Bhakaro Chautaro Plaster
Bhakaro Chautaro Plaster
2 Punning Work
1st Circle
Externa
Trade 1 Area= 6.72 6.72 Radii=2.6m,
Internal
Radii=2.15
2nd Circle
Externa
Trade 1 Area= 6.72 6.72 Radii=2.15m,
Internal
Radii=1.7m
3rd Circle
Externa
Trade 1 Area= 6.72 6.72 Radii=1.7m,
Internal
Radii=1.25m
Total 20.15 Sq.M 409.92 8258.01717
Transportation
Transportation of Sheep Statue from
1 LS 20000 20000
Chetwan
गाउँकार्यापालिको कार्यलय
माछीखोला, गोरखा
Rate Analysis
Building Rates Fs yr 2078/79
As per DUDBC Norms
20mm thick plaster work in 1:6 cement sand mortar in ceiling all complete as per instruction of
engineer or specification.
For 100 sq.m Norm No:I1
S.No Particulars unit Quantity Rate Amount Remarks
A Manpower
1.skilled md 14.00 1425.00 19950.00
2.unskilled md 19.00 1012.50 19237.50
B Materials
cement tonne 0.570 19810.00 11291.70
sand cum 2.35 2384.00 5602.40
रं ग रोगनको काम
2 coat of white washing in all other surface except ceiling all complete.
B Materials
lime(chuna) kg 22.000 26.21 576.62
Gum(glue) kg 0.88 234.21 206.10
Tools Plants and 3% of A
C Equipments 97.54
Sub-total 4131.51
Painting of 2 coats weather coat Nepali brand paint of approved colour all complete
B Materials
weather coat(20+30)kg kg 50.000 1252.21 62610.50
फ्लोरिङ्गको काम
3 mm cement punning work
3mm thick fine cement rubbing works in specified surface as per specification or instruction of
engineer
For 10 sq.m Norm No:H20
S.No Particulars unit Quantity Rate Amount Remarks
A Manpower
1.skilled md 1.00 1425.00 1425.00
2.unskilled md 1.00 1012.50 1012.50
B Materials
cement kg 53.200 19.81 1053.89
Tools Plants and 3% of A
C Equipments 73.13
Sub-total 3564.52
2 Punning Work
1st Circle
Externa
Trade 1 Area= 6.72 6.72 Radii=2.6m,
Internal
Radii=2.15
2nd Circle
Externa
Trade 1 Area= 6.72 6.72 Radii=2.15m,
Internal
Radii=1.7m
3rd Circle
Externa
Trade 1 Area= 6.72 6.72 Radii=1.7m,
Internal
Radii=1.25m
Total 20.15 Sq.M
Transportation
Transportation of Sheep Statue from
1 LS
Chetwan