Software: Swot Matrix

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

FORMATO MATERIALES DEL PROGRAMA

Fase: Análisis
Actividad de Proyecto: Analizar los procesos y datos del Sistema de Información
Actividad de Aprendizaje: Identificar modelos de calidad y procesos de producción de
Software
Personaje Asociado: Laura (bilingüe)

SERVICIO NACIONAL DE APRENDIZAJE- SENA

CENTRO DE FORMACIÓN A DISTANCIA

MATERIAL DE APOYO

MATRIZ DOFA/ SWOT MATRIX

PROGRAMA: TECNOLOGO EN ANÁLISIS Y DESARROLLO DE SISTEMAS DE

INFORMACIÓN

SENA de Clase Mundial


FORMATO MATERIALES DEL PROGRAMA
Fase: Análisis
Actividad de Proyecto: Analizar los procesos y datos del Sistema de Información
Actividad de Aprendizaje: Identificar modelos de calidad y procesos de producción de
Software
Personaje Asociado: Laura (bilingüe)

CONTENT

1. SWOT MATRIX
2. GLOSSARY
3. REFERENCES
4. CREDITS

COMPANY`S NAME Comestibles Aldor ECONOMIC SECTOR Private sector


( GMC Area - Tasks fingering )
STRENGTHS WEAKNESSES

1. Easy to enter data into the system. 1. No, data can be entered in amounts, only one
2. The base data used by the program is safe. by one.
3. Filter means to configure data level. 2. Takes to load some requests by the user to
4. Ability to configure processes and / or areas of the request information to update or validate data
plant. already typed.
5. Allows can add other modules to make a better 3. It does not allow easily export data to Excel
analysis of the data, that is, that the captured for further analysis.
information is more accurate for better decision 4 The system prompts to type enough data.
making more modules can be integrated 5. The database, after entering several data sets

SENA de Clase Mundial


FORMATO MATERIALES DEL PROGRAMA
Fase: Análisis
Actividad de Proyecto: Analizar los procesos y datos del Sistema de Información
Actividad de Aprendizaje: Identificar modelos de calidad y procesos de producción de
Software
Personaje Asociado: Laura (bilingüe)
heavy to take to export information to Excel.
OPORTUNITIES
TREATHS

1. Currently you do not find opportunities to


current ERP system used to capture data from 1. New ERP system acquired by the company.
GMC area.
Clarification: this ERP system I use to capture data 2. The current structure of information migrated
from the GMC plant is different the new ERP or unifies all methods or information systems to
system that has acquired the company. the new ERP system, which would imply that the
complete renovation of the new ERP system, the
2. The date system can be improved for data entry by current ERP system will disappear.
the user.
3. Improve access times to database. 3. Unsafe to enter and / or edit data already
entered into the system.
4. A friendlier environment for the user.
4. Easy to erase the data entered.
5. A more explicit system to better understand the
data analyzed graphics. 5. Availability of similar products of the
enterprise software market and competitive
prices.

SENA de Clase Mundial


FORMATO MATERIALES DEL PROGRAMA
Fase: Análisis
Actividad de Proyecto: Analizar los procesos y datos del Sistema de Información
Actividad de Aprendizaje: Identificar modelos de calidad y procesos de producción de
Software
Personaje Asociado: Laura (bilingüe)

2. GLOSSARY

2. REFERENCES

www.wordreference.com
http://www.lextutor.ca/tests/
http://readinenglish.net/students
http://www.saberingles.com.ar
Dictionary English /Spanish:www.wordreference.com

3. CREDITS

CARDONA, A.N. March 4th, 2012. CESGE, Centro de Servicios y Gestión Empresarial,
Medellín. Regional Antioquia.

SENA de Clase Mundial


FORMATO MATERIALES DEL PROGRAMA
Fase: Análisis
Actividad de Proyecto: Analizar los procesos y datos del Sistema de Información
Actividad de Aprendizaje: Identificar modelos de calidad y procesos de producción de
Software
Personaje Asociado: Laura (bilingüe)

SENA de Clase Mundial

You might also like