Download as pdf or txt
Download as pdf or txt
You are on page 1of 21

ADVANCE ENGINEERING CLASSES

Central India’s leading institute for


SSC-JE, VYAPAM-SE, RRB-JE/SSE, MPPSC-AE
Mob.: +917879930147, Ph.: 0755-4916240

Surveying all Questions Of SSC JE 2016 Exam

(Held Between 1st March to 4th March 2017 )

Q 1 The main principal of surveying is to work

(a) from part to the whole

(b) from hole to the part

(c) from higher level to lower level

(d) from lower level to higher level

ANS B

Q 2 In case of a direct vernier scale

(a) graduations increase in opposite direction in which graduations of the main scale increase

(b) smallest division is longer than smallest division of the main scale

(c) graduation increase in the same direction in which graduations f the main scale increase

(d) none of these

ANS C

Q 3 The slope correction for a length of 30 m along a gradient of 1 in 20 is

(a) 3.75 cm

(b) 0.375 cm

(c) 37.5 cm

(d) 2.75 cm

ANS A

Q 4 Correction per chain length of 100 links along a slope having a rise of 1 unit in n horizontal units is

(a) 100/ n 2

116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 1
ADVANCE ENGINEERING CLASSES Surveying

(b) 100 n 2

(c) 100/ n3

(d) 100/ n 2

ANS A

Q 5 In chain surveying field work is limited to

(a) linear measurement only

(b) angular measurements only

(c) both linear and angular measurements

(d) all options are correct

ANS A

Q 6 If the chain line which runs along N-S direction is horizontal and the ground in E-W direction is sloping

(a) it is possible to set offsets correctly on east side

(b) it is possible to get offsets correctly on east side

(c) it is not possible to set offsets correctly on west side

(d) it is possible to sett offsets correctly on both sides

ANS D

Q 7 The real image of an object formed by the objectives must lie

(a) in the plane of cross hairs

(b) at the center of the telescope

(c) at the optical center of the eye piece

(d) anywhere inside the telescope

ANS A

Q 8 A relatively fixed point of known elevation above datum is called

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 2
ADVANCE ENGINEERING CLASSES Surveying

(a) bench mark

(b) datum point

(c) reduced level

(d) reference point

ANS A

Q 9 For true difference in elevations between two points A and B the level must be set up

(a) at any point between A and B

(b) at the exact mid point of A and B

(c) near the point A

(d) near the point B

ANS B

Q 10 The assumption on which the trapezoidal formula for volumes is based, is

(a) The end section are parallel planes

(b) the mid-area of a pyramid is half the average area of the ends

(c) the volume of the prismoidal is over-estimated and hence a prismoidal correction is applied

(d) all options are correct

ANS D

Q 11 The correction to be applied to each 30 meter chain length along 00 slope is

(a) 30 ( sec θ )m

(b) 30 ( sin θ ) m

(c) 30 (cos θ ) m

(d) 30 (tan θ -1) m

ANS D

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 3
ADVANCE ENGINEERING CLASSES Surveying

Q 12 Correction per chain length of 100 links along a slope of a 2 is

(a) 1.5 a 2 /100

(b) 1.5 a/100

(c) 1.5 a 3 /100

(d) 1.5 a 3

ANS A

Q 13 An angle of 450 with a chain line may be set out with

(a) optical square

(b) open cross staff

(c) French cross staff

(d) prismatic square

ANS C

Q 14 The conventional sign shown in the figure below represents

(a) Bridges carrying railway below the road

(b) Bridges carrying road below railway

(c) Bridges carrying road and railway at the same level

(d) A level crossing

ANS B

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 4
ADVANCE ENGINEERING CLASSES Surveying

Q 15 The surface of zero elevation around the earth, which is slightly irregular and curved is known as

(a) mean sea level

(b) geoid surface

(c) level surface

(d) horizontal surface

ANS B

Q 16 The imaginary line passing through the intersection of cross hairs and the optical center of the objectives is
known as

(a) line of sight

(b) line of collimation geoid

(c) axis of the telescope

(d) none of these

ANS B

Q 17 The rise and fall method of reduction of levels, provides a check on

(a) back sights

(b) foresights

(c) both back sights and foresights

(d) none of these

ANS C

Q 18 If the plane table is not horizontal in a direction at right angles to the alidade, the line of sight is parallel to the
fiducial edge only for

(a) horizontal sights

(b) inclined sight upward

(c) inclined slight downward

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 5
ADVANCE ENGINEERING CLASSES Surveying

(d) none of these

ANS A

Q 19 A relatively fixed point of known elevation above datum is called

(a) datum point

(b) benchmark

(c) reduced level

(d) reference point

ANS B

Q 20 The sag correction in surveys is always

(a) positive

(b) negative

(c) zero

(d) none of these

ANS B

Q 21 In compass surveying

(a) the direction and lengths of survey line is measured by compass

(b) the direction is measured by compass

(c) the length of survey line is measured by chain or tape

1. Only A

2. Only B

3. Only c

4. Both B and C

ANS D

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 6
ADVANCE ENGINEERING CLASSES Surveying

Q 22 In the Prismatic Compass,

(a) the graduate ring attached to the compass moves with sights

(b) usage is not possible without a tripod

(c) the needle remains stationary when box is roated

(d) whole circle bearings are calculated

ANS D

Q 23 True meridians,

(a) are parallel to each other

(b) converge at a point Pole

(c) converge near equator

(d) None of these

ANS B

Q 24 Inclination of the compass needle to the horizontal towards the pole is called

(a) Dip

(b) Declination

(c) Azimuth

(d) Bearing

ANS A

Q 25 The dip of the compass needle

(a) is constant

(b) varies from place to place and is zero at the equator and maximum at the poles

(c) is zero at the equator and poles

(d) None of these

ANS B

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 7
ADVANCE ENGINEERING CLASSES Surveying

Q 26 Magnetic declination

(a) remains same at different places

(b) varies from place to place

(c) does not vary with temperature

(d) none of these

ANS B

Q 27 Section AA indicates:

(a) steep slope

(b) Flat slope

(c) Uniform slope

(d) Ridge

ANS A

Q 28 What is the true area if the area calculated by a chain which is found to be 0.8 link too long is 100 acres?

(a) 100.8

(b) 99.2

(c) 98.4

(d) 101.6

ANS D

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 8
ADVANCE ENGINEERING CLASSES Surveying

Q 29 Closed contours with higher value inside represents

(a) depression

(b) hill

(c) plan surface

(d) none of these

ANS B

Q 30 In a theodolite the line of collimation is

(a) parallel to axis of plate levels

(b) parallel to the verticle

(c) perpendicular to the trunnion axis

(d) parallel to the horizontal axis

ANS c

Q 31 How does the size of the theodolite specified?

(a) by the length of telescope

(b) by the diameter of vertical circle

(c) by the diameter of upper plate

(d) by the diameter of lower plate

ANS D

Q 32 In the surveys, the slope correction applied to the base line is

(a) always cumulative

(b) always compensating

(c) sometimes cumulative, sometimes compensating

(d) none of these

ANS C

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 9
ADVANCE ENGINEERING CLASSES Surveying

Q 33 Contour interval on map sheet denotes

(a) vertical distance of contour lines above the datum plane

(b) vertical distance between two successive contour lines

(c) slope distance between two successive contour lines

(d) horizontal distance between two successive contour lines

ANS B

Q 34 Which of the following is the correct meaning if the term level line in surveying

(a) the line parallel to the mean spheroidal surface of earth

(b) the line is horizontal

(c) the line passing through the centre of cross-hairs and the centre of the eye piece

(d) the line passing through the objective lens and the eye piece of a dumpy or tilting level

ANS A

Q 35 The type of surveying in which the curvature of the earth is taken into account is called

(a) geodetic surveying

(b) plane surveying

(c) preliminary surveying

(d) topographical surveying

ANS A

Q 36 The method of leveling used to carry out reconnaissance of area is :

(a) check levelling

(b) fly levelling

(c) profuile levelling

(d) simple leveling

ANS B

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 10
ADVANCE ENGINEERING CLASSES Surveying

Q 37 In a closed traverse

(a) difference between fore-bearing and back-bearing should be 900

(b) sum of included angles should be (2N-4) times right angle, where N represents the number of sides

(c) sum of included angles should be (2N-10 times right angle, where N is the number of sides

(d) none of these

ANS B

Q 38 The Horizontal angle which the true meridian makes with magnetic meridian is called

(a) Magnetic declination

(b) True declination

(c) Dip

(d) Azimuth

ANS A

Q 39 Hydrographic survey deals with the mapping _

(a) large water bodies

(b) canal system

(c) colour movement

(d) none of these

ANS A

Q 40 If the smallest division of a Vernier is longer than the smallest division of its primary scale, the Vernier is known
as

(a) direct vernier

(b) double vernier

(c) simple vernier

(d) retrograde vernier

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 11
ANS D
ADVANCE ENGINEERING CLASSES Surveying

Q 41 A well-conditioned triangle has angles not less than _ and more than _ respectively

(a) 100 , 900

(b) 200 , 1200

(c) 900 , 1200

(d) none of these

ANS c

Q 42 Compensating errors in chaining are

(a) proportional to the length of the line

(b) proportional to the square root of the length of the line

(c) inversely proportional to the square root of the length of the line

(d) inversely proportional to the length of the line

ANS B

Q 43 If a chain is found too short on testing, it can be adjusted by

(a) straightening the links

(b) inserting additional circular rings

(c) flattening the circular rings

(d) any of the options

ANS D

Q 44 Permissible limits of error in chaining for measurement on rough or hilly ground is

(a) 1 : 2000

(b) 1 : 1000

(c) 1 : 500

(d) 1 : 250

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 12
ADVANCE ENGINEERING CLASSES Surveying

ANS D

Q 45 Invar tapes are made of an alloy of

(a) nickel and steel

(b) copper and steel

(c) tin and steel

(d) aluminum and steel

ANS A

Q 46 Chainage is the distance measured

(a) along a chain line

(b) perpendicular to a chain line

(c) perpendicular to a tie line

(d) none of these

ANS A

Q 47 In chain survey execution, the first taken is

(a) refrence sketches

(b) marking stations

(c) running survey line

(d) reconnaissance

ANS D

Q 48 Geodetic survey is different from plane surveying because of _

(a) Very large area is covered

(b) The curvature of the earth is considered

(c) Undulations of the topography

(d) The large difference of elevations

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 13
ANS B
ADVANCE ENGINEERING CLASSES Surveying

Q 49 A scale representing either three units or only one unit and its fractions upto second place of decimal point is _

(a) Diagonal scale

(b) Comparative scale

(c) Vernier scale

(d) shrunk scale

ANS A

Q 50 Difference in length of an arc and its subtended chord on earth’s surface for a distance of 18.2 km is _

(a) 10 mm

(b) 15 mm

(c) 22 mm

(d) 100 mm

ANS A

Q 51 Chain surveying is most suitable when _

(a) The ground is fairly leveled and open with simple details

(b) The area is small in extent

(c) Plans are required on a large scale

(d) All options are correct

ANS D

Q 52 Every 20 m chain should be accurate to within_

(a) ±2 mm

(b) ±5 mm

(c) ±8 mm

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 14
ADVANCE ENGINEERING CLASSES Surveying

(d) None of these

ANS B

Q 53 Method used for chaining on sloping ground is

(a) By stepping method

(b) By hypotensusal allowance

(c) By clinometers method

(d) Both stepping method and hypotensual method

ANS D

Q 54 Maximum allowable limit upto that a measurement may vary from the true value

(a) Permissible error

(b) Residual error

(c) Expected error

(d) Safe error

ANS A

Q 55 Number of links in a 30 m metric chain is

(a) 100

(b) 150

(c) 180

(d) 200

ANS B

Q 56 Prolongation of chain line across an obstruction in chain surveying is done by

(a) making angular measurements

(b) drawing perpendiculars with a chain

(c) solution of triangles

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 15
ADVANCE ENGINEERING CLASSES Surveying

(d) All options are correct

ANS B

Q 57 Positive error is caused if

(a) Length of chain is shorter than the standard

(b) Slope and sag corrections is not applied

(c) Measurement are made along the incorrectly aligned line

(d) All options are correct

ANS D

Q 58 For which of the following will the chain surveying be well adopted one?

(a) Large areas with difficult details

(b) Small surveys in open ground

(c) Small surveys with crowded details

(d) Large areas with simple details

ANS B

Q 59 Which of the following leveling is carried out to determine the elevation difference between two points on the
surface of earth?

(a) Reciprocal levelling

(b) Simple leveling

(c) Longitudinal levelling

(d) differential leveling

ANS D

Q 60 Which of the following would represent the surface of the water level of a still lake?

(a) Level surface

(b) Contour surface

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 16
ADVANCE ENGINEERING CLASSES Surveying

(c) Horizontal surface

(d) None of these

ANS A

Q 61 A contour canal is_

(a) irrigates only on one side

(b) does not needs bank on higher side

(c) is generally aligned parallel to the contour of the area

(d) All options are correct

ANS D

Q 62 Which of the following are the required corrections for runway length?

(a) correction for elevation

(b) correction for gradient

(c) correction for temperature

(d) All options are correct

ANS D

Q 63 The representation of general topography of a very flat terrain is possible only by

(a) Drawing contours at large interval

(b) drawing contours at small interval

(c) giving spot levels at large interval

(d) giving spot levels to salient features at close interval

ANS D

Q 64 The telescope of a Dumpy level_

(a) is rigidly fixed to the leveling head

(b) can be titled in a vertical plane

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 17
ADVANCE ENGINEERING CLASSES Surveying

(c) can be taken out of its supports and reversed

(d) permits interchange of eye piece and object glass

ANS A

Q 65 Left swing is not much favoured in theodolite survey, because

(a) most of surveyors are accustomed to right hand

(b) it is inconvenient to turn the telescope anti-clockwise

(c) the readings increase clockwise

(d) vertical scale comes to an inconvenient position to be read

ANS C

Q 66 Point of tangency is the_

(a) beginning of the curve

(b) end of the curve

(c) common point where the radius changes

(d) common point where the radius and direction changes

ANS B

Q 67 If the bearing of AB= N 40 degree W, bearing of BC = S 70 degree E, then the value of angle ABC is

(a) 30 degree

(b) 70 degree

(c) 100 degree

(d) none of these

ANS D

Q 68 If h is the difference in height between end points of a chain of length I the required slope correction is_

(a) h 2 /(2L)

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 18
ADVANCE ENGINEERING CLASSES Surveying

(b) h/(2l)

(c) h 2 /I

(d) h 2 /(4L)

ANS A

Q 69 Correction per chain length of 100 links along a slope of a radians is_

(a) 100 a 2

(b) 100 a

(c) 100 a 3

(d) 100 a(-1)

ANS B

Q 70 Check line sin chain surveying are essentially required_

(a) to plot the chain lines

(b) to plot the offsets

(c) to indicate the accuracy of the survey work

(d) to increase the out-turn

ANS C

Q 71 For taking offsets with an optical square on the right hand side of the chain line it is held_

(a) by right hand upside down

(b) by left hand upright

(c) by right hand upright

(d) by left hand upside down

ANS B

Q 72 The conventional sign shown in the figure below represents a

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 19
ADVANCE ENGINEERING CLASSES Surveying

(a) road bridge

(b) railway bridge

(c) canal bridge

(d) aquaduct

ANS A

Q 73 In an adjusted level when the bubble is central, the axis of the bubble tube becomes parallel to_

(a) line of sight

(b) line of collimation

(c) axis of the telescope

(d) None of the these

ANS A

Q 74 An internal focusing type surveying telescope may be focused by the movement of_

(a) objective glass of the telescope

(b) convex l- lens in the telescope

(c) concave lens in the telescope

(d) plano-convex lens in the telescope

ANS C

Q 75 A dumpy level is set up with its eye-piece vertically over a peg A. the height from the top of peg A to the center
of the eye-piece is 1.540 m and the reading on peg B is 0.705 m. the level is then setup over B. the height of the eye-
piece above peg B is 1.490 m and a reading on A is 2.195 m. The difference in level between A and B is_

(a) 2.900 m

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 20
ADVANCE ENGINEERING CLASSES Surveying

(b) 3.030 m

(c) 0.770 m

(d) 0.785 m

ANS C

Q 76 The constant vertical distance between two adjacent is called_

(a) horizontal interval

(b) horizontal equivalent

(c) vertical equivalent

(d) contour interval

ANS D

Q 77 the direction of steepest slope on a contour is_

(a) along the contour

(b) at an angle of 45 degree to the contour

(c) at right angles to the contour

(d) None of the these

ANS C

Plot No. 116, Third Floor, M.P. Nagar, Zone-II, Bhopal (462011) Mob.: +917879930147, Ph.: 0755-4916240 21

You might also like