Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.

(Package-2)

Schedule No. 1 Plant and Mandatory Spare Parts Supplied from Abroad

Unit Price1 Total Price1 Taxes and Duties

Item Description Country of origin


2
Unit Quantity
Foreign Currency [xxx] Foreign Currency [xxx]
Local Currency [XXX]
CIP CIP

1 2 3* 4 5 6 7= 5 x 6 8

Schedule No. 1 Plant and Mandatory Spare Parts Supplied from Abroad

Scope-1: Anowara-Ananda bazar (New Mooring) 400 kV double circuit Underground cable line portion (2000 mm² XLPE):
1

1.1
400kV XLPE Underground Power Cable with
Necessary Accessories
400kV single core 2000sqmm copper conductor,
1.1.1 XLPE insulated, corrugated Al sheathed & MDPE km 31.518
outer sheathed cable
Straight Through Joint suitable for above cable
1.1.2 mentioned in item 1.1.1 including all related Set 12
accessories

1.1.3
Insulated Joint suitable for above cable mentioned Set 72
in item 1.1.1 including all related accessories

Outdoor Cable Sealing End for above cable


1.1.4 mentioned in item 1.1.1 including all related Set 6
accessories(Long rod type polymar)
230kV outdoor Cable Sealing End for above cable
1.1.5 mentioned in item 1.1.1 including all related Set 6
accessories(Long rod type polymar)

1.1.6
Link Box for cross bonding including all related Set 24
accessories
Link Box for earthing at straight through joint
1.1.7 Set 4
including all related accessories

1.1.8
Link Box for earthing at cable sealing end including Set 8
all related accessories

1.2
Fibre Optic Cable inclusive of joint boxes including
all related accessories

1.2.1
Fibre Optic Cable including of joint boxes and all km 5.253
related accessories

1.2.2
Fibre Optic Cable Termination Box inclusive all set 2
related accessories

BP-1
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Unit Price1 Total Price1 Taxes and Duties

Item Description Country of origin2 Unit Quantity


Foreign Currency [xxx] Foreign Currency [xxx]
Local Currency [XXX]
CIP CIP

1 2 3* 4 5 6 7= 5 x 6 8

Schedule No. 1 Plant and Mandatory Spare Parts Supplied from Abroad

1.3
Connection of Underground and Overhead
Transmission Lines
Steel structure for gantry column and beam including
1.3.1 nut&bolts at O/H to U/G Transition compound arrangement Lot 1

Equipment Support Structures at O/H to U/G


1.3.2 Transition compound arrangement and support Lot 1
structure for CSE at Anandabazar substation

Material(ACSR Conductor, Clamp, Connector etc.)


1.3.3
for AIS Connection from slack span conductor to Lot 1
Cable sealing end and LA as per drawings
PGCB/400KV/OH-UG/Anow-Ananda/TL

1.3.4 230kV Lightenning Arrester set 6


1.4 Spares
Outdoor Cable sealing end terminations complete
1.4.1 kit with filling compound for above cable set 2
mentioned in item 1.1.1
GIS Cable sealing end terminations complete kit
1.4.2 with filling compound for above cable mentioned in set 0
item 1.1.1(Male Part)

1.4.3
Cable joint (straight through suitable for above set 3
cable mentioned in item 1.1.1)

Sub-total Columns 7 to be carried forward to Schedule No. 5 - Grand Summary

2 Scope-2: Rampur-Anandabazar 230 kV double circuit underground cable line (XLPE 2000 mm²):

2.1
230kV XLPE Underground Power Cable with
Necessary Accessories

BP-2
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Unit Price1 Total Price1 Taxes and Duties

Item Description Country of origin2 Unit Quantity


Foreign Currency [xxx] Foreign Currency [xxx]
Local Currency [XXX]
CIP CIP

1 2 3* 4 5 6 7= 5 x 6 8

Schedule No. 1 Plant and Mandatory Spare Parts Supplied from Abroad

230kV single core 2000sqmm copper conductor,


2.1.1 XLPE insulated, corrugated Al sheathed & MDPE km 22.62
outer sheathed cable
Straight Through Joint suitable for above cable
2.1.2 mentioned in item 2.1.1 including all related Set 18
accessories

2.1.3
Insulated Joint suitable for above cable mentioned Set 24
in item 2.1.1 including all related accessories

Outdoor Cable Sealing End for above cable


2.1.4 mentioned in item 2.1.1 including all related Set 0
accessories(Long rod type polymar)

2.1.5
GIS Cable Sealing End for above cable mentioned Set 12
in item 2.1.1 including all related accessories

2.1.6
Link Box for cross bonding including all related Set 8
accessories

2.1.7
Link Box for earthing at straight through joint Set 6
including all related accessories

2.1.8
Link Box for earthing at cable sealing end including Set 4
all related accessories

2.2
Fibre Optic Cable inclusive of joint boxes including
all related accessories
Fibre Optic Cable including of joint boxes and all
2.2.2 km 3.770
related accessories

2.2.3
Fibre Optic Cable Termination Box inclusive all set 4
related accessories
2.3 Spares
Outdoor Cable sealing end terminations complete
2.3.1 kit with filling compound for above cable set 0
mentioned in item 2.1.1
GIS Cable sealing end terminations complete kit
2.3.2 with filling compound for above cable mentioned in set 3
item 2.1.1(Male Part only)

BP-3
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Unit Price1 Total Price1 Taxes and Duties

Item Description Country of origin2 Unit Quantity


Foreign Currency [xxx] Foreign Currency [xxx]
Local Currency [XXX]
CIP CIP

1 2 3* 4 5 6 7= 5 x 6 8

Schedule No. 1 Plant and Mandatory Spare Parts Supplied from Abroad

Cable joint (straight through suitable for above


2.3.3 set 0
cable mentioned in item 2.1.1)

Sub-total Columns 7 to be carried forward to Schedule No. 5 - Grand Summary

3 Scope-3: Anandabazar-Khulshi 230 kV double circuit underground cable line (XLPE 2000 mm²):

3.1
230kV XLPE Underground Power Cable with
Necessary Accessories
230kV single core 2000sqmm copper conductor,
3.1.1 XLPE insulated, corrugated Al sheathed & MDPE km 36.60
outer sheathed cable
Straight Through Joint suitable for above cable
3.1.2 mentioned in item 3.1.1 including all related Set 30
accessories

3.1.3
Insulated Joint suitable for above cable mentioned Set 36
in item 3.1.1 including all related accessories

AIS Cable Sealing End for above cable mentioned


3.1.4 in item 3.1.1 including all related accessories(Long Set 0
rod type polymar)

3.1.5
GIS Cable Sealing End for above cable mentioned Set 12
in item 3.1.1 including all related accessories

3.1.6
Link Box for cross bonding including all related Set 12
accessories

3.1.7
Link Box for earthing at straight through joint Set 10
including all related accessories
Link Box for earthing at cable sealing end including
3.1.8 Set 4
all related accessories

3.2
Fibre Optic Cable inclusive of joint boxes including
all related accessories

BP-4
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Unit Price1 Total Price1 Taxes and Duties

Item Description Country of origin2 Unit Quantity


Foreign Currency [xxx] Foreign Currency [xxx]
Local Currency [XXX]
CIP CIP

1 2 3* 4 5 6 7= 5 x 6 8

Schedule No. 1 Plant and Mandatory Spare Parts Supplied from Abroad

3.2.2
Fibre Optic Cable including of joint boxes and all km 6.10
related accessories

3.2.3
Fibre Optic Cable Termination Box inclusive all set 2
related accessories
3.3 Spares
Outdoor Cable sealing end terminations complete
3.3.1 kit with filling compound for above cable set 0
mentioned in item 3.1.1
GIS Cable sealing end terminations complete kit
3.3.2 with filling compound for above cable mentioned in set 3
item 3.1.1(Male Part)

3.3.3
Cable joint (straight through suitable for above set 3
cable mentioned in item 3.1.1)

Sub-total Columns 7 to be carried forward to Schedule No. 5 - Grand Summary

4 Scope-4: Madunaghat-Khulshi 230 kV double circuit underground cable line (XLPE 2000 mm²):

4.1
230kV XLPE Underground Power Cable with
Necessary Accessories
230kV single core 2000sqmm copper conductor,
4.1.1 XLPE insulated, corrugated Al sheathed & MDPE km 87.48
outer sheathed cable
Straight Through Joint suitable for above cable
4.1.2 mentioned in item 4.1.1 including all related Set 48
accessories

4.1.3
Insulated Joint suitable for above cable mentioned Set 120
in item 4.1.1 including all related accessories

4.1.5
GIS Cable Sealing End for above cable mentioned Set 12
in item 4.1.1 including all related accessories

4.1.6
Link Box for cross bonding including all related Set 40
accessories

BP-5
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Unit Price1 Total Price1 Taxes and Duties

Item Description Country of origin2 Unit Quantity


Foreign Currency [xxx] Foreign Currency [xxx]
Local Currency [XXX]
CIP CIP

1 2 3* 4 5 6 7= 5 x 6 8

Schedule No. 1 Plant and Mandatory Spare Parts Supplied from Abroad

4.1.7
Link Box for earthing at straight through joint Set 16
including all related accessories

4.1.8
Link Box for earthing at cable sealing end including Set 4
all related accessories

4.2
Fibre Optic Cable inclusive of joint boxes including
all related accessories

4.2.2
Fibre Optic Cable including of joint boxes and all km 14.58
related accessories
Fibre Optic Cable Termination Box inclusive all
4.2.3 set 2
related accessories
4.3 Spares
Outdoor Cable sealing end terminations complete
4.3.1 kit with filling compound for above cable set 3
mentioned in item 4.1.1
GIS Cable sealing end terminations complete kit
4.3.2 with filling compound for above cable mentioned in set 3
item 4.1.1(Male Part only)

4.3.3
Cable joint (straight through suitable for above set 3
cable mentioned in item 4.1.1)

Sub-total Columns 7 to be carried forward to Schedule No. 5 - Grand Summary

Total Columns 7 to be carried forward to Schedule No. 5 - Grand Summary

Name of Bidder

Signature of Bidder

1  
     Specify currencies in accordance with ITB 19.1 of the BDS. Create additional columns for up to a maximum of two foreign currencies, if so required.

      Bidders shall enter a code representing the country of origin of all imported plant and equipment.

BP-6
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Unit Price1 Total Price1 Taxes and Duties

Item Description Country of origin2 Unit Quantity


Foreign Currency [xxx] Foreign Currency [xxx]
Local Currency [XXX]
CIP CIP

1 2 3* 4 5 6 7= 5 x 6 8

Schedule No. 1 Plant and Mandatory Spare Parts Supplied from Abroad

Country of Origin Declaration Form


Item Description Code Country

BP-7
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Schedule No. 2 Plant and Mandatory Spare Parts Supplied from Within the Employer's Country

Local Currency in BDT Foreign Currency in (xxx) Sales and Other Taxes

Item Description Country of origin


2
Unit Quantity
Unit EXW Total EXW Unit EXW Total EXW
Local Currency
Price1 Price Price1 Price

1 2 3* 4 5 6 7=5X6 8 9= 5X8 10

Schedule No. 2 Plant and Mandatory Spare Parts Supplied from Within the Employer's Country

Scope-1: Anowara-Ananda bazar (New Mooring) 400 kV double circuit Underground cable line portion (2000 mm² XLPE):
1

1.1
400kV XLPE Underground Power Cable with
Necessary Accessories
400kV single core 2000sqmm copper conductor,
1.1.1 XLPE insulated, corrugated Al sheathed & MDPE km 31.518
outer sheathed cable

Straight Through Joint suitable for above cable


1.1.2 mentioned in item 1.1.1 including all related Set 12
accessories

1.1.3
Insulated Joint suitable for above cable mentioned Set 72
in item 1.1.1 including all related accessories

Outdoor Cable Sealing End for above cable


1.1.4 mentioned in item 1.1.1 including all related Set 6
accessories(Long rod type polymar)

230kV Outdoor Cable Sealing End for above cable


1.1.5 mentioned in item 1.1.1 including all related Set 6
accessories (Long rod type polymar)

Link Box for cross bonding including all related


1.1.6 Set 24
accessories

1.1.7
Link Box for earthing at straight through joint Set 4
including all related accessories

1.1.8
Link Box for earthing at cable sealing end including Set 8
all related accessories

1.2
Fibre Optic Cable inclusive of joint boxes including
all related accessories

1.2.1
Fibre Optic Cable including of joint boxes and all km 5.253
related accessories

BP-7
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Local Currency in BDT Foreign Currency in (xxx) Sales and Other Taxes

Item Description Country of origin2 Unit Quantity


Unit EXW Total EXW Unit EXW Total EXW
Local Currency
Price1 Price Price1 Price

1 2 3* 4 5 6 7=5X6 8 9= 5X8 10

Schedule No. 2 Plant and Mandatory Spare Parts Supplied from Within the Employer's Country

1.2.2
Fibre Optic Cable Termination Box inclusive all set 2
related accessories

1.3
Connection of Underground and Overhead
Transmission Lines
Gantry Column with signle beam including nut&bolts at O/H to
1.3.1 Lot 1
U/G Transition compound arrangement
Equipment Support Structures at O/H to U/G
1.3.2 Transition compound arrangement and support Lot 1
structure for CSE at Anandabazar substation

Material(ACSR Conductor, Clamp, Connector etc.)


1.3.3
for AIS Connection from slack span conductor to Lot 1
Cable sealing end and LA as per drawings
PGCB/400KV/OH-UG/Anow-Ananda/TL

1.3.4 230kV Lightenning Arrester set 6

1.4 Spares

Outdoor Cable sealing end terminations complete


1.4.1 kit with filling compound for above cable set 2
mentioned in item 1.1.1

GIS Cable sealing end terminations complete kit


1.4.2 with filling compound for above cable mentioned in set 0
item 1.1.1(Male Part)

1.4.3
Cable joint (straight through suitable for above set 3
cable mentioned in item 1.1.1)

Sub-total Columns 7 & 9 to be carried forward to Schedule No. 5 - Grand Summary

2 Scope-2: Rampur-Anandabazar 230 kV double circuit underground cable line (XLPE 2000 mm²):

2.1
230kV XLPE Underground Power Cable with
Necessary Accessories

BP-8
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Local Currency in BDT Foreign Currency in (xxx) Sales and Other Taxes

Item Description Country of origin2 Unit Quantity


Unit EXW Total EXW Unit EXW Total EXW
Local Currency
Price1 Price Price1 Price

1 2 3* 4 5 6 7=5X6 8 9= 5X8 10

Schedule No. 2 Plant and Mandatory Spare Parts Supplied from Within the Employer's Country

230kV single core 2000sqmm copper conductor,


2.1.1 XLPE insulated, corrugated Al sheathed & MDPE km 22.62
outer sheathed cable
Straight Through Joint suitable for above cable
2.1.2 mentioned in item 2.1.1 including all related Set 18
accessories

2.1.3
Insulated Joint suitable for above cable mentioned Set 24
in item 2.1.1 including all related accessories

Outdoor Cable Sealing End for above cable


2.1.4 mentioned in item 2.1.1 including all related Set 0
accessories(Long rod type polymar)

2.1.5
GIS Cable Sealing End for above cable mentioned Set 12
in item 2.1.1 including all related accessories

2.1.6
Link Box for cross bonding including all related Set 8
accessories
2.1.7
Link Box for earthing at straight through joint Set 6
including all related accessories
Link Box for earthing at cable sealing end including
2.1.8 Set 4
all related accessories

2.2
Fibre Optic Cable inclusive of joint boxes including
all related accessories

2.2.2
Fibre Optic Cable including of joint boxes and all km 3.770
related accessories

2.2.3
Fibre Optic Cable Termination Box inclusive all set 4
related accessories
2.3 Spares

Outdoor Cable sealing end terminations complete


2.3.1 kit with filling compound for above cable set 0
mentioned in item 2.1.1

BP-9
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Local Currency in BDT Foreign Currency in (xxx) Sales and Other Taxes

Item Description Country of origin2 Unit Quantity


Unit EXW Total EXW Unit EXW Total EXW
Local Currency
Price1 Price Price1 Price

1 2 3* 4 5 6 7=5X6 8 9= 5X8 10

Schedule No. 2 Plant and Mandatory Spare Parts Supplied from Within the Employer's Country

GIS Cable sealing end terminations complete kit


2.3.2 with filling compound for above cable mentioned in set 3
item 2.1.1(Male Part)

2.3.3
Cable joint (straight through suitable for above set 0
cable mentioned in item 2.1.1)
Sub-total Columns 7 & 9 to be carried forward to Schedule No. 5 - Grand Summary

3 Scope-3: Anandabazar-Khulshi 230 kV double circuit underground cable line (XLPE 2000 mm²):

3.1
230kV XLPE Underground Power Cable with
Necessary Accessories

230kV single core 2000sqmm copper conductor,


3.1.1 XLPE insulated, corrugated Al sheathed & MDPE km 36.60
outer sheathed cable
Straight Through Joint suitable for above cable
3.1.2 mentioned in item 3.1.1 including all related Set 30
accessories

3.1.3
Insulated Joint suitable for above cable mentioned Set 36
in item 3.1.1 including all related accessories

AIS Cable Sealing End for above cable mentioned


3.1.4 in item 3.1.1 including all related accessories(Long Set 0
rod type polymar)

3.1.5
GIS Cable Sealing End for above cable mentioned Set 12
in item 3.1.1 including all related accessories

3.1.6
Link Box for cross bonding including all related Set 12
accessories
3.1.7
Link Box for earthing at straight through joint Set 10
including all related accessories
3.1.8
Link Box for earthing at cable sealing end including Set 4
all related accessories

BP-10
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Local Currency in BDT Foreign Currency in (xxx) Sales and Other Taxes

Item Description Country of origin2 Unit Quantity


Unit EXW Total EXW Unit EXW Total EXW
Local Currency
Price1 Price Price1 Price

1 2 3* 4 5 6 7=5X6 8 9= 5X8 10

Schedule No. 2 Plant and Mandatory Spare Parts Supplied from Within the Employer's Country

3.2
Fibre Optic Cable inclusive of joint boxes including
all related accessories

3.2.2
Fibre Optic Cable including of joint boxes and all km 6.10
related accessories

3.2.3
Fibre Optic Cable Termination Box inclusive all set 2
related accessories

3.3 Spares

Outdoor Cable sealing end terminations complete


3.3.1 kit with filling compound for above cable set 0
mentioned in item 3.1.1

GIS Cable sealing end terminations complete kit


3.3.2 with filling compound for above cable mentioned in set 3
item 3.1.1(Male Part)

3.3.3
Cable joint (straight through suitable for above set 3
cable mentioned in item 3.1.1)
Sub-total Columns 7 & 9 to be carried forward to Schedule No. 5 - Grand Summary

4 Scope-4: Madunaghat-Khulshi 230 kV double circuit underground cable line (XLPE 2000 mm²):

4.1
230kV XLPE Underground Power Cable with
Necessary Accessories

230kV single core 2000sqmm copper conductor,


4.1.1 XLPE insulated, corrugated Al sheathed & MDPE km 87.48
outer sheathed cable
Straight Through Joint suitable for above cable
4.1.2 mentioned in item 4.1.1 including all related Set 48
accessories

4.1.3
Insulated Joint suitable for above cable mentioned Set 120
in item 4.1.1 including all related accessories

BP-11
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Local Currency in BDT Foreign Currency in (xxx) Sales and Other Taxes

Item Description Country of origin2 Unit Quantity


Unit EXW Total EXW Unit EXW Total EXW
Local Currency
Price1 Price Price1 Price

1 2 3* 4 5 6 7=5X6 8 9= 5X8 10

Schedule No. 2 Plant and Mandatory Spare Parts Supplied from Within the Employer's Country

GIS Cable Sealing End for above cable mentioned


4.1.5 Set 12
in item 4.1.1 including all related accessories

4.1.6
Link Box for cross bonding including all related Set 40
accessories

4.1.7
Link Box for earthing at straight through joint Set 16
including all related accessories

4.1.8
Link Box for earthing at cable sealing end including Set 4
all related accessories
Fibre Optic Cable inclusive of joint boxes including
4.2
all related accessories

4.2.2
Fibre Optic Cable including of joint boxes and all km 14.58
related accessories

4.2.3
Fibre Optic Cable Termination Box inclusive all set 2
related accessories
4.3 Spares
Outdoor Cable sealing end terminations complete
4.3.1 kit with filling compound for above cable set 0
mentioned in item 4.1.1
GIS Cable sealing end terminations complete kit
4.3.2 with filling compound for above cable mentioned in set 3
item 4.1.1(Male Part only)
Cable joint (straight through suitable for above
4.3.3 set 3
cable mentioned in item 4.1.1)
Sub-total Columns 7 & 9 to be carried forward to Schedule No. 5 - Grand Summary

Total Columns 7 & 9 to be carried forward to Schedule No. 5 - Grand Summary

Name of Bidder

Signature of Bidder

BP-12
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Local Currency in BDT Foreign Currency in (xxx) Sales and Other Taxes

Item Description Country of origin2 Unit Quantity


Unit EXW Total EXW Unit EXW Total EXW
Local Currency
Price1 Price Price1 Price

1 2 3* 4 5 6 7=5X6 8 9= 5X8 10

Schedule No. 2 Plant and Mandatory Spare Parts Supplied from Within the Employer's Country

1       Specify currencies in accordance with ITB 19.1 of the BDS. Create additional columns for up to a maximum of two foreign currencies, if so required.
2       Bidders shall enter a code representing the country of origin of all imported plant and equipment.

BP-13
Design, Supply, Installation, Testing & Commissioning of 400kV & 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Schedule No. 3 Design Services

Unit Price1 Total Price1

Item Description Unit Quantity


Local
Foreign Currency Local Currency Foreign Currency
Currency
[XXX] [BDT] [XXX]
[BDT]

1 2 3 4 5 6 7=4X5 8= 4 x 6
Schedule No. 3 Design Services
1 Scope-1: Anowara-Ananda bazar (New Mooring) 400 kV double circuit Underground cable line portion (2000 mm² XLPE):

1.1 Design serices for scope-1 Lump sum 1

2 Scope-2: Rampur-Khulshi 230 kV double circuit underground cable line (XLPE 2000 mm²):

2.1 Design serices for scope-2 Lump sum 1

3 Scope-3: Anandabazar-Khulshi 230 kV double circuit underground cable line (XLPE 2000 mm²):

3.1 Design serices for scope-3 Lump sum 1

4 Scope-4: Madunaghat-Khulshi 230 kV double circuit underground cable line (XLPE 2000 mm²):

4,1 Design serices for scope-4 Lump sum 1

5 Inspection Cost

5.1 Costs and Expenses related to third party witness Lump sum 1

5.2 Costs and Expenses related to test witness3(Provisional Sum) Lump sum 1 $50,000.00 $50,000.00

Total
Columns 7
& 8 to be
carried
forward to
Schedule Name of Bidder
No. 5 -
Grand
Summary Signature of Bidder
1
. Specify currencies in accordance with ITB 19.1 of the BDS.
3
These costs are fixed ceiling and will be included in total price. But the payment shall be at actual upon submission of relevant documents.

BP-13
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Schedule No. 4 Installation and Other Services

Unit Price1 Total Price1


Item Description Unit Quantity
Local
Foreign Currency Foreign Currency
Local Currency [BDT] Currency
[xxx] [xxx]
[BDT]
1 2 3 4 5 6 7=4x5 8=4x6
Schedule No. 4 Installation and Other Services
Scope-1: Anowara-Ananda bazar (New Mooring) 400 kV double circuit Underground cable line portion (2000 mm² XLPE):
1

1.1 Installation and Erection of 400kV XLPE cables and Fibre Optic Cable Circuit
1.1.1
Laying of cables (double circuit of single core cables and one fibre optic cable) as per the per km 5.253
requirements of the technical specification.
Excavation of cable trench as per the requirements of the technical specification (double
1.1,2 per km 4.663
circuit of single core cables and one fibre optic cable)
Excavation of cable trench for road crossing using cable ducts for individual cables as
1.1.3 per the requirements of the technical specification and laying of cables (double circuit of per km 0.140
single core cables and one fibre optic cable)

Making arrangement /installation of cable trench for Road crossing using cable ducts for
individual cables as per the requirements of the technical specification (double circuit of
single core cables and one fiber optic cable) through Horizontal Directional Drilling (HDD)
1.1.4 method or any other means. One spare cable duct is to be provided in the Road crossing per km 0.10
cable trench. Total cost of making/installing all arrangements including supply of
materials/accessories required for the Road crossing arrangement/installation are
included in this item.

Making arrangement /installation of cable trench for Rail Line crossing using cable ducts
for individual cables as per the requirements of the technical specification (double circuit
of single core cables and one fiber optic cable) through Horizontal Directional Drilling
1.1.5 (HDD) method or any other means. One spare cable duct is to be provided in the Rail Lot 1.00
Line crossing cable trench. Total cost of making/installing all arrangements including
supply of materials/accessories required for the Rail Line crossing
arrangement/installation are included in this item.

Making arrangement /installation including pile foundations or any other type foundations
as required for the crossing of the canal/khal (double circuit of single core cables and
one fiber optic cable) into/within the canal/khal crossing arrangement/installation through
1.1.6
cable bridge. Total cost of making/installing all arrangements including supply of steel
works and other materials/accessories required for the above canal/khal crossing
arrangement/installation are included in this item.

1.1.6.1 Up to 20 meter width per km 0.05


1.1.6.2 Above 20meter width per km 0.05

BP-14
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Unit Price1 Total Price1


Item Description Unit Quantity
Local
Foreign Currency Foreign Currency
Local Currency [BDT] Currency
[xxx] [xxx]
[BDT]
1 2 3 4 5 6 7=4x5 8=4x6
Schedule No. 4 Installation and Other Services

Making arrangement /installation for the crossing of the canal/khal using cable ducts for
individual cables as per the requirements of the technical specification (double circuit of
1.1.7
single core cables and one fiber optic cable) through Horizontal Directional Drilling (HDD) per km 0.25
method or any other means into/within the canal/khal. Total cost of making/installing all
arrangements including supply of materials/accessories required for the above canal/khal
crossing arrangement/installation are included in this item.

1.1.8
Excavation of cable joint bay as per the requirements of the technical specification Set 14
including all related works

Installation and jointing of 400kV insulated/straight through joints as per the requirements
1.1.9 of the technical specification including installation of link box and associated earthing Set 84
works with provision for link pit as per the requirements and all related works

Installation and terminating of 400kV AIS Cable sealing end termination as per the
1.1.10 requirements of the technical specification including installation of link box and Set 6
associated earthing works as per the requirements and all related works
Installation and terminating of 230kV outdoor cable sealing end termination as per the
1.1.11 requirements of the technical specification including installation of link box and Set 6
associated earthing works as per the requirements and all related works
1.1.12 Installation and jointing of Fibre optic cable joint inclusive all related accessories Lot 1
Installation and terminating of Fibre optic cable terminal box inclusive all related
1.1.13 Set 2
accessories
1.1.14 Installation of Gantry column and beam at O/H to U/G Transition compound. Lot 1
1.1.15 Installation of 230kV Lighting Arrester including earthing & all related accessories Set 6
1.2 Route Survey & Clearance
Check Survey in accordance with the requirements of the technical specification, incl. full
1.2.1 ground survey with change of route, if any, preparation and submission of route maps, per km 5.253
SIMM document, etc.
Route clearance in accordance with requirements of the technical specification including
1.2.2 Lump sum 1.00 2,801,000.00 2,801,000.00
payment of damage compensation
1.3 Testing and Commisioning

1.3.1
Testing and commissioning of 400kV cable circuit and fibre optic cable with provision of Lot 1
all test equipment as per the requirements of technical specification
1.4 MISCELLANEOUS

1.4.1
AIS termination/connection from slack span conductor to Cable sealing end and LA as Lot 1
per drawings PGCB/400KV/OH-UG/Anow-Ananda/TL

BP-15
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Unit Price1 Total Price1


Item Description Unit Quantity
Local
Foreign Currency Foreign Currency
Local Currency [BDT] Currency
[xxx] [xxx]
[BDT]
1 2 3 4 5 6 7=4x5 8=4x6
Schedule No. 4 Installation and Other Services

Complete civil works including but not limited to surface finishing of termination area,
1.4.2 gravel laying, earthing, foundation (Gantry, CSE and LA), fencing, drainage etc as Lot 1
indicated on tender drawings PGCB/400KV/OH-UG/Anow-Ananda/TL

1.4.3
Complete civil works including foundation for outdoor cable sealing end at Anandabar Lot 1
substation.

Sub-total Columns 7 & 8 to be carried forward to Schedule No. 5 - Grand Summary

Scope-2: Rampur-Anandabazar 230 kV double circuit underground cable line (XLPE 2000 mm²):
2

2.1 Installation and Erection of 230kV XLPE cables and Fibre Optic Cable Circuit
Laying of cables (double circuit of single core cables and one fibre optic cable) as per the
2.1.1 per km 3.770
requirements of the technical specification.
Excavation of cable trench as per the requirements of the technical specification (double
2.1.2 per km 3.510
circuit of single core cables and one fibre optic cable)
Excavation of cable trench for road crossing using cable ducts for individual cables as
2.1.3 per the requirements of the technical specification and laying of cables (double circuit of per km 0.100
single core cables and one fibre optic cable)

Making arrangement /installation of cable trench for Road crossing using cable ducts for
individual cables as per the requirements of the technical specification (double circuit of
single core cables and one fiber optic cable) through Horizontal Directional Drilling (HDD)
2.1.4 method or any other means. One spare cable duct is to be provided in the Road crossing per km 0.04
cable trench. Total cost of making/installing all arrangements including supply of
materials/accessories required for the Road crossing arrangement/installation are
included in this item.

Making arrangement /installation of cable trench for Rail Line crossing using cable ducts
for individual cables as per the requirements of the technical specification (double circuit
of single core cables and one fiber optic cable) through Horizontal Directional Drilling
2.1.5 (HDD) method or any other means. One spare cable duct is to be provided in the Rail Lot 1.00
Line crossing cable trench. Total cost of making/installing all arrangements including
supply of materials/accessories required for the Rail Line crossing
arrangement/installation are included in this item.

BP-16
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Unit Price1 Total Price1


Item Description Unit Quantity
Local
Foreign Currency Foreign Currency
Local Currency [BDT] Currency
[xxx] [xxx]
[BDT]
1 2 3 4 5 6 7=4x5 8=4x6
Schedule No. 4 Installation and Other Services

Making arrangement /installation including pile foundations or any other type foundations
as required for the crossing of the canal/khal (double circuit of single core cables and
2.1.6
one fiber optic cable) into/within the canal/khal crossing arrangement/installation through
cable bridge. Total cost of making/installing all arrangements including supply of steel
works and other materials/accessories required for the above canal/khal crossing
arrangement/installation are included in this item.

2.1.6.1 Up to 20 meter width per km 0.04


2,1.6.2 Above 20meter width per km 0.04

Making arrangement /installation for the crossing of the canal/khal using cable ducts for
individual cables as per the requirements of the technical specification (double circuit of
single core cables and one fiber optic cable) through Horizontal Directional Drilling (HDD)
2.1.7 per km 0.040
method or any other means into/within the canal/khal. Total cost of making/installing all
arrangements including supply of materials/accessories required for the above canal/khal
crossing arrangement/installation are included in this item.

Excavation of cable joint bay as per the requirements of the technical specification
2.1.8 Set 7
including all related works

Installation and jointing of 230kV insulated/straight through joints as per the requirements
2.1.9 of the technical specification including installation of link box and associated earthing Set 42
works with provision for link pit as per the requirements and all related works

Installation and terminating of 230kV GIS sealing end termination as per the
2.1.10 requirements of the technical specification including installation of link box and Set 12
associated earthing works as per the requirements and all related works
2.1.11 Installation and jointing of Fibre optic cable joint inclusive all related accessories Lot 1

2.1.12
Installation and terminating of Fibre optic cable terminal box inclusive all related Set 2
accessories
2.2 Route Survey & Clearance

Check Survey in accordance with the requirements of the technical specification, incl. full
2.2.1 ground survey with change of route, if any, preparation and submission of route maps, per km 3.770
SIMM document, etc.

Route clearance in accordance with requirements of the technical specification including


2.2.2 Lump sum 1.00 1,271,000.00 1,271,000.00
payment of damage compensation
2.3 Testing and Commisioning

BP-17
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Unit Price1 Total Price1


Item Description Unit Quantity
Local
Foreign Currency Foreign Currency
Local Currency [BDT] Currency
[xxx] [xxx]
[BDT]
1 2 3 4 5 6 7=4x5 8=4x6
Schedule No. 4 Installation and Other Services
Testing and commissioning of 230kV cable circuit and fibre optic cable with provision of
2.3.1 Lot 1
all test equipment as per the requirements of technical specification
2.4 MISCELLANEOUS
2.4.1 Miscellaneous works at Anandabazar(New mooring) and Rampur GIS S/S: Lot 1

Sub-total Columns 7 & 8 to be carried forward to Schedule No. 5 - Grand Summary

Scope-3: Anandabazar-Khulshi 230 kV double circuit underground cable line (XLPE 2000 mm²):
3

3.1 Installation and Erection of 230kV XLPE cables and Fibre Optic Cable Circuit
3.1.1
Laying of cables (double circuit of single core cables and one fibre optic cable) as per the per km 6.10
requirements of the technical specification.
Excavation of cable trench as per the requirements of the technical specification (double
3.1.2 5.40
circuit of single core cables and one fibre optic cable)
Excavation of cable trench for road crossing using cable ducts for individual cables as
3.1.3 per the requirements of the technical specification and laying of cables (double circuit of per km 0.370
single core cables and one fibre optic cable)

Making arrangement /installation of cable trench for Road crossing using cable ducts for
individual cables as per the requirements of the technical specification (double circuit of
single core cables and one fiber optic cable) through Horizontal Directional Drilling (HDD)
3.1.4 method or any other means. One spare cable duct is to be provided in the Road crossing per km 0.125
cable trench. Total cost of making/installing all arrangements including supply of
materials/accessories required for the Road crossing arrangement/installation are
included in this item.

Making arrangement /installation of cable trench for Rail Line crossing using cable ducts
for individual cables as per the requirements of the technical specification (double circuit
of single core cables and one fiber optic cable) through Horizontal Directional Drilling
3.1.5 (HDD) method or any other means. One spare cable duct is to be provided in the Rail Lot 1.00
Line crossing cable trench. Total cost of making/installing all arrangements including
supply of materials/accessories required for the Rail Line crossing
arrangement/installation are included in this item.

Making arrangement /installation including pile foundations or any other type foundations
as required for the crossing of the canal/khal (double circuit of single core cables and
one fiber optic cable) into/within the canal/khal crossing arrangement/installation through
3.1.6
cable bridge. Total cost of making/installing all arrangements including supply of steel
works and other materials/accessories required for the above canal/khal crossing
arrangement/installation are included in this item.

BP-18
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Unit Price1 Total Price1


Item Description Unit Quantity
Local
Foreign Currency Foreign Currency
Local Currency [BDT] Currency
[xxx] [xxx]
[BDT]
1 2 3 4 5 6 7=4x5 8=4x6
Schedule No. 4 Installation and Other Services
3.1.6.1 Up to 20 meter width per km 0.02
3.1.6.2 Above 20meter width per km 0.03

Making arrangement /installation for the crossing of the canal/khal using cable ducts for
individual cables as per the requirements of the technical specification (double circuit of
3.1.7
single core cables and one fiber optic cable) through Horizontal Directional Drilling (HDD) per km 0.03
method or any other means into/within the canal/khal. Total cost of making/installing all
arrangements including supply of materials/accessories required for the above canal/khal
crossing arrangement/installation are included in this item.

Excavation of cable joint bay as per the requirements of the technical specification
3.1.8 Set 11
including all related works

Installation and jointing of 230kV insulated/straight through joints as per the requirements
3.1.9 of the technical specification including installation of link box and associated earthing Set 66
works with provision for link pit as per the requirements and all related works

Installation and terminating of 230kV GIS sealing end termination as per the
3.1.10 requirements of the technical specification including installation of link box and Set 12
associated earthing works as per the requirements and all related works
3.1.11 Installation and jointing of Fibre optic cable joint inclusive all related accessories Lot 1

3.1.12
Installation and terminating of Fibre optic cable terminal box inclusive all related Set 2
accessories
3.2 Route Survey & Clearance
Check Survey in accordance with the requirements of the technical specification, incl. full
3.2.1 ground survey with change of route, if any, preparation and submission of route maps, per km 6.10
SIMM document, etc.
Route clearance in accordance with requirements of the technical specification including
3.2.2 Lump sum 1.00 2,057,000.00 2,057,000.00
payment of damage compensation
3.3 Testing and Commisioning
Testing and commissioning of 230kV cable circuit and fibre optic cable with provision of
3.3.1 Lot 1
all test equipment as per the requirements of technical specification
3.4 MISCELLANEOUS
3.4.1 Miscellaneous works at Khulshi and Anandabazar GIS S/S: Lot 1

Sub-total Columns 7 & 8 to be carried forward to Schedule No. 5 - Grand Summary

Scope-4: Khulshi-Madhunaghat 230 kV double circuit underground cable line (XLPE 2000 mm²):
4

BP-19
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Unit Price1 Total Price1


Item Description Unit Quantity
Local
Foreign Currency Foreign Currency
Local Currency [BDT] Currency
[xxx] [xxx]
[BDT]
1 2 3 4 5 6 7=4x5 8=4x6
Schedule No. 4 Installation and Other Services
4.1 Installation and Erection of 230kV XLPE cables and Fibre Optic Cable Circuit
Laying of cables (double circuit of single core cables and one fibre optic cable) as per the
4.1.1 per km 14.58
requirements of the technical specification.
Excavation of cable trench as per the requirements of the technical specification (double
4.1.2 13.69
circuit of single core cables and one fibre optic cable)
Excavation of cable trench for road crossing using cable ducts for individual cables as
4.1.3 per the requirements of the technical specification and laying of cables (double circuit of per km 0.50
single core cables and one fibre optic cable)

Making arrangement /installation of cable trench for Road crossing using cable ducts for
individual cables as per the requirements of the technical specification (double circuit of
single core cables and one fiber optic cable) through Horizontal Directional Drilling (HDD)
4.1.4 method or any other means. One spare cable duct is to be provided in the Road crossing per km 0.15
cable trench. Total cost of making/installing all arrangements including supply of
materials/accessories required for the Road crossing arrangement/installation are
included in this item.

Making arrangement /installation of cable trench for Rail Line crossing using cable ducts
for individual cables as per the requirements of the technical specification (double circuit
of single core cables and one fiber optic cable) through Horizontal Directional Drilling
4.1.5 (HDD) method or any other means. One spare cable duct is to be provided in the Rail Lot 1.00
Line crossing cable trench. Total cost of making/installing all arrangements including
supply of materials/accessories required for the Rail Line crossing
arrangement/installation are included in this item.

Making arrangement /installation including pile foundations or any other type foundations
as required for the crossing of the canal/khal (double circuit of single core cables and
one fiber optic cable) into/within the canal/khal crossing arrangement/installation through
4.1.6
cable bridge. Total cost of making/installing all arrangements including supply of steel
works and other materials/accessories required for the above canal/khal crossing
arrangement/installation are included in this item.

4.1.6.1 Up to 20 meter width per km 0.060


4.1.6.2 Above 20meter width per km 0.060

Making arrangement /installation for the crossing of the canal/khal using cable ducts for
individual cables as per the requirements of the technical specification (double circuit of
4.1.7
single core cables and one fiber optic cable) through Horizontal Directional Drilling (HDD) per km 0.12
method or any other means into/within the canal/khal. Total cost of making/installing all
arrangements including supply of materials/accessories required for the above canal/khal
crossing arrangement/installation are included in this item.

BP-20
Design, Supply, Installation, Testing Commissioning of 400kV 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Unit Price1 Total Price1


Item Description Unit Quantity
Local
Foreign Currency Foreign Currency
Local Currency [BDT] Currency
[xxx] [xxx]
[BDT]
1 2 3 4 5 6 7=4x5 8=4x6
Schedule No. 4 Installation and Other Services

4.1.8
Excavation of cable joint bay as per the requirements of the technical specification Set 28
including all related works

Installation and jointing of 230kV insulated/straight through joints as per the requirements
4.1,9 of the technical specification including installation of link box and associated earthing Set 168
works with provision for link pit as per the requirements and all related works

Installation and terminating of 230kV GIS sealing end termination as per the
4.1.10 requirements of the technical specification including installation of link box and Set 12
associated earthing works as per the requirements and all related works
4.1.11 Installation and jointing of Fibre optic cable joint inclusive all related accessories Lot 1
Installation and terminating of Fibre optic cable terminal box inclusive all related
4.1.12 Set 2
accessories
4.2 Route Survey & Clearance
Check Survey in accordance with the requirements of the technical specification, incl. full
4.2.1 ground survey with change of route, if any, preparation and submission of route maps, per km 14.58
SIMM document, etc.

4.2.2
Route clearance in accordance with requirements of the technical specification including Lump sum 1.00 4,918,000.00 4,918,000.00
payment of damage compensation
4.3 Testing and Commisioning
Testing and commissioning of 230kV cable circuit and fibre optic cable with provision of
4.3.1 Lot 1
all test equipment as per the requirements of technical specification
4.4 MISCELLANEOUS
4.4.1 Miscellaneous works at Khulshi and Madhunaghat GIS S/S: Lot 1

Sub-total Columns 7 & 8 to be carried forward to Schedule No. 5 - Grand Summary


Total Columns 7 & 8 to be carried forward to Schedule No. 5 - Grand Summary

Name of Bidder
1
Specify currencies in accordance with ITB 19.1 of the BDS. Create additional columns for up to a maximum of three foreign currencies, if so required.
Signature of Bidder

BP-21
Design, Supply, Installation, Testing & Commissioning of 400kV & 230kV underground XLPE cable Transmission lines on Chattogram Area.(Package-2)

Schedule No. 5. Grand Summary


Total Price1
Item Description
Local Currency Portion [BDT] Foreign Currency Portion [xxx]
Scope-1: Anowara-Ananda bazar (New Mooring) 400 kV double circuit Underground cable line
portion (2000 mm² XLPE):

1 Schedule No. 1 Plant and Mandatory Spare Parts Supplied from Abroad

2 Schedule No. 2 Plant and Mandatory Spare Parts Supplied from Within the Employer's Country

3 Schedule No. 3 Design Services

4 Schedule No. 4 Installation and Other Services -

Sub Total

Scope-2: Rampur-Anandabazar 230 kV double circuit underground cable line (XLPE 2000 mm²):

1 Schedule No. 1 Plant and Mandatory Spare Parts Supplied from Abroad

2 Schedule No. 2 Plant and Mandatory Spare Parts Supplied from Within the Employer's Country

3 Schedule No. 3 Design Services

4 Schedule No. 4 Installation and Other Services -

Sub Total

Scope-3: Anandabazar-Khulshi 230 kV double circuit underground cable line (XLPE 2000 mm²):

BP-22
1 Schedule No. 1 Plant and Mandatory Spare Parts Supplied from Abroad

2 Schedule No. 2 Plant and Mandatory Spare Parts Supplied from Within the Employer's Country

3 Schedule No. 3 Design Services

4 Schedule No. 4 Installation and Other Services -

Sub Total

Scope-4: Madunaghat-Khulshi 230 kV double circuit underground cable line (XLPE 2000 mm²):

1 Schedule No. 1 Plant and Mandatory Spare Parts Supplied from Abroad

2 Schedule No. 2 Plant and Mandatory Spare Parts Supplied from Within the Employer's Country

3 Schedule No. 3 Design Services

4 Schedule No. 4 Installation and Other Services -

Sub Total

Inspection cost (item 5.1 +5.2) from Schedule No.3

GRAND TOTAL

Name of Bidder

Signature of Bidder

1. Specify currencies in accordance with ITB 19.1 of the BDS. Create additional columns for up to a maximum of three foreign currencies, if so required.

BP-23
6A-24

Design, Supply, Installation, Testing & Commissioning of 400kV & 230kV underground XLPE cable
Transmission lines on Chattogram Area.(Package-2)

Schedule No. 6. Recommended Spare Parts


Un
it
Pri Total Price1
ce
1
Item Description Unit Quantity
Local Foreign
Currency Currency Local Currency Foreign Currency
Portion Portion Portion [BDT] Portion [xxx]
[BDT] [xxxxx]
1 2 3 4 5 6 7=4x5 8=4x6

Name of Bidder

Signature of Bidder

1. Specify currencies in accordance with ITB 19.1 of the BDS. Create additional columns for up to
a maximum of three foreign currencies, if so required.

BP-24

You might also like