EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Installation Inspection
Space between the ceiling and the roof shall be per the approved IFC
A1 IFC Drawings
drawings to allow for ducts, lighting fixtures and trays.
Splines used to form concealed joints shall be compatible with the tile
SAES-M-100
A4 and its kerf designs so that adjacent tiles will be horizontal and even at
Sec. D
joints. (1997 UBC, Sec. 25.209.5)
B Final Inspection
The final assembly shall not deviate from a horizontal, flat planar surface
SAES-M-100
B1 by more than 8mm's in any 3m run in either direction.
Sec. D
(1997 UBC, Sec. 25.209.6)
Runners supporting lighting fixtures or ceiling vents shall not rotate more SAES-M-100
B3
than +20 after the fixture loads are imposed. (1997 UBC, Sec. 25.209.7) Sec. D
Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Acoustical False Ceilings Installation & Final Inspection SAIC-M-1054 18-May-05 Civil
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-M-100 -- Saudi Aramco Building Code, 30 June 2002
2- 1997 UBC -- Uniform Building Code, 1 January 1997
Page 2 of 2