Saic Q 1005
Saic Q 1005
Saic Q 1005
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Plant scales shall be calibrated no less than three times a year and shall
09-SAMSS-097
A1 be certified as conforming to ASTM C94 by Saudi Aramco approved
Sec. 9.3
calibration agency.
The concrete specimens shall be subjected for final curing with free
09-SAMSS-097
A2 water maintained on their surfaces at all times at a temperature of
Sec. 4
23°C±2°C. (ASTM C94/ASTM C-31 Sec. 10.1.3)
REMARKS:
REFERENCE DOCUMENTS:
1- 09-SAMSS-097 -- Ready Mixed Concrete, 31 July 2004
Page 1 of 1