CHECKLIST FOR DISMANTLING OF MEP WORKS

Form No. Report No.:

IR No: Date:

Location:

Drawing No.:

Conforming to the Requirements


SN Item Description Remarks
Yes No N/A

1 Permits / Clearance
All necessary Permits / clearance obtained & approved?

A. Approval from local authorities - Kharamaa & QCDD

B. Permit To Work (PTW) prior to dismantling Works


C. STARRT Card prior to Dismantling Works
(Lifting Permit, Hot Work Permit, Work
at Height Permit)
D. Civil clearance obtained

2 Document & Drawing Approval


All necessary documents, drawing obtained & approved?
A. Method Statement

B. Risk Assesment
C. Issued For Construction (IFC) Drawing
D. Material Approval Request (MAR) - If Any

3 Site Preparation
A.Temporary traffic signs, safety barricades & Fire extinguishers in place?

B. Safe access and enough lighting provided at site


C. Suiable manpower available for the job
D. Existing MEP services surveyd prior to dismantling
E. Certified lifting gears availbe at site

4 Dismantling works
A. Dismantling as per approved method statement & IFC drawings?
B. Kharamaa utility Services - isolated & disconnected?
C. LOTO procedure followed
D. Electrical Low voltage & Extra low voltage systems:
iv. Threaded joint pipes & valves disconnected from the fittings
v. Ducts disconnected from the joints

5 Verification and storage of dismantled materials


A. Waste & debris removed from site. Dismantled MEP components cleaned
B. Dismanled MEP components segregated and kept at allocated place

C. MEP dismantled Materals kept above ground and properly covered


D. Storage of materials as per manufacturer standard
REMARKS :

PDTC/LCC PROJACS QDC

NAME :

SIGN :

DATE :

180-MG-ITR-CIV-0001 Rev. 00 Page 1 of 2


AMAN HOSPITAL CONSTRUCTION WORKS

CHECKLIST FOR DEMOLITION OF CIVIL WORKS


(Concrete Slabs/Beams/Internal & Partition Walls)
Form No. Report No.:

RFI No: Date:

Location:

Drawing No.:

Conforming to the Requirements


SN Item Description Remarks
Yes No N/A

1 Permits

All necessary Permits Obtained & Approved?


A. Permit Prior to Demolition
B. Lifting Permit
C. Night Work Permit
D. Hot Work Permit
E. Work at Height Permit
F. Confined Space Permit
G. Calibration of Equipments to be used, Operator of Equipment is
Well trained or Not

2 Preliminary Preparations

Precautionary Measures & Safety Requirements?


A. Exclusion Zone
B. Hoardings
C. Scaffoldigs/Safe Working Platforms
D. Screen Covers/Nets
E. Tag lines
F. Safety Permit

Temporary Traffic signs Installed?


3
Barriers,Signages, Road Markings If any are Visible & In Place

Demolition Works.
Demarcation plan for demolition done?
4 Additional Supports/Strengthening of adjacent structrues is done, if
any, as per approved method?
Structrural Clearance is Provided by Design Consultant?
Final Check
5 Demolition area cleared and free from all debris & Wastage is
deposited at designated location.

REMARKS :

MEDGULF TPI KEO

SIGN :

NAME :

DATE :