This document is a daily work report from the quality control engineering group of the polypropylene unit at the Tabriz Petrochemical Company in Iran. It summarizes the mechanical work carried out on August 27, 1400 including sanding, painting, welding, and fitting of various pipes and equipment. A total of 209 square meters of polyurethane coating was applied along with 104 square meters of polyamide primer coating. Issues reported include needing to purchase caulk for doors and windows. The report is signed off by quality control engineers.
This document is a daily work report from the quality control engineering group of the polypropylene unit at the Tabriz Petrochemical Company in Iran. It summarizes the mechanical work carried out on August 27, 1400 including sanding, painting, welding, and fitting of various pipes and equipment. A total of 209 square meters of polyurethane coating was applied along with 104 square meters of polyamide primer coating. Issues reported include needing to purchase caulk for doors and windows. The report is signed off by quality control engineers.
This document is a daily work report from the quality control engineering group of the polypropylene unit at the Tabriz Petrochemical Company in Iran. It summarizes the mechanical work carried out on August 27, 1400 including sanding, painting, welding, and fitting of various pipes and equipment. A total of 209 square meters of polyurethane coating was applied along with 104 square meters of polyamide primer coating. Issues reported include needing to purchase caulk for doors and windows. The report is signed off by quality control engineers.