.00 80.00
1.00 1.00 1.00

SUB TOTAL 480.40


MOVING FROM PAGE -1 1,338.40
TOTAL 1,818.80

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 203.4
ITEM DESCRIPTION : Unsuitable Excavation
Page 3 of 5

Sketch :

for Concrete Gutter

DIMENSION (m) Section Average


NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (m) (Qu.m)

11 Link-2, Left 0.60 0.16 0.10


0.10 283.10 27.18
0.60 0.16 0.10

12 Link-2, Right 0.60 0.16 0.10


0.10 269.00 25.82
0.60 0.16 0.10

13 Link-3, Left 0.60 0.16 0.10


0.10 427.20 41.01
0.60 0.16 0.10

14 Link-3, Right 0.60 0.16 0.10


0.10 430.80 41.36
0.60 0.16 0.10

15 Link-4, Left 0.60 0.16 0.10


0.10 204.00 19.58
0.60 0.16 0.10

SUB TOTAL 154.95


MOVING FROM PAGE -2 1,818.80
TOTAL 1,973.75

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 203.4
ITEM DESCRIPTION : Unsuitable Excavation
Page 4 of 5

Sketch :

for Concrete Gutter

DIMENSION (m) Section Average


NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

16 Link-4, Right 0.60 0.16 0.10


0.10 173.10 16.62
0.60 0.16 0.10

17 Link-5, Left 0.60 0.16 0.10


0.10 118.00 11.33
0.60 0.16 0.10

18 Link-5, Right 0.60 0.16 0.10


0.10 105.00 10.08
0.60 0.16 0.10

19 Link-6, Left 0.60 0.16 0.10


0.10 90.00 8.64
0.60 0.16 0.10

20 Link-6, Right 0.60 0.16 0.10


0.10 90.00 8.64
0.60 0.16 0.10

SUB TOTAL 55.31


MOVING FROM PAGE -3 1,973.75
TOTAL 2,029.06

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 203.4
ITEM DESCRIPTION : Unsuitable Excavation
Page 5 of 5

Sketch :

for RCPC

DIMENSION (m) Section Average


NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

21 Link-2, Left 0.80 1.00 0.80


0.80 18.00 14.40
0.80 1.00 0.80

22 Link-3, Left 0.80 1.00 0.80


0.80 90.00 72.00
0.80 1.00 0.80

23 Link-3, Right 0.80 1.00 0.80


0.80 80.00 64.00
0.80 1.00 0.80

SUB TOTAL 150.40


MOVING FROM PAGE -4 2,029.06
TOTAL 2,179.46

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 203.5
ITEM DESCRIPTION : Pipe Culvert and Lined Drain Excavation
Page 1 of 2

Sketch :

DIMENSION (m) Section Average


NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (m) (Qu.m)

1 0 + 100 1.20 1.00 1.20


1.20 25.00 30.00
2 0 + 125 1.20 1.00 1.20
1.20 25.00 30.00
3 0 + 150 1.20 1.00 1.20
1.20 25.00 30.00
4 0 + 175 1.20 1.00 1.20
1.20 25.00 30.00
5 0 + 200 1.20 1.00 1.20
0.60 25.00 15.00
6 0 + 225 -
- 25.00 -
7 0 + 250 -
- 25.00 -
8 0 + 275 -
- 25.00 -
9 0 + 300 -
- 25.00 -
10 0 + 325 -
- 25.00 -
11 0 + 350 -
- 25.00 -
12 0 + 375 -
- 25.00 -
13 0 + 400 -
- 25.00 -
14 0 + 425 -
- 25.00 -
15 0 + 450 -
SUB TOTAL 135.00
MOVING FROM PAGE - -
TOTAL 135.00

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 203.5
ITEM DESCRIPTION : Pipe Culvert and Lined Drain Excavation
Page 2 of 2

Sketch :

DIMENSION (m) Section Average


NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

16 0 + 450 1.20 1.00 1.20


1.20 25.00 30.00
17 0 + 475 1.20 1.00 1.20
1.20 25.00 30.00
18 0 + 500 1.20 1.00 1.20
1.20 25.00 30.00
19 0 + 525 1.20 1.00 1.20
0.60 25.00 15.00
20 0 + 550 -
- 25.00 -
21 0 + 575 -
- 25.00 -
22 0 + 600 -
- 25.00 -
23 0 + 625 -
- 25.00 -
24 0 + 650 -
- 25.00 -
25 0 + 675 -
- 25.00 -
26 0 + 700 -
- 25.00 -
27 0 + 725 -
- 25.00 -
28 0 + 750 -
- 25.00 -
29 0 + 775 -
- 25.00 -
30 0 + 800 -
SUB TOTAL 105.00
MOVING FROM PAGE -1 135.00
TOTAL 240.00

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 205.1
ITEM DESCRIPTION : Embankment
Page 1 of 2

Sketch :

Thick.
Wide

Wide Thick. Average Average Distance Volume


NO STA Wide Thick. Remarks
(m) (m) (m) (m) (m) (Cu.m)

1 0 + 440 1.20 0.10


1.20 0.10 10.00 1.200
2 0 + 450 1.20 0.10
1.20 0.10 25.00 3.000
3 0 + 475 1.20 0.10
1.20 0.10 25.00 3.000
4 0 + 500 1.20 0.10
1.20 0.10 25.00 3.000
5 0 + 525 1.20 0.10
1.20 0.10 25.00 3.000
6 0 + 550 1.20 0.10
1.20 0.10 25.00 3.000
7 0 + 575 1.20 0.10
1.20 0.10 25.00 3.000
8 0 + 600 1.20 0.10
1.20 0.10 25.00 3.000
9 0 + 625 1.20 0.10
1.20 0.10 25.00 3.000
10 0 + 650 1.20 0.10
1.20 0.10 10.00 1.200
11 0 + 660 1.20 0.10

12

13

14

15
1.00
SUB TOTAL 26.400
MOVING FROM PAGE - 0.000
TOTAL 26.400

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
Page 2 of 2

Sketch :

Thick.
Wide

Wide Thick. Average Average Distance


NO STA Wide Thick. Volume Remarks
(m) (m) (m) (m) (m) (cu.m)

1 0 + 440 1.20 0.10


1.20 0.10 10.00 1.20
2 0 + 450 1.20 0.10
1.20 0.10 25.00 3.00
3 0 + 475 1.20 0.10
1.20 0.10 25.00 3.00
4 0 + 500 1.20 0.10
1.20 0.10 25.00 3.00
5 0 + 525 1.20 0.10
1.20 0.10 25.00 3.00
6 0 + 550 1.20 0.10
1.20 0.10 25.00 3.00
7 0 + 575 1.20 0.10
1.20 0.10 25.00 3.00
8 0 + 600 1.20 0.10
1.20 0.10 25.00 3.00
9 0 + 625 1.20 0.10
1.20 0.10 25.00 3.00
10 0 + 650 1.20 0.10
1.20 0.10 10.00 1.20
11 0 + 660 1.20 0.10

12

13

14

15
1.00
SUB TOTAL 26.40
MOVING FROM PAGE -1 0.00
TOTAL 26.40

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 204.1b
ITEM DESCRIPTION : Structure Excavation
Page 1 of 3

Sketch :

DIMENSION (m) Section Average


NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

1 EMBASSY AUSSY 1.00 1.00 1.00


1.00 348.10 348.10
2 EMBASSY AUSSY 1.00 1.00 1.00

3 SP COMORO 4.00 2.00 8.00


8.00 26.00 208.00
4 SP COMORO 4.00 2.00 8.00

SUB TOTAL 556.10


MOVING FROM PAGE - -
TOTAL 556.10

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 205.2
ITEM DESCRIPTION : Sand bedding under Side Walk
Page 1 of 2

Sketch :

Thick. Sand bedding

Wide

Wide Thick. Average Average Distance Volume


NO STA Wide Thick. Remarks
(m) (m) (m) (m) (m) (Cu.m)

1 EMBASSY AUSSY 1.20 0.15


1.20 0.15 348.10 62.66
1.20 0.15

SUB TOTAL 62.66


MOVING FROM PAGE - 0.00
TOTAL 62.66

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 205.2
ITEM DESCRIPTION : Sand bedding under Side Walk
Page 2 of 2

Sketch :

Thick. Sand bedding

Wide

Wide Thick. Average Average Distance


NO STA Wide Thick. Volume Remarks
(m) (m) (m) (m) (m) (cu.m)

SUB TOTAL 0.00


MOVING FROM PAGE -1 62.66
TOTAL 62.66

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 205.4
ITEM DESCRIPTION : Granular Fill Material
Page 1 of 3

Sketch :

Thick. for Line Drain

Wide

Wide Thick. Average Average Distance Volume


NO STA Wide Thick. Remarks
(m) (m) (m) (m) (m) (Cu.m)

1 Link-2, Left 1.00 0.10


1.00 0.10 123.60 12.36
1.00 0.10

2 Link-2, Right 1.00 0.10


1.00 0.10 283.20 28.32
1.00 0.10

3 Link-3, Left 1.00 0.10


1.00 0.10 408.00 40.80
1.00 0.10

4 Link-3, Right 1.00 0.10


1.00 0.10 408.00 40.80
1.00 0.10

5 Link-4, Left 1.00 0.10


1.00 0.10 115.60 11.56
1.00 0.10

0.40
SUB TOTAL 133.84
MOVING FROM PAGE - 0.00
TOTAL 133.84

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 205.4
ITEM DESCRIPTION : Granular Fill Material
Page 2 of 3

Sketch :

Thick. for Line Drain

Wide

Wide Thick. Average Average Distance


NO STA Wide Thick. Volume Remarks
(m) (m) (m) (m) (m) (cu.m)

6 Link-4, Right 1.00 0.10


1.00 0.10 204.00 20.40
1.00 0.10

7 Link-5, Left 1.00 0.10


1.00 0.10 102.90 10.29
1.00 0.10

8 Link-5, Right 1.00 0.10


1.00 0.10 13.50 1.35
1.00 0.10

9 Link-6, Left 1.00 0.10


1.00 0.10 80.00 8.00
1.00 0.10

10 Link-6, Right 1.00 0.10


1.00 0.10 80.00 8.00
1.00 0.10

0.40
SUB TOTAL 48.04
MOVING FROM PAGE -1 133.84
TOTAL 181.88

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 205.4
ITEM DESCRIPTION : Granular Fill Material
Page 3 of 3

Sketch :

Thick. for RCPC

Wide

Wide Thick. Average Average Distance


NO STA Wide Thick. Volume Remarks
(m) (m) (m) (m) (m) (cu.m)

11 Link-2, Left 0.80 0.10


0.80 0.10 18.00 1.44
0.80 0.10

12 Link-3, Left 0.80 0.10


0.80 0.10 90.00 7.20
0.80 0.10

13 Link-3, Right 0.80 0.10


0.80 0.10 80.00 6.40
0.80 0.10

0.30
SUB TOTAL 15.04
MOVING FROM PAGE -2 181.88
TOTAL 196.92

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 301
ITEM DESCRIPTION : Aggregate Subbase Course
Page 1 of 1

Sketch :

CL

Wide Thick. Average Average Distance Volume


NO STA Wide Thick. Remarks
(m) (m) (m) (m) (m) (Cu.m)

1 Link-2 1.80 0.15


1.80 0.15 1.90 0.51
1.80 0.15

2 Link-3, Left 0.00 0.15


0.00 0.15 0.00 0.00
0.00 0.15

3 Link-3, Right 0.00 0.15


0.00 0.15 0.00 0.00
0.00 0.15

4 Link-5 2.90 0.15


2.90 0.15 1.90 0.83
2.90 0.15

5 Link-6 1.40 0.15


1.40 0.15 0.85 0.18
1.40 0.15

0.60
SUB TOTAL 1.52
MOVING FROM PAGE - 0.00
TOTAL 1.52

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 303.1
ITEM DESCRIPTION : Crushed Aggregate Base Course, Grading A
Page 1 of 1

Sketch :

CL

Wide Thick. Average Average Distance Volume


NO STA Wide Thick. Remarks
(m) (m) (m) (m) (m) (Cu.m)

0.00
SUB TOTAL 0.000
MOVING FROM PAGE - 0.000
TOTAL 0.000

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 307
ITEM DESCRIPTION : Portland Cement Treated Base Course
Page 1 of 1

Sketch :

CL

Wide Thick. Average Average Distance Volume


NO STA Wide Thick. Remarks
(m) (m) (m) (m) (m) (Cu.m)

0.00
SUB TOTAL 0.000
MOVING FROM PAGE - 0.000
TOTAL 0.000

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 403
ITEM DESCRIPTION : Bituminous Tack Coat (RC , Cutback Asphalt)
Page 1 of 5

Sketch : Tack Coat


CL

Wide

PALACIO DO GOVERNO TO TIMOR PLAZA


Wide Average Distance Area
NO STA Wide Remarks
(m) (m) (m) (Sq.m)

1 PH 6 4.10
4.10 4.70 19.270
2 PH 6 4.10

3 PH 7 2.05
2.05 2.00 4.100
4 PH 7 2.05

5 PH 8 1.35
1.35 0.86 1.161
6 PH 8 1.35

7 PH 9 2.30
2.30 4.35 10.005
8 PH 9 2.30

SUB TOTAL 34.536


MOVING FROM PAGE - 0.000
TOTAL 34.536

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
Page 2 of 5

Sketch : Tack Coat


CL

Wide

TASITOLU
Wide Average Distance Area
NO STA Wide Remarks
(m) (m) (m) (Sq.m)

9 PH 1 3.70
3.70 1.40 5.180
10 PH 1 3.70

11 PH 2 1.45
1.45 2.25 3.263
12 PH 2 1.45

13 PH 3 1.65
1.65 8.00 13.200
14 PH 3 1.65

15 PH 4 4.00
4.00 1.95 7.800
16 PH 4 4.00

17 PH 5 6.70
6.70 5.10 34.170
18 PH 5 6.70

19 PH 6 3.60
3.60 1.20 4.320
20 PH 6 3.60

21 PH 7 2.20
2.20 4.60 10.120
22 PH 7 2.20

SUB TOTAL 78.053


MOVING FROM PAGE -1 34.536
TOTAL 112.589

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
Page 3 of 5

Sketch : Tack Coat


CL

Wide

PANTAI KELAPA
Wide Average Distance Area
NO STA Wide Remarks
(m) (m) (m) (Sq.m)

23 PH 1 4.00
4.00 9.20 36.800
24 PH 1 4.00

25 PH 2 2.65
2.65 5.35 14.178
26 PH 2 2.65

SUB TOTAL 50.978


MOVING FROM PAGE -2 112.589
TOTAL 163.566

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
Page 4 of 5

Sketch : Tack Coat


CL

Wide

SANTACRUZ TO TUGU PRAMUKA


Wide Average Distance Area
NO STA Wide Remarks
(m) (m) (m) (Sq.m)

1 PH 8 1.65
1.65 1.75 2.888
2 PH 8 1.65

3 PH 9 3.80
3.80 2.70 10.260
4 PH 9 3.80

5 PH 11 0.90
0.90 1.60 1.440
6 PH 11 0.90

7 PH 12 1.65
1.65 2.88 4.744
8 PH 12 1.65

9 PH 13 1.10
1.10 1.85 2.035
10 PH 13 1.10

11 PH 14 1.65
1.65 1.30 2.145
12 PH 14 1.65

13 PH 15 2.80
2.80 6.00 16.800
14 PH 15 2.80

SUB TOTAL 40.311


MOVING FROM PAGE -3 163.566
TOTAL 203.877

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
Page 5 of 5

Sketch : Tack Coat


CL

Wide

SANTACRUZ TO TUGU PRAMUKA


Wide Average Distance Area
NO STA Wide Remarks
(m) (m) (m) (Sq.m)

15 PH 16 17.40
17.40 1.00 17.400
16 PH 16 17.40

17 PH 17 1.56
1.56 16.60 25.896
18 PH 17 1.56

19 PH 18 3.10
3.10 1.20 3.720
20 PH 18 3.10

21 PH 19 5.70
5.70 2.40 13.680
22 PH 19 5.70

23 PH 20 6.20
6.20 1.80 11.160
24 PH 20 6.20

25 PH 21 4.10
4.10 2.50 10.250
26 PH 21 4.10

SUB TOTAL 82.106


MOVING FROM PAGE -4 203.877
TOTAL 285.983

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 402.1
ITEM DESCRIPTION : Bituminous Prime Coat (MC-70, Cutback Asphalt)
Lembar Page 1 of 2

Sketch : Prime Coat


CL

Lebar Lebar Panjang Lapis Resap


NO STA Rata2 Pengikat Volume Ket
(m) (m) (m) ( Ltr/M2) (Ltr)

1 89 + 440 4.00
4.00 10.00 0.90 36.000
2 89 + 450 4.00
4.00 25.00 0.90 90.000
3 89 + 475 4.00
4.00 25.00 0.90 90.000
4 89 + 500 4.00
4.00 25.00 0.90 90.000
5 89 + 525 4.00
4.00 25.00 0.90 90.000
6 89 + 550 4.00
4.00 25.00 0.90 90.000
7 89 + 575 4.00
4.00 25.00 0.90 90.000
8 89 + 600 4.00
4.00 25.00 0.90 90.000
9 89 + 625 4.00
4.00 25.00 0.90 90.000
10 89 + 650 4.00
4.00 10.00 0.90 36.000
11 89 + 660 4.00

12
220.00
SUB TOTAL 792.000
MOVING FROM PAGE - 0.000
TOTAL 792.000

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
Lembar Page 2 of 2

Sketch : Prime Coat


CL

Lebar Lebar Panjang Lapis Resap


NO STA Rata2 Pengikat Volume Ket
(m) (m) (m) ( Ltr/M2) (Ltr)

1 89 + 440 4.00
4.00 10.00 0.90 36.000
2 89 + 450 4.00
4.00 25.00 0.90 90.000
3 89 + 475 4.00
4.00 25.00 0.90 90.000
4 89 + 500 4.00
4.00 25.00 0.90 90.000
5 89 + 525 4.00
4.00 25.00 0.90 90.000
6 89 + 550 4.00
4.00 25.00 0.90 90.000
7 89 + 575 4.00
4.00 25.00 0.90 90.000
8 89 + 600 4.00
4.00 25.00 0.90 90.000
9 89 + 625 4.00
4.00 25.00 0.90 90.000
10 89 + 650 4.00
4.00 10.00 0.90 36.000
11 89 + 660 4.00

12
220.00
SUB TOTAL 792.000
MOVING FROM PAGE -1 792.000
TOTAL 1,584.000

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 403
ITEM DESCRIPTION : Bituminous Tack Coat (RC , Cutback Asphalt)
Page 1 of 2

Sketch : Tack Coat


CL

Wide

Wide Average Distance Area


NO STA Wide Remarks
(m) (m) (m) (Sq.m)

1 Link-1 8.00
8.00 225.00 1,800.00
8.00

2 Link-2 8.00
8.00 275.00 2,200.00
8.00

3 Link-3 8.00
8.00 431.00 3,448.00
8.00

4 Link-4 8.00
8.00 164.00 1,312.00
8.00

5 Link-5 6.00
6.00 145.00 870.00
6.00

SUB TOTAL 9,630.00


MOVING FROM PAGE - 0.00
TOTAL 9,630.00

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 403
ITEM DESCRIPTION : Bituminous Tack Coat (RC , Cutback Asphalt)
Page 2 of 2

Sketch : Tack Coat


CL

Wide

Wide Average Distance Area


NO STA Wide Remarks
(m) (m) (m) (Sq.m)

6 Link-6 6.00
6.00 41.00 246.000
6.00

SUB TOTAL 246.000


MOVING FROM PAGE -1 9,630.000
TOTAL 9,876.000

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 403
ITEM DESCRIPTION : Bituminous Tack Coat (RC , Cutback Asphalt)
Page 1 of 2

Sketch : Tack Coat


CL

Lebar Lebar Lapis Panjang


NO STA L/C/R Rata2 Perekat Volume Ket
(m) (m) ( Ltr/M2) (m) (Ltr)

1 85 + 300 L 4.00
4.05 0.30 25.00 30.375
2 85 + 325 4.10
4.05 0.30 25.00 30.375
3 85 + 350 4.00
4.00 0.30 25.00 30.000
4 85 + 375 4.00
4.05 0.30 25.00 30.375
5 85 + 400 C 4.10
4.05 0.30 25.00 30.375
6 85 + 425 4.00
3.98 0.30 25.00 29.813
7 85 + 450 3.95
3.95 0.30 25.00 29.625
8 85 + 475 3.95
3.98 0.30 25.00 29.813
9 85 + 500 R 4.00
3.95 0.30 25.00 29.625
10 85 + 525 3.90
3.90 0.30 25.00 29.250
11 85 + 550 3.90
3.95 0.30 25.00 29.625
12 85 + 575 4.00
4.05 0.30 25.00 30.375
13 85 + 600 C 4.10

14

15
3.60
SUB TOTAL 359.625
MOVING FROM PAGE - 0.000
TOTAL 359.625

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
Page 2 of 2

Sketch : Tack Coat


CL

Lebar Lebar Lapis Panjang


NO STA L/C/R Rata2 Perekat Volume Ket
(m) (m) ( Ltr/M2) (m) (Ltr)

1 85 + 600 C 4.10
4.05 0.30 25.00 30.375
2 85 + 625 4.00
4.00 0.30 25.00 30.000
3 85 + 650 4.00
4.00 0.30 25.00 30.000
4 85 + 675 4.00
4.00 0.30 25.00 30.000
5 85 + 700 L 4.00
4.00 0.30 25.00 30.000
6 85 + 725 4.00
4.00 0.30 25.00 30.000
7 85 + 750 4.00
4.00 0.30 25.00 30.000
8 85 + 775 4.00
4.00 0.30 25.00 30.000
9 85 + 800 C 4.00
4.05 0.30 25.00 30.375
10 85 + 825 4.10
4.10 0.30 25.00 30.750
11 85 + 850 4.10
4.10 0.30 25.00 30.750
12 85 + 875 4.10
4.15 0.30 25.00 31.125
13 85 + 900 R 4.20

14

15
3.60
SUB TOTAL 363.375
MOVING FROM PAGE -1 359.625
TOTAL 723.000

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 411.5a
ITEM DESCRIPTION : Hot Rolled Asphalt 50mm thick (Overlay)
Page 1 of 5

Sketch : CL

Wide

PALACIO DO GOVERNO TO TIMOR PLAZA


Wide Average Distance Area
NO STA Wide Remarks
(m) (m) (m) (Sq.m)

1 PH 6 4.10
4.10 4.70 19.270
2 PH 6 4.10

3 PH 7 2.05
2.05 2.00 4.100
4 PH 7 2.05

5 PH 8 1.35
1.35 0.86 1.161
6 PH 8 1.35

7 PH 9 2.30
2.30 4.35 10.005
8 PH 9 2.30

SUB TOTAL 34.536


MOVING FROM PAGE - 0.000
TOTAL 34.536

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 411.5a
ITEM DESCRIPTION : Hot Rolled Asphalt 50mm thick (Overlay)
Page 2 of 5

Sketch : CL

Wide

TASITOLU
Wide Average Distance Area
NO STA Wide Remarks
(m) (m) (m) (Sq.m)

1 PH 1 3.70
3.70 1.40 5.180
2 PH 1 3.70

3 PH 2 1.45
1.45 2.25 3.263
4 PH 2 1.45

5 PH 3 1.65
1.65 8.00 13.200
6 PH 3 1.65

7 PH 4 4.00
4.00 1.95 7.800
8 PH 4 4.00

9 PH 5 6.70
6.70 5.10 34.170
10 PH 5 6.70

11 PH 6 3.60
3.60 1.20 4.320
12 PH 6 3.60

13 PH 7 2.20
2.20 4.60 10.120
14 PH 7 2.20

SUB TOTAL 78.053


MOVING FROM PAGE -1 34.536
TOTAL 112.589

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 411.5a
ITEM DESCRIPTION : Hot Rolled Asphalt 50mm thick (Overlay)
Page 3 of 5

Sketch : CL

Wide

PANTAI KELAPA
Wide Average Distance Area
NO STA Wide Remarks
(m) (m) (m) (Sq.m)

1 PH 1 4.00
4.00 9.20 36.800
2 PH 1 4.00

3 PH 2 2.65
2.65 5.35 14.178
4 PH 2 2.65

SUB TOTAL 50.978


MOVING FROM PAGE -2 112.589
TOTAL 163.566

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 411.5a
ITEM DESCRIPTION : Hot Rolled Asphalt 50mm thick (Overlay)
Page 4 of 5

Sketch : CL

Wide

SANTACRUZ TO TUGU PRAMUKA


Wide Average Distance Area
NO STA Wide Remarks
(m) (m) (m) (Sq.m)

1 PH 8 1.65
1.65 1.75 2.888
2 PH 8 1.65

3 PH 9 3.80
3.80 2.70 10.260
4 PH 9 3.80

5 PH 11 0.90
0.90 1.60 1.440
6 PH 11 0.90

7 PH 12 1.65
1.65 2.88 4.744
8 PH 12 1.65

9 PH 13 1.10
1.10 1.85 2.035
10 PH 13 1.10

11 PH 14 1.65
1.65 1.30 2.145
12 PH 14 1.65

13 PH 15 2.80
2.80 6.00 16.800
14 PH 15 2.80

SUB TOTAL 40.311


MOVING FROM PAGE -3 163.566
TOTAL 203.877

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 411.5a
ITEM DESCRIPTION : Hot Rolled Asphalt 50mm thick (Overlay)
Page 5 of 5

Sketch : CL

Wide

SANTACRUZ TO TUGU PRAMUKA


Wide Average Distance Area
NO STA Wide Remarks
(m) (m) (m) (Sq.m)

1 PH 16 17.40
17.40 1.00 17.400
2 PH 16 17.40

3 PH 17 1.56
1.56 16.60 25.896
4 PH 17 1.56

5 PH 18 3.10
3.10 1.20 3.720
6 PH 18 3.10

7 PH 19 5.70
5.70 2.40 13.680
8 PH 19 5.70

9 PH 20 6.20
6.20 1.80 11.160
10 PH 20 6.20

11 PH 21 4.10
4.10 2.50 10.250
12 PH 21 4.10

SUB TOTAL 82.106


MOVING FROM PAGE -4 203.877
TOTAL 285.983

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 411.3
ITEM DESCRIPTION : Asphalt Concrete Wearing Course (ACWC), 40mm thick
Lembar Page 1 of 2

Sketch :

CL

Lebar Tebal Lebar Tebal Panjang


NO STA L/C/R Rata2 Rata2 Volume Ket
(m) ( Cm ) (m) ( Cm ) (m) ( m 3)

1 85 + 300 L 4.00 5.00


4.05 4.99 25.00 5.056
2 85 + 325 4.10 4.99
4.05 4.98 25.00 5.044
3 85 + 350 4.00 4.98
4.00 4.97 25.00 4.969
4 85 + 375 4.00 4.96
4.05 4.96 25.00 5.018
5 85 + 400 C 4.10 4.95
4.05 4.97 25.00 5.031
6 85 + 425 4.00 4.99
3.98 5.01 25.00 4.975
7 85 + 450 3.95 5.03
3.95 5.04 25.00 4.981
8 85 + 475 3.95 5.06
3.98 5.08 25.00 5.049
9 85 + 500 R 4.00 5.10
3.95 5.09 25.00 5.024
10 85 + 525 3.90 5.08
3.90 5.06 25.00 4.936
11 85 + 550 3.90 5.05
3.95 5.04 25.00 4.975
12 85 + 575 4.00 5.03
4.05 5.01 25.00 5.075
13 85 + 600 C 4.10 5.00

14

15
60.20
SUB TOTAL 60.132
MOVING FROM PAGE - 0.000
TOTAL 60.132

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 411.3
ITEM DESCRIPTION : Asphalt Concrete Wearing Course (ACWC), 40mm thick
Page 2 of 2

Sketch :
CL

Lebar Tebal Lebar Tebal Panjang


NO STA Rata2 Rata2 Volume Ket
(m) ( Cm ) (m) ( Cm ) (m) ( m 3)

1 85 + 600 C 4.10 5.00


4.05 5.04 25.00 5.100
2 85 + 625 4.00 5.08
4.00 5.11 25.00 5.113
3 85 + 650 4.00 5.15
4.00 5.19 25.00 5.188
4 85 + 675 4.00 5.23
4.00 5.26 25.00 5.263
5 85 + 700 L 4.00 5.30
4.00 5.29 25.00 5.288
6 85 + 725 4.00 5.28
4.00 5.26 25.00 5.263
7 85 + 750 4.00 5.25
4.00 5.24 25.00 5.238
8 85 + 775 4.00 5.23
4.00 5.21 25.00 5.213
9 85 + 800 C 4.00 5.20
4.05 5.18 25.00 5.240
10 85 + 825 4.10 5.15
4.10 5.13 25.00 5.253
11 85 + 850 4.10 5.10
4.10 5.08 25.00 5.202
12 85 + 875 4.10 5.05
4.15 5.03 25.00 5.213
13 85 + 900 R 4.20 5.00

14

15
62.00
SUB TOTAL 62.571
MOVING FROM PAGE -1 60.132
TOTAL 122.703

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 411.3
ITEM DESCRIPTION : Asphalt Concrete Wearing Course (ACWC), 40mm thick
Page 1 of 2

Sketch : CL

Wide

Wide Average Distance Area


NO STA Wide Remarks
(m) (m) (m) (Sq.m)

1 Link-1 8.00
8.00 225.00 1,800.00
8.00

2 Link-2 8.00
8.00 275.00 2,200.00
8.00

3 Link-3 8.00
8.00 431.00 3,448.00
8.00

4 Link-4 8.00
8.00 164.00 1,312.00
8.00

5 Link-5 6.00
6.00 145.00 870.00
6.00

SUB TOTAL 9,630.000


MOVING FROM PAGE - 0.000
TOTAL 9,630.000

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 411.3
ITEM DESCRIPTION : Asphalt Concrete Wearing Course (ACWC), 40mm thick
Page 2 of 2

Sketch : CL

Wide

Wide Average Distance Area


NO STA Wide Remarks
(m) (m) (m) (Sq.m)

6 Link-6 6.00
6.00 41.00 246.000
6.00

SUB TOTAL 246.000


MOVING FROM PAGE -1 9,630.000
TOTAL 9,876.000

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 505.2
ITEM DESCRIPTION : Reinforcing Steel
Page 1 of 2

Sketch :
b

a
For Sand Pocket
.1
2

a
1.50

b1
.80
0 0
0.6

c
50
2

3 00
b1

a b
DIMENSION (every 1m long) Bar Weight
NO STA transverse direction long. direction Dist. 1m Distance Volume Remarks
a1 b1 total each dia. long each dia (m) (Kg) (L.m) (Kg)

1 a 4.00 25.80 8.00 5 13 1.00 54 13 94.00 1.0328 51.20 4,970.55

2 b 4.00 2.00 0.50 5 13 1.00 34 13 36.50 1.0422 4.00 152.16

3 c 0.80 0.30 2.20 12 13 1.00 7 13 33.07 1.0422 12.00 413.53

SUB TOTAL 5,536.24


MOVING FROM PAGE - -
TOTAL 5,536.24

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 505.2
ITEM DESCRIPTION : Reinforcing Steel
Page 2 of 2

Sketch :

For entrance

DIMENSION (every 1m long) Bar Weight


NO STA transverse direction long. direction Dist. 1m Distance Volume Remarks
a1 b1 total each dia. long each dia (m) (Kg) (L.m) (Kg)

SUB TOTAL -
MOVING FROM PAGE -1 5,536.24
TOTAL 5,536.24

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 506.1b
ITEM DESCRIPTION : Structural Concrete (17 MPa)
Page 1 of 11

Sketch :

PALACIO DO GOVERNO TO TIMOR PLAZA


DIMENSION (m) Section
NO STA long wide long wide long wide Area Thick Volume Remarks
(L.m) (L.m) (L.m) (L.m) (L.m) (L.m) (Sq.m) (L.m) (Qu.m)

1 PH 1 1.35 1.35 1.90 1.80 1.45 0.85 6.48 0.20 1.30

2 PH 2 1.45 1.80 2.61 0.20 0.52

3 PH 3 1.05 2.10 1.90 2.90 7.72 0.20 1.54

4 PH 4 1.70 0.80 0.85 1.40 2.55 0.20 0.51

5 PH 5 2.33 1.15 2.68 0.20 0.54

6 PH 6 4.10 4.70 2.05 2.00 1.35 0.86 24.53 0.20 4.91

7 PH 7 0.60 2.20 2.25 5.20 2.30 4.35 23.03 0.20 4.61

8 PH 8 2.45 2.16 5.29 0.20 1.06

9 PH 9 3.70 1.37 5.07 0.20 1.01

10 PH 10 3.70 1.23 4.55 0.20 0.91

11 PH 11 10.63 0.92 9.73 0.20 1.95

12 PH 12 2.54 1.34 3.40 0.20 0.68

13 PH 13 5.30 1.52 8.06 0.20 1.61

14 PH 14 3.63 1.38 5.01 0.20 1.00

SUB TOTAL 22.14


MOVING FROM PAGE - -
TOTAL 22.14

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 506.1b
ITEM DESCRIPTION : Structural Concrete (17 MPa)
Page 2 of 11

Sketch :

PALACIO DO GOVERNO TO TIMOR PLAZA


DIMENSION (m) Section
NO STA long wide long wide long wide Area Thick Volume Remarks
(L.m) (L.m) (L.m) (L.m) (L.m) (L.m) (Sq.m) (L.m) (Qu.m)

15 PH 15 3.89 2.58 1.80 2.20 14.00 0.20 2.80

16 PH 16 4.70 0.80 3.76 0.20 0.75

17 PH 17 - 0.20 -

18 PH 18 2.85 1.50 4.28 0.20 0.86

19 PH 19 2.40 6.04 7.70 0.80 20.66 0.20 4.13

20 PH 20 8.10 4.49 0.00 36.33 0.20 7.27

21 PH 21 1.10 0.85 6.48 6.95 45.94 0.20 9.19

SUB TOTAL 24.99


MOVING FROM PAGE -1 22.14
TOTAL 47.13

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 506.1b
ITEM DESCRIPTION : Structural Concrete (17 MPa)
Page 3 of 11

Sketch :

MARCADO LAMA TO CULUHUN


DIMENSION (m) Section
NO STA long wide long wide long wide Area Thick Volume Remarks
(L.m) (L.m) (L.m) (L.m) (L.m) (L.m) (Sq.m) (L.m) (Qu.m)

22 PH 1 4.00 3.60 0.90 2.70 5.20 6.90 53.99 0.20 10.80

23 PH 2 1.55 17.20 26.66 0.20 5.33

24 PH 3 3.55 1.95 0.20 1.65 0.85 1.50 8.52 0.20 1.70

25 PH 4 1.20 1.10 2.30 1.10 0.85 3.10 6.49 0.20 1.30

26 PH 5 1.20 0.60 10.08 3.26 33.56 0.20 6.71

27 PH 6 0.95 1.65 1.57 0.20 0.31

28 PH 7 0.85 1.50 1.28 0.20 0.26

29 PH 8 1.20 1.10 1.32 0.20 0.26

30 PH 9 3.55 1.95 6.92 0.20 1.38

31 PH 10 3.58 5.75 1.95 2.75 25.92 0.20 5.18

32 PH 11 0.85 3.10 0.85 2.20 4.51 0.20 0.90

33 PH 12 0.85 1.10 0.85 0.85 1.66 0.20 0.33

34 PH 13 1.38 16.00 2.20 1.90 1.75 0.90 27.76 0.20 5.55

35 PH 14 2.60 2.30 5.98 0.20 1.20

SUB TOTAL 41.22


MOVING FROM PAGE -2 47.13
TOTAL 88.35

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 506.1b
ITEM DESCRIPTION : Structural Concrete (17 MPa)
Page 4 of 11

Sketch :

MARCADO LAMA TO CULUHUN


DIMENSION (m) Section
NO STA long wide long wide long wide Area Thick Volume Remarks
(L.m) (L.m) (L.m) (L.m) (L.m) (L.m) (Sq.m) (L.m) (Qu.m)

36 PH 15 2.35 0.85 1.10 1.05 3.90 2.48 12.81 0.20 2.56

37 PH 16 0.85 17.50 14.88 0.20 2.98

38 PH 17 1.20 4.05 4.86 0.20 0.97

39 PH 18 1.20 1.20 1.44 0.20 0.29

40 PH 19 1.70 2.60 4.42 0.20 0.88

SUB TOTAL 7.68


MOVING FROM PAGE -3 88.35
TOTAL 96.03

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 506.1b
ITEM DESCRIPTION : Structural Concrete (17 MPa)
Page 5 of 11

Sketch :

SANTACRUZ TO TUGU PRAMUKA


DIMENSION (m) Section
NO STA long wide long wide long wide Area Thick Volume Remarks
(L.m) (L.m) (L.m) (L.m) (L.m) (L.m) (Sq.m) (L.m) (Qu.m)

41 PH 1 1.50 0.85 1.28 0.20 0.26

42 PH 2 1.60 0.90 1.44 0.20 0.29

43 PH 3 3.30 0.90 2.97 0.20 0.59

44 PH 4 1.50 3.30 4.95 0.20 0.99

45 PH 5 12.90 0.90 1.40 1.00 13.01 0.20 2.60

46 PH 6 1.55 3.40 5.30 2.30 17.46 0.20 3.49

47 PH 7 1.70 1.40 2.38 0.20 0.48

48 PH 8 1.65 1.75 2.89 0.20 0.58

49 PH 9 3.80 2.70 10.26 0.20 2.05

50 PH 10 2.50 7.00 17.50 0.20 3.50

51 PH 11 0.90 1.60 1.44 0.20 0.29

52 PH 12 1.65 2.88 1.70 1.25 6.87 0.20 1.37

53 PH 13 1.10 1.85 2.04 0.20 0.41

54 PH 14 1.65 1.30 2.15 0.20 0.43

SUB TOTAL 17.32


MOVING FROM PAGE -4 96.03
TOTAL 113.36

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 506.1b
ITEM DESCRIPTION : Structural Concrete (17 MPa)
Page 6 of 11

Sketch :

SANTACRUZ TO TUGU PRAMUKA


DIMENSION (m) Section
NO STA long wide long wide long wide Area Thick Volume Remarks
(L.m) (L.m) (L.m) (L.m) (L.m) (L.m) (Sq.m) (L.m) (Qu.m)

55 PH 15 2.80 6.00 16.80 0.20 3.36

56 PH 16 2.00 9.00 18.00 0.20 3.60

57 PH 17 4.10 2.50 10.25 0.20 2.05

58 PH 18 6.20 1.80 11.16 0.20 2.23

59 PH 19 5.70 2.40 13.68 0.20 2.74

60 PH 20 3.10 1.20 3.72 0.20 0.74

61 PH 21 16.60 1.56 25.90 0.20 5.18

SUB TOTAL 19.90


MOVING FROM PAGE -5 113.36
TOTAL 133.26

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 506.1b
ITEM DESCRIPTION : Structural Concrete (17 MPa)
Page 7 of 11

Sketch :

COLMERA
DIMENSION (m) Section
NO STA long wide long wide long wide Area Thick Volume Remarks
(L.m) (L.m) (L.m) (L.m) (L.m) (L.m) (Sq.m) (L.m) (Qu.m)

62 PH 1 0.00 0.00 - 0.20 -

63 PH 2 0.00 0.00 - 0.20 -

SUB TOTAL -
MOVING FROM PAGE -6 133.26
TOTAL 133.26

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 506.1b
ITEM DESCRIPTION : Structural Concrete (17 MPa)
Page 8 of 11

Sketch :

HUDILARAN
DIMENSION (m) Section
NO STA long wide long wide long wide Area Thick Volume Remarks
(L.m) (L.m) (L.m) (L.m) (L.m) (L.m) (Sq.m) (L.m) (Qu.m)

64 PH 1 - 0.20 -

65 PH 2 - 0.20 -

66 PH 3 - 0.20 -

67 PH 4 - 0.20 -

68 PH 5 - 0.20 -

69 PH 6 - 0.20 -

70 PH 7 - 0.20 -

SUB TOTAL -
MOVING FROM PAGE -7 133.26
TOTAL 133.26

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 506.1b
ITEM DESCRIPTION : Structural Concrete (17 MPa)
Page 9 of 11

Sketch :

AIMUTIN
DIMENSION (m) Section
NO STA long wide long wide long wide Area Thick Volume Remarks
(L.m) (L.m) (L.m) (L.m) (L.m) (L.m) (Sq.m) (L.m) (Qu.m)

71 PH 1 - 0.20 -

72 PH 2 - 0.20 -

73 PH 3 - 0.20 -

74 PH 4 - 0.20 -

75 PH 5 - 0.20 -

76 PH 6 - 0.20 -

77 PH 7 - 0.20 -

64 PH 8 - 0.20 -

65 PH 9 - 0.20 -

66 PH 10 - 0.20 -

SUB TOTAL -
MOVING FROM PAGE -8 133.26
TOTAL 133.26

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 506.1b
ITEM DESCRIPTION : Structural Concrete (17 MPa)
Page 10 of 11

Sketch :

TASITOLU
DIMENSION (m) Section
NO STA long wide long wide long wide Area Thick Volume Remarks
(L.m) (L.m) (L.m) (L.m) (L.m) (L.m) (Sq.m) (L.m) (Qu.m)

67 PH 1 3.70 1.40 5.18 0.20 1.04

68 PH 2 8.00 1.65 13.20 0.20 2.64

69 PH 3 2.25 1.45 3.26 0.20 0.65

70 PH 4 4.00 1.95 7.80 0.20 1.56

71 PH 5 3.10 3.90 3.60 1.20 16.41 0.20 3.28

72 PH 6 4.60 2.20 10.12 0.20 2.02

73 PH 7 5.60 2.30 12.88 0.20 2.58

SUB TOTAL 13.77


MOVING FROM PAGE -9 133.26
TOTAL 147.03

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 506.1b
ITEM DESCRIPTION : Structural Concrete (17 MPa)
Page 11 of 11

Sketch :

PANTAI KELAPA
DIMENSION (m) Section
NO STA long wide long wide long wide Area Thick Volume Remarks
(L.m) (L.m) (L.m) (L.m) (L.m) (L.m) (Sq.m) (L.m) (Qu.m)

74 PH 1 9.20 4.00 36.80 0.20 7.36

75 PH 2 2.65 5.35 14.18 0.20 2.84

SUB TOTAL 10.20


MOVING FROM PAGE -10 147.03
TOTAL 157.22

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 506.1a
ITEM DESCRIPTION : Structural Concrete (21 MPa)
Page 1 of 3

Sketch :
b

b
.1
2

a
a

b1
1.50
80
0.
6
0.0

b1
50
2

3 00

Sand Pocket Comoro a c


DIMENSION (m) Section
NO STA Height wide Height wide Area Thick Volume Remarks
(L.m) (L.m) (L.m) (L.m) (Sq.m) (L.m) (Qu.m)

1 a 4.00 1.50 1.50 1.20 8.40 0.25 2.10

2 b 4.00 25.80 4.00 25.40 205.00 0.25 51.25

3 c 0.80 1.50 10.00 0.30 3.00

SUB TOTAL 56.35


MOVING FROM PAGE - -
TOTAL 56.35

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 506.5
ITEM DESCRIPTION : Seal Concrete
Page 1 of 1

Sketch :

Thick.
Wide

Wide Thick. Area Distance Volume


NO STA Remarks
(m) (m) (m) (m) (Cu.m)

1 Embassy Aussy 1.50 0.10 0.20 104.00 20.800

SUB TOTAL 20.800


MOVING FROM PAGE - 0.000
TOTAL 20.800

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 601.1
ITEM DESCRIPTION : Steel Grill Cover Opening for Manhole
Page 1 of 1

Sketch :

FOR FENCE

_
_

LINK-1

NO STA UNIT Quantity Remarks


(Each) ( Each)

1 Embassy Aussy 50.00 50.0

0.00
SUB TOTAL 50.000
MOVING FROM PAGE - 0.000
TOTAL 50.000

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 601.2
ITEM DESCRIPTION : Steel Grill Cover Opening for Sand Pocket
Page 1 of 1

Sketch :

4.7

1.50
FOR SAND POCKET

LINK-1

NO STA UNIT Quantity Remarks


(Each) ( Each)

1 COMORO 5.00 5.0

0.00
SUB TOTAL 5.000
MOVING FROM PAGE - 0.000
TOTAL 5.000

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 602.1
ITEM DESCRIPTION : Pipe Culvert, RCPC Ø 500 mm
Page 1 of 1

Sketch :

d = 50 cm

NO STA Distance Quantity Remarks


(m) ( L.m)

1 Embassy Aussy 287.00 287.0

SUB TOTAL 287.000


MOVING FROM PAGE - 0.000
TOTAL 287.000

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 606
ITEM DESCRIPTION : Stone Masonry
Page 1 of 1

Sketch :

DIMENSION (m) Section Average


NO STA a b c d e f g h Area Area Distance Volume Remarks
(Sq.m) (Sq.m) (L.m) (Qu.m)

Sand Pocket Comoro

Left

1 0 + 025 0.30 0.30 0.30 0.09


0.09 25.40 2.29
2 0 + 025 0.30 0.30 0.30 0.09

Right

1 0 + 025 0.30 0.30 0.30 0.09


0.09 25.80 2.32
2 0 + 025 0.30 0.30 0.30 0.09

3 0 + 025 0.30 0.30 0.30 0.09


0.09 3.00 0.27
4 0 + 025 0.30 0.30 0.30 0.09

SUB TOTAL 4.88


MOVING FROM PAGE - -
TOTAL 4.88

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 603
ITEM DESCRIPTION : Inlet Cover
Page 1 of 1

Sketch :

0.35
0. 25

LINK-1

NO STA UNIT Quantity Remarks


(Each) ( Each)

1 Embassy Aussy 50.00 50.0

0.00
SUB TOTAL 50.000
MOVING FROM PAGE - 0.000
TOTAL 50.000

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 701.1
ITEM DESCRIPTION : Concrete Curb
Page 1 of 1

Sketch :
Left

Midle

Rigth

Distance
NO STA Left Midle Rigth Quantity Remarks
(m) (m) (m) (L.m)

1 Embassy Aussy 244.00 244.00

244.00
0.00
244.00

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 701.2
ITEM DESCRIPTION : Concrete Gutter
Page 1 of 1

Sketch :
Left

Midle

Rigth

Distance
NO STA Left Midle Rigth Area Remarks
(m) (m) (m) (L.m)

1 Embassy Aussy 580.00 580.00

580.00
0.00
580.00

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 702
ITEM DESCRIPTION : Paving Block For Sidewalk
Page 1 of 1

Sketch :
Left

Midle

Rigth

NO STA Left Midle Rigth Area Remarks


Long (m) Wide (m) Long (m) Wide (m) Long (m) Wide (m) (Sq.m)

1 Embbasy Aussy 198.22 1.50 297.33

0.00
SUB TOTAL 297.33
MOVING FROM PAGE - 0.00
TOTAL 297.33

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section
BACK UP DATA QUANTITY

PROJECT NAME :
ROAD SECTION :
CONTRACTOR :
SUPERVISION :
LOCATION :
ITEM NO. :
ITEM DESCRIPTION :
Page 1 of 1

Sketch :

a b c Area Distance Volume


NO STA Remarks
(m) (m) (m) (m) (m) (Cu.m)

1 0 + 150 0.70 5.00 1.70 6.00 142.00 852.000

SUB TOTAL 852.000


MOVING FROM PAGE - 0.000
TOTAL 852.000

Submitted by:

Ronel Weo, ST
(Site Engineer)
BACK UP DATA QUANTITY

PROJECT NAME : NEW LINE DRAIN AND SAND POCKET CONSTRUCTION ROAD MAINTANANCE SECTION URBAN ROADS
ROAD SECTION : DILI LARAN
CONTRACTOR : METEOR UNIPESSOAL LDA
SUPERVISION : MINISTRY OF PUBLIC WORKS, TRANSPORTATION AND TELECOMMUNICATION
LOCATION : MUNICIPIO DE DILI
ITEM NO. : 601.11
ITEM DESCRIPTION : RCPC 600mm diameter
Page 1 of 1

Sketch :

d = 60 cm

NO STA Distance Quantity Remarks


(m) ( L.m)

1 Link-2, Left 14.00 14.0

2 Link-2, Right 12.00 12.0

3 Link-3, Left 90.00 90.0

4 Link-3, Right 80.00 80.0

0.00
SUB TOTAL 196.000
MOVING FROM PAGE - 0.000
TOTAL 196.000

Submitted by: Checked by : Verified by :

Ronel Weo, ST Eng. Simâo Laranjinha Eng. Rogerio Freitas


(Site Engineer) Technic DNEPCC Technic Support Section