Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

Sub-Teams Role

·     Optimizing aircraft performance and


Analysis mission model.

·     Design CAD models, drawing sheets


Design and aircraft.
·     Perform structural analysis.
·     Analyse and select the propulsion
Propulsion
system.
·     Manufacture and assemble different
components of aircraft.
Manufacturing & Testing
·     Safety Inspection and overseeing
flight tests.
·     Developing and testing deployment
Sub-System
mechanisms.
Skill Sets
·     Profound knowledge in aerodynamics.
·     Skilled in analysis tool software.
·     Understanding of various mechanisms
in aircraft.
·     Skilled in CAD software.
·     Understanding of aerodynamics and
electrical propulsion concepts.
·     Experienced with manufacturing
techniques and equipment.
·     Skilled in analysing test results using
Mission planner.
·     Understanding of avionics and
machine design.
Mode of
Model Stage
Testing

Prototype 1 Proof of Concept Analysis

Prototype 2 Basic Aircraft Fly-off

Fly-off and
Prototype 3 Payload for Mission 2
tolerance
Fly-off and
Prototype 4 Payload for Mission 3
deployment
Step-by-step
Final Aircraft Mission-ready aircraft testing as per
DBF rules
Description Deadlines

The initial prototype constitutes of the


structure of the aircraft, which can be tested October 20th, 2021
from a specific distance.

The basic aircraft can be tested in an open


area, and will contain the controls that are November 20th, 2021
essential for simply flying the aircraft.

This prototype will contain syringes. December 20th, 2021

This prototype will contain vial packages. January 30th, 2022

The final testing will be done similar to the


March 31st, 2022
way in which DBF is conducted.

You might also like