Doc.Ref. : MASB-ITP-ST Form No.

: MASB-C-ST-06

Contractor : Client :
MENUJU ASAS SDN BHD (496835-A)
Project :
PROJEK LEBUHRAYA PERSISIRAN PANTAI BARAT: KERJA-KERJA MENAIKTARAF
JALAN PERSEKUTUAN FT005(TELUK INTAN-KG LEKIR) PERAK DARUL RIDZUAN
(REKA DAN BINA)
Consultant : DRI CONSULTANT

PRE (BEFORE) CONCRETE CHECK LIST


Specification Req. - JKR/SPJ/2008-S9, Section 9

Location : RFI No.

Structure stage : Date

Drawing No. :

INSPECTION
No. Item Criteria/ Standards Remarks
Contractor Consultant

Alignment
1 Setting out/ Position
Level
Dimensions
Rigidity and bracing
Sealing againts grout leaks
Oiling
2 Formwork Joints sealant repates
Screeding lines and guides
Chamfers and splays
Surface of forms acceptable
Dry
3 Blinding Clean
Level
To required thickness
Type Bar size, spacing according
to Drawing
Tying and ngidity
4 Reinforcement Cover spacers
Cleanliness from loose rust,mud etc.
Starter bar
Lapping
Expansion Joint
5 Joints Construction Joint
Mechanical and rubber bearing
Electrical
6 Embedments Service Mechanical
Drainage
Structural
Plinth
Access
7 Safety & Housekeeping Lighting
Equipment/Tool etc.
General cleanliness

* Marks : √ if comply to specificatiom /and Drawings

Х if not comply to specificatiom /and Drawings (refer to NCR form)

Submitted by : Checked by : Verified (Consultant)

Date : Date : Date : Date :

ST/No. 06 Form
Form
RevRev.03/01.08.12