Company Name

Document No:
Repi Soap and Detergent PLC
Document Title
Revision No: 001
Issue Date: June 24, 2020
Project Change Request Form Revision Date: June 24, 2020

Project Name Saponification Change Number 01

GM/Technical director /Plant operation


Requested By Date of Request 24-Jun-20
director
Presented To Steering Committee

Change Name Alemgena Saponification project Flexy Bag

Description of Change: originally it was planned to use flxy bag or plastic drum to provide to melting pit.

Reason for Change: to Reduce double handling and to reduce leakage and wastage, and most of all increase efficiency

•Increase efficiency
•Reduce Double Handling
Effect on Deliverables (including a •Reduce Wastage of oil
list of any affected deliverables):

Effect on Schedule (including


Estimated Completion Date for this this is not effect project schedule
change):

Effect on Project Cost: there is additional cost for construction of Storage tanker

Item Description Time(Days) Cost in ETB


Increase Reduction Increase Reduction

Construction of Storage tanker ü ü

eliminating flexy bag ü ü

Effect of NOT Approving this


N/A
Change:

Reason for Rejection


(If applicable):
Approval Remark

Mufid Sabir

Approved Signature: Date:

Rejected

Jemal Yassin

Approved Signature: Date:

Rejected

Abdissa Lemma

Approved Signature: Date:

Rejected

Betelehem Hailu

Approved Signature: Date:

Rejected

Mihretu Begashaw
Approved Signature: Date:

Rejected

Berihun Demissie

Approved Signature: Date:

Rejected