Process Parameter Value Unit

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

SUGAR MILL PARAMETER

Process Parameter Value Unit


Year built
Last Year of revitalization
Crushing season Days/year
Downtime % milling season
Crushing capacity TCD
Extraction type Mills/Difuser
Fibre in cane %
Weight of bagasse kg/TC
Bagasse moisture content %
LHV of bagasse kcal/kg
Pol in bagasse %
Steam to bagasse ratio
Boiler feed water temperature ᵒC
Live steam pressure bar(g)
Live steam temperature ᵒC
Process steam pressure Bar
Process temperature ᵒC
Steam produced tons/hr
Steam consumed in the process kg/TC
Mechanical power demand of cane preparation and kWh/t cane
juice extraction
Electric power demand of process kWh/t cane
Installed capacity of power turbines MW
Actual power generated MW
Installed capacity of PLN VA
Power purchased from the PLN grid kWh/year

Yield YTD FY2021 %


Yield FY2020 %

Man power pershift


- Production Process person
- Maintenance person
- Lab & QC person
- Warehouse/Packing person

Warehouse & Storage


- Product Warehouse
- Area m2
- Capacity Ton
- Molases Tank
- No of tank unit
- Capacity Ton
Water Resource,Treatment & Capacity
- Water from River "….............." m3/hr
- Water from Deep well m3/hr
- WTP type
Remark
SUGAR MILL SUMMARY
Unit
Year establised
The Year of last of revitalization
Total population of sugar cane by area Ha
Percentage of own sugar cane farm %

Mill Capacity TCD


2020
Crushing season Days/Year
2021
2020
Total cane crushed Ton
2021
2020
Production Yield %
2021
Specific Cost/Kg Sugar Rp/Kg
Specific steam consumption/Ton Cane kg/TC
Total
No of Manpower in crushing season Person
Mill
Product Warehouse Capacity Ton
Molases Tank Capacity Ton

Main issues
CINTA MANIS BUNGA MAYANG SRAGI RENDENG MOJO
1984 1984 1928 1840 1840
2012 2017 2015
8,185 7,709 5,594 34,312 7,345
96.46% 68.67% 0% 0% 0%

5,300 7,500 3,000 4,000 4,000


38
0 39
169,405
473,220 512,727 85,650 - 93,235
5.58
6.78 6.50 5.50
139 147

630 588 833


460

Revitalization not
complete as Revitalization not Boiler and STG issue
finished yet
planned

Boiler still not hand


over yet due to competitor
equipmwnt failure

from 2015 boiler


Location in the still not handover
middle of city
yet

Mills performance
compettitor not optimum due to
main equipment
problem
TASIK MADU Remark
1871

2,415
0%

3,000

10

10,000

600
450

problems with
equipment due to
obsolescence

You might also like