DETAILED DESIGN DRAWING

(GREENFIELD)

SITE ID: PH1000113


SITE CODE:
SITE NAME:
LON(E): 124.62460
LAT(N): 8.46492
TOWER TYPE: 3GT-36-280C-2NPT (290KPH/C)

700M&2.1G-3Sectors
TABLE OF CONTENTS
NO. DRAWING NO. DESCRIPTION
CONSTRUCTION SAFETY REQUIREMENTS
BILL OF QUANTITY
ARCHITECTURAL
1 AR-01 SITE INFORMATION
2 AR-02 PERSPECTIVE VIEW/ SITE LAYOUT/ ANTENNA VIEW
3 AR-03 SITE DEVELOPMENT PLAN/ ELEVATION VIEW
4 AR-04 ELEVATION VIEW
5 AR-05 EQUIPMENT LAYOUT
STRUCTURAL
1 ST-01 FENCE ELEVATIONS
2 ST-02 FENCE FOUNDATION DETAILS
3 ST-03 METAL GATE DETAILS
4 ST-04 RAMP DETAILS
5 ST-05 POWER SERVICE ENTRANCE POST DETAILS
6 ST-06 MCB/MTS LAYOUT
7 ST-07 TEST PIT DETAILS (OPTION 1)
8 ST-08 TEST PIT DETAILS (OPTION 2)
9 ST-09 ACPDB DETAILS
10 ST-10 HANDHOLE DETAILS
11 ST-11 HANDHOLE LAYOUT PLAN
12 ST-12 EQUIPMENT PAD DETAILS (2 CABINETS+1RESERVE)
13 ST-13 SURGE PROTECTOR DEVICE LOCATION
14 ST-14 3GT-36-280C-2NPT (290KPH/C) TOWER LINE DIAGRAM
15 ST-15 3GT-36-280C-2NPT (290KPH/C) TOWER FOUNDATION SPECIFICATION
16 ST-16 3GT-36-280C-2NPT (290KPH/C) FOUNDATION DETAILS (WITH WATER)
ELECTRICAL
1 EL-01 EQUIPMENT LAYOUT IN CABINET
2 EL-02 EQUIPMENT CONNECTION DIAGRAM
3 EL-03 EQUIPMENT CONNECTION DIAGRAM
4 EL-04 SINGLE LINE DIAGRAM
5 EL-05 EARTHING & LIGHTNING LAYOUT (OPTION 1)
6 EL-06 EARTHING & LIGHTNING LAYOUT (OPTION 2)
7 EL-07 GROUNDING RISER DIAGRAM
CONSTRUCTION SAFETY REQUIREMENTS

1.The constructors shall follow the safety regulations and the mandatory provisions 15.It is strictly forbidden to cut off the power of a running equipment without
while constructing telecommunication project. authorization.
2.While constructing in special areas such as highways, railways, bridges, navigational 16. No connector is allowed in the middle of a power cord.
channels, and in urban areas with crowded traffic, it is necessary to set warning signs, 17.It is forbidden to install switches or fuses in the ground lead or AC neutral wire.
or send special guards if needed. 18. It is strictly forbidden to hang signal lines and power lines on the lightning
3. In high-altitude operations, constructors should ware safety belts, helmets, and soft receptor, down conductor and its support.
rubber insulated shoes. 19. It is strictly forbidden to hang the AC power cord on the communication device.
4. Temporary facilities such as living place, offices must be safe, secure, and 20. Verify the power supply capacity when using the original power outlet.
comply with fire safety regulations. Combustible material is strictly forbidden in building 21. Electric operations should use well-insulated tools and be operated by qualified
temporary facilities. Temporary facilities should be far away from electrical facilities operator. When operating in running equipment, head cabinets, and branch
and high-voltage electric wires. cabinets, do not wear metal ornaments and take effective measures to prevent
5.Living room should be built in places far away from landslides, floods and metal materials such as screws, gaskets, and metal chips from falling.
mudslides. 22. No tools or equipment shall be placed on iron frames, channels, racks, ladders.
6. When working on rivers, lakes and reservoirs, it's necessary to wear life vest and 23. When working in machine room with running equipment, the working area shall
listen to the unified command. be demarcated. The operator shall not touch the running equipment, or the fire
7. Fire and smoking are strictly prohibited while operating in optical (electric) cable protection facilities, unless it is necessary.
entry rooms, waterline houses, machine rooms, unattended stations, woodworking 24. Non-construction personnel are strictly prohibited from entering the construction
sites, warehouses, forest areas, grasslands, etc. Fire protection device for exhaust area without the consent of the on-site commander. When lifting and working on the
pipe must be installed in vehicles before entering the fire ban area. tower, it is prohibited work or stand under the tower.
8.When the cables and other materials passing through the walls or floors, the holes 25. It is strictly forbidden to operate on the tower if sick or drunk.
must be sealed with fireproof materials. 26. When working on the tower, the safety belt of the operator must be fixed to the
9. When the electrical equipment is on fire, the power must be cut off first. main structure of the tower.
10. Safety belts must comply with the national standards. It is strictly forbidden to 27. When installing the antenna feeder at high altitude, the constructor should pay
replace the seat belt with ordinary ropes, wires, etc. attention to the safety and prevent the damage of the falling objects to the people on
11.When working near power supply line, constructors must wear safety helmets, the ground.
insulated gloves, insulated shoes and use insulated tools. 28. When laying cables, do not pull hard. Do not stand on the windowsill when
12.When working near high-voltage line, the minimum distance from the laying cables on the roof. Use safety belts when you must stand on the windowsill.
high-voltage line to constructors must be guaranteed: 2.5m while the line voltage is 29. Set obvious safety warning signs at the entrance of the construction site, cranes,
below 35kV, and 4m while the line voltage is above 35kV. temporary power facilities, access passages, holes, manholes, tower bottoms,
13.When working in flammable and explosive places, explosion-proof tools must be hazardous gas and liquid storage. Safety warning signs must comply with national
used. regulations.
16.It is strictly forbidden to store flammable, explosive and other dangerous
materials in the machine room.
BILL OF QUANTITY
Equipment Service
Contents Description Model Quantity Unit Remark Contents Description Model Quantity Unit Remark
Wireless Master Device 700M-3Sectors-3RRH Site Wireless Wireless Installation-Macrosite-LTE Single band-3 Sectors-3 Antenna Site
Wireless Master Device 2.1G-3Sectors-2RRU Site Wireless Wireless Installation-Macrosite-LTE Dual-band-3 Sectors-3 Antenna 1 Site
Wireless Master Device 2.1G-3sectors-3RRU Site
Wireless Wireless Installation-Macrosite-LTE Dual-band-3 Sectors-6 Antenna Site
Wireless Master Device 700M&2.1G-3Sectors-2RRU 1 Site
Wireless Master Device 700M&2.1G-3Sectors-3RRU Site Wireless Wireless Installation-Macrosite-LTE Tri-band-3 Sectors-3 Antenna Site
Wireless Master Device 2.1G&2.6G-3Sectors-2RRU Site Wireless Wireless Installation-Macrosite-LTE Tri-band-3 Sectors-6 Antenna Site
Wireless Master Device 2.1G&2.6G-3Sectors-3RRU Site Wireless Wireless Installation-Macrosite-LTE Tri-band-3 Sectors-9 Antenna Site
Wireless Master Device 700M&2.1G&2.6G-3sectors-2RRU Site Installation-Macrosite-NR Synchronization construction-3 Sectors-3 Antenna
Wireless Wireless Site
Wireless Master Device 700M&2.1G&2.6G-3sectors-3RRU Site
Wireless Master Device NR-3Sectors Site Wireless Wireless Installation-Macrosite-NR Asynchronous construction-3 Sectors-3 Antenna Site
Wireless Antenna L700 4ports 13.8dBi Pcs Auxiliary Power Device Installation for outdoor cabinet 2 Cabinet
Wireless Antenna L700 4ports 15.3dBi Pcs Auxiliary Civil work Equipment pad details on ground 2.016 m3
Wireless Antenna L2.1 4ports 17dBI Pcs Auxiliary Civil work Tower Foundation Concrete Volume 57.0 m3
Wireless Antenna L700&L2.1 8ports 13.5dBI Pcs Auxiliary Civil work Grounding cable length of grounding system (Option 1: Flat Bar + Angle Bar) 140 Meter
Wireless Antenna L700&L2.1 8ports 15dBI 3 Pcs
Wireless Antenna L2.1&L2.6 12ports Pcs Grounding cable length of grounding system (Option 2: Bare Copper Wire +
Auxiliary Civil work 43 Meter
Wireless Antenna L700&L2.1&L2.6 16ports 13.2dBI Pcs Copper-clad Steel )
Auxiliary Power 2.2m Power Cabinet_LiFeO4 1 Cabinet Auxiliary Civil work Grounding Busbar (24 holes) 1 Pc
Auxiliary Power 2.2m Equipment Cabinet_LiFeO4 1 Cabinet Auxiliary Civil work Grounding Busbar (10 holes) 1 Pc
Auxiliary Power 2.2m Battery Cabinet_LiFeO4 Cabinet Auxiliary Civil work Equipment room-outdoor cable tray 1 Meter
Auxiliary Power 2.2m Eltek 2Bay Rectifier Cabinet Cabinet Auxiliary Civil work Soil test 1 Site
Auxiliary Power Rectifier Module(50A) 5 Pcs Auxiliary Civil work Site layout and clean 1 Site
Auxiliary Power 150Ah Lithium Iron Battery 4 Pcs Auxiliary Civil work Door/Gate details 1 Site
Auxiliary Power 100Ah Lithium Iron Battery Banks Auxiliary Civil work Power supply (service entrance) 1 Site
Auxiliary Monitoring Monitoring in cabinet 1 Site Auxiliary Civil work Perimeter Light 4 Pcs
Tower Monopole DGT(C)-30-340C-2NPT Site Auxiliary Civil work Fence 1 Site
Tower 3-Leg Tublar Tower 3GT-36-280C-2NPT (290KPH/C) 1 Site Auxiliary Power supply Power supply layouting-5KW Site Refer to Note 1.

Tower 4-Leg Angle Tower JGT-30-340C-2NPT Site Auxiliary Power supply Power supply layouting-20KW Site Refer to Note 1.

Tower 4-Leg Angle Tower JGT-36-280C-2NPT Site Auxiliary Power supply Power supply layouting-25KW Site Refer to Note 1.

Tower 4-Leg Angle Tower JGT-42-340C-2NPT Site Auxiliary Power supply Power supply layouting-35KW+ 1 Site Refer to Note 1.

Tower 4-Leg Tublar Tower 4GT-42-340C-2NPT Site Auxiliary Power supply Transformer-25KVA Site Refer to Note 1.

Auxiliary Power supply Transformer-37.5KVA Site Refer to Note 1.

Auxiliary Power supply Transformer-50KVA Site Refer to Note 1.

Auxiliary Power supply Temporary power for the site installation 1 Site
Note 1: It will be adjusted based on the actual AC commercial power capacity application in the future.
Note 2. Either one of the two grounding methods can be used.
AC N
MASTCESS RO
ERSO AD
10
°4 N AV
E. SITE
SITE ID (PH1000113)
Dagong Upper, Brgy. Carmen, City of
Cagayan De Oro, Misamis Oriental
N
EXISTING ELECTRICAL POLE 25KVA
(TAPPING POINT 75M AWAY FROM THE SITE)

4m RIGHT OF WAY
SKY
GARAGE

2m
LEASED AREA 12M X 12M
10000
LEASED AREA 12M X 12M

VICINITY MAP
10000

B
SCALE NTS

1m Site Information
Site
3m ROW Site ID PH1000113
Site Code
Site Name
Area Type Suburban
Location Detail
Longtitude(E): 124.62460
Latitude(N): 8.46492
Altitude(m): 93
Region Northern Mindanao (Region X)
Province MISAMIS ORIENTAL
Site Address Dagong Upper, Brgy. Carmen, City of Cagayan De Oro, Misamis Oriental

Site Detail
Site Type MacroSite
Civil Work Input:
Frequency band 700M&2.1G
Exposure category: C D ; A SITE DEVELOPMENT PLAN
SCALE NTS Quantity of sectors 3
Soil Bearing Capacity: 110 kpa; Site Sub-type Greenfield
Site category New
Under Ground Water Level: -1.45 m;
Type of property Private Land
Soft Subsoil: Yes (SOFT TO STIFF) No .
LIGHTNING
ARRESTER


10
OB LIGHT

PROPOSED
N
L700&L2100 ANTENNA
(RRU AT THE BACK OF
ANTENNA) PROPOSED
TEST PIT FOR
GROUNDING OPTION 1

PROPOSED
TEST PIT FOR
PROPOSED
GROUNDING OPTION 2
BUSBAR 24 HOLES

FOUNDATION LINE

PROPOSED
CLIMBING AND CABLE LADDER

PROPOSED
3GT-36-280C-2NPT (290KPH/C)
TOWER

PROPOSED MTS

PROPOSED MCB

PROPOSED PULL BOX

PROPOSED
50mmØ IMC CEF ROUTE PROPOSED
3GT-36-280C-2NPT (290KPH/C)
PROPOSED TOWER
50mmØ FLEXIBLE
METAL/PVC CONDUIT PROPOSED
5 m 1*Ø110 PVC PIPE
5 m FOC
4 - Ø26/32mm HDPE PIPE

DISTANCE SHALL NOT


LESS THAN 700mm

PROPOSED HANDHOLE
600*600*850
PROPOSED EQUIPMENT CABINET
RESERVED 3 Ø110 STEEL
PROPOSED POWER CABINET PIPE, w/ 3mm THICKNESS

PROPOSED ACPDB LOCATION & PROPOSED BUSBAR 10 HOLES


SURGE PROTECTOR DEVICE
AT THE BACK PROPOSED TESTPIT FOR
THE LENGTH OF THE MATERIAL CAN BE ADJUSTED GROUNDING OPTION 1
PROPOSED 5 m 1*Ø110 PVC PIPE 5 m FOC ACCORDING TO THE ACTUAL SCENE PROPOSED PVC PIPE
THE LENGTH OF THE MATERIAL CAN BE ADJUSTED
ACCORDING TO THE ACTUAL SCENE
PROPOSED SERVICE ENTRANCE
PROPOSED 5 m 1*Ø110 PVC PIPE 5 m FOC
THE LENGTH OF THE MATERIAL CAN BE ADJUSTED PROPOSED CHB FENCE
ACCORDING TO THE ACTUAL SCENE
PROPOSED 5 m 4*Ø26 / 32 HDPE PIPE 5 m FOC
THE LENGTH OF THE MATERIAL CAN BE ADJUSTED
PROPOSED HANDHOLE 600*600*850 ACCORDING TO THE ACTUAL SCENE PROPOSED KWHR METER

PROPOSED GATE WAY A SITE LAYOUT


SCALE NTS
R
AM
P

A PERSPECTIVE VIEW
SCALE NTS

10

CLIMBING AND CABLE LADDER

2*3.5mm²AC cable(BLACK/RED) with 20mm Ø PVC

PERIMETER LIGHT

PROPOSED
TEST PIT FOR
GROUNDING
AVIATION LIGHT OPTION 1
WITH PHOTOCELL

EQUIPMENT PAD
COMMERCIAL POWER
PROPOSED
EQUIPMENT CABINET TEST PIT FOR
PERIMETER LIGHT GROUNDING
OPTION 2
POWER SUPPLY CABINET
PERIMETER LIGHT
5.0 m
PROPOSED ACPDB PROPOSED GPS PROPOSED GPS POLE,
LOCATION & SURGE LOCATION ON SOUTH TOWER LEG
PROTECTOR DEVICE THE GPS POLE @5.0m
AT THE BACK ON SOUTH TOWER
LEG
2-38mm² THW (Black/Red)
IP66 20Amp WATERPROOF PROPOSED POWER
1-GANG SWITH FOR CABINET & EQUIPMENT
4-PERIMETER LIGHTS CABINET
FOUNDATION LINE MTS

@1.5m HIGH from FGL PROPOSED ACPDB MCB

LOCATION SURGE
PERIMETER LIGHT PROTECTOR DEVICE
AT THE BACK
REFER TO 0m
SINGLE LINE DIAGRAM M

COMMERCIAL POWER

2 SECTION "Y"
1 ELECTRICAL LAYOUT SCALE: NTS
SCALE: NTS
Proposed Equipment list
NO. Item Dimension(mm)(W*D*H) QTY Comments NOTES :
1. ALL EMBEDDED PIPES @450mm DEPTH.
1 Self Supporting Tower 36000(H) 1 2. FOR WIRING & CONDUIT DETAILS REFER TO "SINGLE LINE DIAGRAM"
LEGEND: 2 PERIMETER LIGHT 4
3 MCB 1
DC CABLE 4 MTS 1
5 ACPDB 1
AC CABLE
6 Power Supply Cabinet 900*900*2285 1
7 Equipment Cabinet 900*900*2285 1
LIGHTNING
ARRESTER
A01
OB LIGHT

S01:80°
35.1m
PROPOSED
L700&L2100 ANTENNA
(RRU AT THE BACK OF
ANTENNA)


PROPOSED

10
L700&L2100 RRU

PROPOSED
L700 RRH
PROPOSED N
L700&L2100 RRU
PROPOSED
24 HOLES BUSBAR
S03:350°

A03 S02:250°

A02

Platform 1 Layout
AHPC:
2*6mm² RRU DC POWER CABLE(BLUE/BLACK)
OB LIGHT POWER SUPPLY CABLE ARGA:
ZRVV22 3X1.5mm2 (BLUE/BLACK/YELLOW/GREEN) 2*10mm² RRU DC POWER CABLE(BLUE/BLACK)

FIBER CABLE, CABLE TIE OR CLAMP, 0.8M/PCS


Note:
The metal outer sheath of the cable installed horizontally should be connected
to the lightning protection flat bar or the ground wire every 5m ~ 10m; Proposed Antenna Information
The metal outer sheath of the cable (vertical) running up and down
should be grounded at least once near both the upper and lower ends.
Sector ID NO. Antenna Group Azimuth(°) ANT Height(m) Dimension(H*W*D) M-tilt(°) E-tilt(°) Ant mounted on Type
L700&L2.1 8ports
S01 A01 20 35.1 2680×469×198 2.0 3.0 Platform 1 T2020L6R012
15dBi
L700&L2.1 8ports
S02 A02 180 35.1 2680×469×198 2.0 3.0 Platform 1 T2020L6R012
15dBi
L700&L2.1 8ports
S03 A03 280 35.1 2680×469×198 2.0 3.0 Platform 1 T2020L6R012
15dBi
A04 GPS ANT 5

Proposed RRU Information


NO. RRU Dimension(H*W*D) QTY Type
1 700M RRH 336.5x295x125 3 AHPC
2 2100M RRU 115x420x400 2 ARGA

Proposed Cable Information


PROPOSED GPS POLE, SOUTH 5.0 m NO. Cable Type Length (m) Quantity
TOWER LEG @5.0m
1 CPRI 50 5
GPS FEEDER (12M)

2 Jumper 3 / 10 16 / 8
PROPOSED POWER CABINET &
EQUIPMENT CABINET
PROPOSED ACPDB LOCATION
3 Power (+) 50 5
SURGE PROTECTOR DEVICE
0m
AT THE BACK 4 Power (-) 50 5
PROPOSED TEST PIT FOR
GROUNDING OPTION 2 5 Grounding (RRU) 12 5
PROPOSED TEST PIT FOR
GROUNDING OPTION 1
6 AISG 3 3

A PERSPECTIVE VIEW
SCALE NTS
PROPOSED
POWER SUPPLY CABINET

°4
10
PROPOSED
EQUIPMENT CABINET N

PROPOSED ACPDB LOCATION


1600
& SURGE PROTECTOR DEVICE 350 900 350
AT THE BACK

1140
PROPOSED
EQUIPMENT PAD
PROPOSED
GROUNDING
BUSBAR
10 HOLES

3000
900
PROPOSED

3600
CABLE
TRAY

100
900
SURGE
PROTECTOR

560

460
DEVICE

420

A PERSPECTIVE
SCALE NTS

B TOP VIEW
SCALE NTS
10000
NOTES :
2200 2200 2175 3425 1. PROVIDE DRAIN HOLES ON THE FRAMES.
325
2. TOP OF PIPES COVERED WITH STEEL PLATE.

3. CHB / MASONRY :

FOR NON-LOAD BEARING TYPE CONCRETE BLOCK, A MINIMUM


NOTE: COMPRESSIVE STRENGTH OF 2.41MPA (350psi) SHALL BE DEVELOPED.

VARIES AS PER POWER PROVIDER


ALL PERIMETER
LIGHTS SHOULD
4. WALL REINFORCEMENTS SHALL BE AS FOLLOWS:
BE ON TOP OF
750

1.8m from FGL.


WALL THICKNESS VERT. REINFORCEMENT HOR. REINFORCEMENT

(150 mm) 6 IN. 10mmØ @ 400mm 10mmØ @ 600mm

5. REINFORCING BARS: DIA.≥16,fy=414MPa


DIA.≤12,fy=275MPa
2000

6. ALL CELLS CONTAINING REINFORCING BARS OR INSERTS SHALL


BE SOLIDLY FILLED WITH CONCRETE.

7.ALL DIMENSIONS ARE MILIMETERS AND LEVES IN METERS UNLESS


OTHERWISE NOTED.

FGL +0.30 FGL +0.30 8.THE STRENGTH GRADE OF THE WALL CHB BLOCK MASONRY
300

MORTAR IS NOT LESS THAN 7.5Mpa.


NGL ±0.00 NGL ±0.00
550

1800
825 650 1500 650 1475 650 600 450 3200

1 FRONT FENCE ELEVATION


- SCALE : 1:20M

10000

2500 2500 2500 2500

NOTE:
ALL PERIMETER
LIGHTS SHOULD
BE ON TOP OF
750

1.8m from FGL.


2000

FGL +0.30
300

NGL ±0.00
550

2 TYPICAL ELEVATION
- SCALE : 1:20M

925 750 1725 750 1700 750 1725 750 925


WELDED BARBED WIRE WELDED BARBED WIRE
(SEE NOTE #2) STAY 5-Ø10 ROUND BAR STAY 5-Ø10 ROUND BAR
(SEE NOTE #2)

Ø50 SCH. 40 G.I. PIPE Ø50 SCH. 40 G.I. PIPE 500

94

94
BARBED WIRE HOLDER BARBED WIRE HOLDER PROPOSED COLUMN
75 350 75

142

142
142

142
31 31
10 10

75
750
26

26
750

100
142

142
30

30
100 88 142

100 88 142
30

30

200

350

500
25 THK CEMENT MORTAR
COPING 12mmØ BARS
200

200
100 BOTHWAYS

100

200
2000

WELDED 8-Ø10x40mm WELDED 8-Ø10x40mm

OUTSIDE

75
INSIDE
LONG REBAR LONG REBAR
100 100 75 75

DIA. 25MM GRAVEL SURFACE 200 200 100


LAYOUT 100MM THK.
3 6" CHB WALL

5 CORNER POST FOOTING DETAIL


SCALE NTS
FGL +0.300 (MIN.)
COMPACTIONNESS NOT LESS
100

4-12mmØ WITH 10mmØ LATERAL


THAN 93% TIES @ 200mm O.C.
CHB
300
200

NGL ±0.000
2 BARBED WIRE HOLDER +0.300 10mmØ HORIZONTAL
SCALE NTS
BARS@ 600mm O.C.
CONTINUOUS WALL
300

FOOTING
38mmØ PVC 10mmØ VERTICAL
12mmØ BARS WEEP HOLES BARS @ 400mm O.C.
550

BOTHWAYS SCREE (50mm>DIAMETER > 38mm)


250

50mm THK.
LEAN CONCRETE
12mmØ 150mm THK CHB WITH
TIE BARS @ 200 O.C. MORTAR (150mm CHB)
50 500 50 -0.150
50

3-12mmØ CONT.
BARS

150
FENCE POST DETAIL

75
1 -0.300
SCALE NTS

500
75 250 75
75 350 75
400
PROPOSED COLUMN
200
CONTINUOUS WALL FOOTING DETAIL
75

50 100 50 5

100
4-12mmØ WITH 10mmØ LATERAL SCALE NTS
TIES @ 200mm O.C.
50

200
100
200

350

500
BILL OF MATERIAL(GRAVEL )
50

12mmØ BARS
BOTHWAYS

3 COLUMN SECTION A NOTES :

200
SCALE NTS
1. PROVIDE DRAIN HOLES ON THE FRAMES.
75

2. TOP OF PIPE POST COVERED WITH STEEL PLATE.


3.CONCRETE STRENCGTH:CLASS "A",21MPa(3000psi) @28 DAYS;
LEAN CONCRETE STRENGTH: 7MPa;

4 FENCE POST FOOTING DETAIL REINFORCING BARS: DIA.≥16 ,fy=414MPa


DIA.≤12 ,fy=275MPa
SCALE NTS
4. CONCRETE PROTECTION REINFORCED AS PER NSCP, CHAPTER 4, 407.8
412
3000

20
31 83 70 197 63
25 1465 1465 25

10 25 25 25
80

30 26
93
142

30

R20
142

40
750

40
900

142
142

109

205
ELEV. +2.300
88

250
250
R60

60

96
5 6
--

15
15
--
975

700
2700

63 20

412

83 70 197 63
800

4
2 --
975

3 --
--

400
300

FGL +0.300
2 BARREL BOLT DETAIL 25 25 25

-- SCALE: 1:10 197 215


50

35

1 METAL GATE DETAILS 12


-- SCALE: 1:30
10 15

0
R1
70
10

10 15

10
15
12.5
25

15

40
35

25

60

35
6

25

70
25

12.6
7 DETAIL B

10
-- SCALE: 1:5
12.5 22.5 10 10
25

35 40
20

5 GATE STOPPER DETAIL 6 DETAIL A


-- SCALE: 1:5 -- SCALE: 1:5

7
252

252

--
135

135
160

160
75

75
175

175
50

50

FGL ±0.30
50

50

150
45
HINGE DETAIL
25
4
3 FOOT BOLT DETAIL 100
25
-- SCALE: 1:5
-- SCALE: 1:10
300
15
00
00
30

4 RAMP DETAILS
SCALE 1:50

BILL OF MATERIAL(RAMP )

NOTES :
1.CONCRETE STRENCGTH:CLASS "A",21MPa(3000psi) @28 DAYS.
REINFORCING BARS: DIA.≥16,fy=414MPa
DIA.≤12,fy=275MPa
2.THE CONCRETE RAMP IS LAID ON THE COMPACTED SOIL WHICH
MUST BE NO LESS THAN 93% OF MAX DENSITY.
20mmØ TIMBLE EYEBOLT
MESSENGER WIRE TO
300 ELECTRICAL POLE

SPOOL INSULATOR
(IF REQUIRED PROVIDE 10mmØ BARS

400
DRIP LOOP) 6-16mmØ BARS WITH 450

650
10mmØ TIES @ 150mm O.C.
100 100 100 100

B SERVICE ENTRANCE CAP


450
50 350 50

100
10mmØ BARS(SEE
SECTION 'B' DETAIL)

50

100
300
VARIES (AS PER POWER PROVIDER REQUIREMENT)

50mmØ IMC FOR UTILITY


METERING (EXPOSED)

100
300
200
MALLEABLE CLAMP
1.0m SPACING

50
A CONDULET WITH 4 SECTION 'B'
REMOVABLE COVER SCALE NTS

3 COLUMN PEDESTAL DETAIL


4550

SCALE NTS

KWHR METER
WITH CAGE & PADLOCK

1200
75 1050 75 450

450 CONDULET WITH


1300

REMOVABLE COVER

75

100
FGL +0.300 (MIN.)

300
NGL ±0.000

300
IMC CONDUIT
1200
1050

COMPACTED SOIL, COMPACTED SOIL,


COMPACTIONNESS NOT LESS THAN 93% COMPACTIONNESS NOT LESS THAN 93%
1800

GROUNDING CONNECTION 50mmØ BUSHING


BETWEEN MCB & KHW LOCKNUT
6-16mmØ BARS METER ENCLOSURE
800 300 100 BOTHWAYS 50mmØ IMC
6-16mmØ BARS TOP & BOTTOM CONDUIT
BOTHWAYS
300

75

50mm THK. 5 SECTION 'A'


50

LEAN CONCRETE SCALE NTS


50 1200 50

2 PEDESTAL FOOTING DETAIL


SCALE NTS

1 ELEVATION NOTES :

SCALE NTS
1.CONCRETE STRENCGTH:CLASS "A",21MPa(3000psi) @28 DAYS.
LEAN CONCRETE STRENGTH: 7MPa;
REINFORCING BARS: DIA.≥16 ,fy=414MPa
DIA.≤12 ,fy=275MPa
684
894

10mmØ BARS RING

50mmØ HDPE

A
ONE CLAMP PER METER

HEIGHT FROM EQIUPMENT PLATFORM TO FGL.


CABLE LADDER

200 200

MTS

MTS
CONDULET WITH MCB
REMOVABLE COVER

IMC CLAMP

50mmØ FLEXIBLE 1200 CLAMP 50mmØ IMC


METAL/PVC CONDUIT +0.600
IMC CLAMP
IMC
COUPLING
50mmØ IMC
FGL +0.300

300
FGL +0.300
450

110 110

110mmØ PVC
TO EQIUPMENT PLATFORM

50mmØ HDPE 50mmØ PVC


50mmØ PVC&
50mmØ HDPE

50mmØ PVC LONG SWEEP


ELBOW & 50mmØ HDPE

1 ELEVATION 2 SECTION 'A'


SCALE : NTS NTS
SCALE :
SEE HANDLE
DETAIL
500

50 50 300 50 50 2-12mmØ HOLE


EARTHUING PIT COVER WELD-ON
CHECKERED PLATE HINGE
500mm x 500mm x 10mm THK

50 50
SEE HINGES
50mmØ PVC DETAIL 50 L 50mm x 6mm THK
PIPE SLEEVE

10
300

500
4-10mmØ NUTS 10mmØ DOWEL
50mm² BCC WITH WASHERS

50 50
10mmØ HANDLE
500mm x 200mm x 6mm THK
FLAT BAR (STOPPER PLATE)

1 TEST PIT / PULL-BOX COVER PLAN 100


SCALE 1:8M

5 HINGE DETAIL
3 TEST PIT / PULL-BOX COVER DETAIL SCALE NTS

SCALE NTS

10mmØ HANDLE CONSTRUCTION JOINT WITH


16mm BITUMINOUS 10mmØ HANDLE
EARTHING PIT COVER CONCRETE FILLER EARTHING PIT COVER
CHECKERED PLATE
CHECKERED PLATE
100
500mm x 500mm x 10mm THK 75mm THK CONCRETE SLAB 500mm x 500mm x 10mm THK
100mm THK. CHB BROOM FINISHED 10mmØ THK. CHB

100
100

10mmØ ROUND BAR WITH


NUTS (GALVANIZED)

800
800

50mmØ PVC
50mm x 200mm x 6mm THK

950
950

PIPE SLEEVE

800
800

FLAT BAR (STOPPER PLATE)

10 50
CONCRETE CASING PVC
FB 40x4 END-BELL

150

200
2 - 22mm² THHN
50

50
+ 1 - 8.0mm² THW

COMPACTED COMPACTED
GRAVEL BEDDING GRAVEL BEDDING
4 HANDLE DETAIL
SCALE NTS

350 350

2 SECTION "A" 4 PULL-BOX DETAIL


SCALE 1:8M 1:8M
SCALE
SEE HANDLE
DETAIL
500

50 50 300 50 50 2-12mmØ HOLE


EARTHUING PIT COVER WELD-ON
CHECKERED PLATE HINGE
500mm x 500mm x 10mm THK

50 50
SEE HINGES
50mmØ PVC DETAIL 50 L 50mm x 6mm THK
PIPE SLEEVE

10
300
500
4-10mmØ NUTS 10mmØ DOWEL
38mm² BCW WITH WASHERS

50 50
10mmØ HANDLE
500mm x 200mm x 6mm THK
FLAT BAR (STOPPER PLATE)

1 TEST PIT / PULL-BOX COVER PLAN 1:8M


100
SCALE

5 HINGE DETAIL
3 TEST PIT / PULL-BOX COVER DETAIL NTS
SCALE NTS

SCALE

10mmØ HANDLE CONSTRUCTION JOINT WITH


16mm BITUMINOUS 10mmØ HANDLE
EARTHING PIT COVER CONCRETE FILLER EARTHING PIT COVER
CHECKERED PLATE
CHECKERED PLATE
500mm x 500mm x 10mm THK 75mm THK CONCRETE SLAB 500mm x 500mm x 10mm THK
100
100mm THK. CHB BROOM FINISHED 10mmØ THK. CHB

100
100

10mmØ ROUND BAR WITH


NUTS (GALVANIZED)

800
800

50mmØ PVC
50mm x 200mm x 6mm THK

950
950

PIPE SLEEVE

800
800

FLAT BAR (STOPPER PLATE)


CONCRETE CASING PVC

10 50
38mm² BCW END-BELL

150

200
50

50
38mm² BCW

COMPACTED COMPACTED
GRAVEL BEDDING GRAVEL BEDDING HANDLE DETAIL
SCALE NTS
5
8"Ø x 3m GROUNDING ROD
350 350

2 SECTION "A" 1:8M


4 PULL-BOX DETAIL
SCALE SCALE 1:8M
460
400 460
30 200 200 30

L60x60x6
4

420
400

420
400

350
3

1 ACPDB FRAMING LAYOUT


SCALE 1:20M

2 ANCHOR BOLT LAYOUT


SCALE 1:20M

400
340
24

24
L60x60x6
150
86

86
1000

1000
780

700

780
1500

1500

L60x60x6

L60x60x6
650
610

610
500

500

TOP OF EQUIPMENT PAD


120

120

4 FRONT VIEW
SCALE 1:20M

3 SIDE VIEW
SCALE 1:20M
500
Ø10mm TIES
310
SPACED AT 250mm O.C
Ø10mm TIES
SPACED AT 250mm O.C
500

4 - Ø10mm TIES 4 - Ø10mm TIES


TEMPERATURE BARS TEMPERATURE BARS

1 SECTION 1 1 SECTION 2
SCALE: NTS:
SCALE: NTS:

PROPOSED
POWER SUPPLY CABINET
PROPOSED
EQUIPMENT CABINET

PROPOSED
APCDB

NOTE: PROPOSED
500 CABLE LADDER

150
PROPOSED BUSBAR

300
CONCRETE COVERING THE PVC PIPE NEEDS TO BE ENCAPSULATED WITH
ALL AROUND TO CONCEAL FGL +0.300 (MIN.) 100mm THICK 3000PSI CONCRETE. PROPOSED
200 100

BOLTS & STIFFENERS EQUIPMENT PAD


(SMOOTH FINISH) 700mm (min)
300

550
400
HANDHOLE TOP COVER
100

NGL ±0.000
TOP OF ROADWAY
110 300

BOX CONCRETE
700

ENCASEMENT

0
60
900

R
Ø110 PVC PIPE
50
200

300 200 300 100mm THICK CONCRETE


100mm THICK CONCRETE 4 - Ø 26/32mm ENCASEMENT
75mm THICK ENCASEMENT HPDE PIPE
LEAN CONCRETE

NOTE :

IF THE HAND HOLE IS ON MAIN ROAD OR PAVEMENT, KEEP THE TOP


EQUIPMENT PAD TO HANDHOLE
OF HAND HOLE COVER AT THE SAME SURFACE OF ROAD OR
PAVEMENT.
NOTE :

IF THE HAND HOLE IS ON MAIN ROAD OR PAVEMENT, KEEP THE TOP


800 OF HAND HOLE COVER AT THE SAME SURFACE OF ROAD OR
600 PAVEMENT.
CONCRETE COVERING
550 ALL AROUND TO CONCEAL
OPENING BOLTS & STIFFENERS
(SMOOTH FINISH)
100 600 100
25
HANDHOLE TOP COVER

800
600
550
RISING SLOT

100
TOP OF ROADWAY
800

4MMTHHK

HOLES FOR 16mmØ STIFFENER PLAT


HANDHOLE COVER DETAIL
EXPANSION BOLTS
Ø110mm STEEL PIPE
3mm THICKNESS

HANDHOLE DETAIL PLAN

CONCRETE COVERING 16mmØ EXPANSION BOLTS


CONCRETE COVERING
ALL AROUND TO CONCEAL
800 ALL AROUND TO CONCEAL
BOLTS & STIFFENERS 125 550 125 BOLTS & STIFFENERS
(SMOOTH FINISH) 25 25
(SMOOTH FINISH)

125
HANDHOLE TOP COVER
100

25
TOP OF ROADWAY

DITO

800
550

800
4-HPDE CONDUIT
110 300

195 195
Ø26/32mm
700

2020
900

25
125
50

800
Ø110mm PVC PIPE
200

HANDHOLE COVER
IRON SUMP FRAME
300 200 300

75mm THICK HANDHOLE DETAIL PLAN


LEAN CONCRETE
CABLE TRAY
ACPDB

RESERVE FOR EQUIPMENT POWER


FUTURE CABINET CABINET SUPPLY CABINET

Y
2 STRUCTURAL FRAMING PLAN
1 CONCRETE PAD LAYOUT SCALE 1:10M

SCALE 1:10M

POWER
SUPPLY
CABINET
WORKING PLATFORM ACPDB

FGL FGL

3Ø75 IMC
EXPOSED PIPE

WORKING PLATFORM

FGL FGL

3Ø75 PVC
EMBEDDED PIPE

1Ø75 PVC

3 ELEVATION VIEW & FOUNDATION DETAIL


EMBEDDED PIPE (DIRECTLY
TAP TO NEAREST GROUNDING)
SCALE 1:10M TO TOWER CABLE LADDER

4 SLAB SECTION DETAIL THRU "Y"


SCALE 1:10M
LLVD MCB
2x16A/1P
8x32A/1P
2x125A/1P
BLVD MCB
Battery MCB 6x16A/1P
4x125A/1P 3x25A/1P
5x32A/1P
Monitor 2x16A/1P

RECTIFIER
MODULE
DCDU-1U 50A (5)
FMS GSFU-1U
A1-1U RESERVED

RESERVED-2U

SPARE-1U DCDU ON
I
ON
I
ON
I
ON
I
ON
I
ON
I
ON
I
ON
I
ON
I
0 0 0 0 0 0 0 0 0

RESERVED-IDU-2U 9x40A OFF

40A
OFF

40A
OFF

40A
OFF

40A
OFF

40A
OFF

40A
OFF

40A
OFF

40A
OFF

40A

SPARE-1U

BBU-3U

ODF-3U

150A Lithium BATTERY

Proposed Equipment Schedule in Equipment Cabinet

NO. Equipment QTY Comments


150A Lithium BATTERY
1 DC 1
2 BBU 1
3 BATTERY 4 150AH(LI)
4 BATTERY 0 190AH(Lead Acid)
150A Lithium BATTERY 5 RECTIFIER MODULE 5 50A 150A Lithium BATTERY
6 GSFU 1
7 DCDU 1
8 DCPDB 0
9 IPRAN 1 A1
10 MW IDU 0
11 ODF 1
12 GPS ARRESTER 1

Power Supply Cabinet Equipment Cabinet


GENERAL NOTES:
1. ALL ELECTRICAL INSTALLATION WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH DITO
SPECIFICATIONS, THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE, THE RULES AND

160 AMP /Single Phase REGULATION OF THE LOCAL MUNICIPALITY AND POWER UTILITY COMPANY.
2. WIRING METHOD:
A. INTERMEDIATE METAL CONDUIT (IMC) FOR SERVICE ENTRANCE AND ALL EXPOSED PORTIONS.
SERVICE ENTRANCE PEDESTAL 2 - 38mm² THW (BLACK/RED) + B. UNDERGROUND CONDUITS SHALL BE PVC, ENCASED IN CONCRETE .
1 - 14mm² THW GROUND (GREEN) C. GROUNDING WIRES SHALL BE INSULATED.
IN 50mmØ IMC OR 50mm PVC PIPE
3. ALL NON-CURRENT CARRYING ELECTRICAL EQUIPMENT PARTS SHALL BE PROPERLY GROUNDED.
4. MINIMUM WIRE SIZE INSTALLED SHALL BE 3.5 mm² TYPE THHN/THW, UNLESS OTHERWISE INDICATED.
5. ALL WIRES SHALL BE A BRAND
MECB
TO ELECTRIC UTILITY CO. IN NEMA 3R ENCLOSURE 6. WIRING DEVICES SHALL BE A BRAND.
SERVICE DROP 160 AT, 2P, 25 kAIC MCCB 7. ALL CIRCUIT BREAKERS SHALL BE BOLT ON TYPE IN IP 55 ENCLOSURE
230VAC, 1 PHASE SYSTEM, 60Hz 230V, 60 Hz (ACPDB) FOR OUTDOOR LOCATIONS, USING DITO TYPE APPROVED ENCLOSURE.
SPD AC DISTRIBUTION PANEL 8. MAIN CIRCUIT BREAKERS SHALL BE INDUSTRIAL TYPE, 25 kAIC, WHILE BRANCH CIRCUIT BREAKERS
100 kA IP 55 Enclosure SHALL BE COMMERCIAL TYPE, 10 kAIC
9. INSULATION TEST SHALL BE DONE BEFORE THE SITE IS ENERGIZED AND WITNESSED .
160 AT, 2P
RESISTANCE SHALL BE GREATER THAN FIFTY(50) MEGA OHMS.
2 - 38mm² THW (BLACK/RED) + 10. ALL EQUIPMENT AND MATERIALS SHALL BE BRAND NEW AND SUITED TO THE REQUIRED USE.
125AT, 2P
1 - 14mm² THW GROUND (GREEN
RECTIFIER 1 1 2 SPACE 11. PULL BOXES OR JUNCTION BOXES SHALL BE PROVIDED, EVEN IF NOT
IN 40mmØ IMC OR 40mm PVC PIPE
20AT, 2P 20AT, 2P
INDICATED IN THE PLANS.
M Perimeter Light 3 4 C.OUTLETS 12. ALL ELECTRICAL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY
20AT, 2P 20AT, 2P
LICENSED AND REGISTERED ELECTRICAL ENGINEER.
GENSET PROVISION SPARE 5 6 SPARE
MTS 20AT, 2P NOTE:
2 - 38mm² THW (BLACK/RED) +
1 - 14mm² THW GROUND (GREEN) IN NEMA 3R OR 4X ENCLOSURE SPARE 7 8 SPACE 1. THE POWER CORD OF THE SITE AVIATION OBSTRUCTION LIGHT SHOULD BE INSTALLED WITH
2-160 AT, 2P, 25 kAIC MCCB
IN 50mmØ IMC OR 50mm PVC PIPE 230V, 60 Hz
A POWER CABLE WITH A METAL SHEATH OR LAID THROUGH A STEEL TUBE.
SPACE 9 10 SPACE
THE METAL OUTER SHEATH OF THE CABLE (OR STEEL PIPE) SHOULD BE GROUNDED AT
BOTH ENDS AND INTO THE EQUIPMENT ROOM.

TO GROUNDING LOOP
BOTH ENDS OF THE OUTDOOR CABLE LADDER SHOULD BE GROUNDED, AND THE GROUND
SINGLE LINE DIAGRAM CONNECTION
NTS SCALE WIRE SHOULD BE A MULTI-STRAND COPPER WIRE WITH A CROSS-SECTIONAL AREA OF NOT
LESS THAN 10MM2.
2. IF THE AVIATION OBSTRUCTION LIGHT IS DUAL TYPE (AC) TAPPING POINT SHALL BE AT THE ACPDB CIRCUIT NO.5.
SCHEDULE OF LOADS (160 AMP MAIN) 3. IF THE AVIATION OBSTRUCTION LIGHT IS SINGLE TYPE (DC) TAPPING POINT SHALL BE AT THE RECTIFIER CABINET.
PANEL : ACPDB
ENCLOSURE : IP 55 W/ GROUNDING BAR; BOTTOM FEED
POWER SOURCE : 230V, 1-PHASE, 60Hz

CIRCUIT BREAKERS
CKT. LOAD DESCRIPTION VOLTS_V LOAD_VA LOAD_AMP Computation: KVA LOAD SINGLE PHASE:
NO. AT POLE WIRE SIZE GROUND SIZE CONDUIT = (230 x 96.75) / 1000
LOAD_AMP = LOAD_VA / LOAD_V
= 22.3 kVA
RECTIFIER 1 230 15000 65.22 125 2P 2 - 38mm², THW 1-14mm², THW 50.8mm Ø IMC Pipe(2"), or 50mm Ø PVC
DEMAND FACTOR (%) = 100
1 = 25 kVA, which is still minimum allowable transformer
TOTAL AMP = 77.40 A
- - - - - - - capacity of COOP.
2 SPACE PROTECTION AMP = TOTAL AMP * 1.25 = 96.75 A

3 Perimeter Light 230 400 1.74 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC

C. OUTLETS Feeder: LEGEND


4 230 600 2.61 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC
2-38mm² THW (Black/Red)+ 1-14 mm² THW GROUND (GREEN)
5 SPARE 230 600 2.61 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC IN 50 mmØ IMC or 50mm Ø PVC
M KILOWATT HOUR METER
6 SPARE 230 600 2.61 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC
MAIN ENCLOSED CIRCUIT BREAKER
7 SPARE 230 600 2.61 20 2P 2 - 3.5mm², THHN 1 - 3.5mm², THHN 15.4mm Ø IMC Pipe(1/2"), or 20mm Ø PVC Protection: MECB

160 AT, 1-Phase MECB 2P, 230 V, 25 kAIC (EZD), MTS MANUAL TRANSFER SWITCH
8 SPACE - - - - - - -
in NEMA 3R or 4x Enclosure. ACPDB AC PANEL DISTRIBUTION BOARD
9 SPACE - - - - - - -

10 SPACE - - - - - - -
SPD
TOTAL LOAD 17800 77.40
GROUND

SERVICE ENTRANCE
FB 40x4 TYP
WITH 2Ø12 PERIMETER
HOLE FOR LIGHT
CONNECTING SEE TEST
EQUIPMENT TO PIT DETAIL
EARTHING BAR

PROPOSED :
EQUIPMENT 10 HOLES BUSBAR
CABINET

PROPOSED COMPACTED
24 HOLES BUSBAR FILL

PERIMETER
LIGHT 4
4 TYP

PERIMETER
LIGHT
NOTE:
FB 40x4
The grounding 24 HOLES BUSBAR of the
cabinet shall be reliably connected to the
underground grounding grid, and the
grounding resistance shall not be more
than 10 ohms.
POWER ALL THE INTERSECTIONS
SUPPLY MUST BE CONNECTED
CABINET THROUGH WELDING
PROPOSED
PROPOSED 3GT-36-280-2NPT (290KPH/C)
ACPDB TOWER
LOCATION
L-BAR 50x50x5
& SURGE
PROTECTOR
DEVICE
AT THE FB-40x4
BACK
PERIMETER
LIGHT

2 DETAIL A
SCALE : NTS
L-BAR 50x50x5 TYP
L=2500
(SEE DETAIL A)

1 EARTHING & LIGHTNING DETAILS


SCALE : NTS
3 WAY 4 WAY
EXOTHERMIC EXOTHERMIC
CONN CONN

3 WAY 3 WAY
EXOTHERMIC EXOTHERMIC
CONN CONN

CRIMP TYPE
3 WAY TERMINAL LUG
EXOTHERMIC FOR ACPDB
CONN

EQUIPMENT
CABINET
SEE TEST
PIT DETAILS

+0.3m

3 WAY
EXOTHERMIC
CONN
POWER
1-10 HOLES GROUNDING
SUPPLY BUSBAR FOR ELECTRICAL
ACPDB
CABINET EQUIPMENT PAD
PROPOSED 30mm² INSULATED COMPACTED
ACPDB COPPER CABLE FILL
LOCATION 3 WAY
& SURGE
(GREEN)FOR GROUNDING
EXOTHERMIC
PROTECTOR ELECTRODE CONDUCTOR
CONN
DEVICE Using Exothermic Weld or CAD Weld
AT THE 3 WAY To Bond the grounding cable and
BACK 4 WAY EXOTHERMIC Grounding Rod
3 WAY
EXOTHERMIC CONN EXOTHERMIC
CONN
CONN
3 WAY
EXOTHERMIC
CONN
MTS
MCB
38mm ² BARE COPPER WIRE

HH

16mmØ or 5/8"Ø x3m


COPPER CLAD STEEL

1 EARTHING & LIGHTNING DETAILS


SCALE : NTS

²
2 DETAIL A
SCALE : NTS

²
AIR TERMINAL ROD

ANTENNA
RRU

MW DISH
ODU

AIR TERMINAL ROD CONNECTED WITH 2 - 40mmx4mm FLATBAR DOWN


LEAD TO THE LADDER RACK CONNECTED TO THE TOWER FOOT FLANGE REFER TO NOTE 9.
USING BOLT AND NUT AS PER RECOMMENDED AND APPROVED BY DITO
TELECOMMUNITY.

1-10 HOLES GROUNDING


30mm² INSULATED
BUSBAR @ ELECTRICAL
COPPER CABLE(GREEN) For GROUNDING EQUIPMENT PLATFORM
ELECTRODE CONDUCTOR
40mmx4mm HDG FLATBAR

GROUNDING CABLE
UNDER OR PROVIDED
30mm² INSULATED
BY TI GROUP
COPPER CABLE(GREEN) For GROUNDING
ELECTRODE CONDUCTOR

LEGEND:

POWER CABINET
POWER CABINET
40mmx4mm HDG FLAT BAR

CIRCUIT BREAKER
MAIN ENCLOSED
ACPDB

FOR GROUNDING ELECTRODE CONDUCTOR


CONNECTED TO GROUND LOOP RING
COPPER CLAD STEEL

FROM THE TOWER FOOT FLANGE IT MUST BE WELDED WITH 40mmx4mm HDG FLAT BAR
CONNECTING TO THE GROUND LOOP USING WELDING AND MUST BE COAT WITH ASPHALT

±0.000
GROUND LEVEL GROUND LEVEL

Using Exothermic Weld or Cad Weld GROUND LOOP RING 38mm² BARE COPPER WIRE
To Bond the grounding cable and 3000 3000
Grounding Rod

USE CADWELD METHOD TO CONNECT USE CADWELD METHOD TO CONNECT SEE TEST PIT DETAILS
THE 40mmx4mm HDG FLATBAR TO THE GROUND LOOP THE 40mmx4mm HDG FLATBAR TO THE GROUND LOOP

USE CADWELD METHOD TO CONNECT WHEN THE GROUNDING


THE 38mm² BARE COPPER WIRE FROM SERVICE
EQUIPMENT ROD CONNECT TO THE GROUND LOOP
RESISTANCE IS GREATER
USE EARTH ROD CLAMPS
THAN 10 OHMS, ADD THIS
TO CLAMP THE BCW PART OF GROUNDING BODY
THAN 10 OHMS, ADD THIS

GROUNDING RISER DIAGRAM PART OF GROUNDING BODY

C:\Users\admin\Pictures\DITO LOGO Full Color.png