Professional Documents
Culture Documents
Standardization of Manpower With Salary
Standardization of Manpower With Salary
Manning Table Garments / Salary Schedule ( G - Shift ) Last Up Date : 10th-dECEMBER- 16( 6:20 PM) Manning Table Garments / Salary Schedule ( G - Shift )
Standardization of 13 lines on Garments (Main Floor) Minimum Salary Taka = 5300Tk with OT Standardization of 12 lines on Garments (Green Floor)
Based On Basic 10 Lines +Non Basic 3 Lines Working Hour/Day- 10 Hour Based On Basic 12 Lines +Non Basic 0 Lines
Sewing Production = 20,000 Pcs/Day x 24=4,80,000 Pcs Sewing Production = 18,000 Pcs/day x 24 = 4,32,000 Pcs
Sewing Production: 38000 pcs/Day
OT Actual Wages OT OT Actual Wages
No of OT Gross No of OT Gross
Avg. Total Hour OT Rate Avg. Total Hour Rate
SL. No Section Designation Required Amount Amount @ SL. No Section Designation Req. Amount Amount @
Salary Amount @ @ hour Man Salary Amount @ @ Man
Person @ Month With OT Person @ Month With OT
day power Amount OT day hour power Amount OT
Grand Total 763 1,146,382 5,781,832 62 7,277 1,147,640 6,929,472 - - - Grand Total 641 700,185 4,496,538 62 4,076 1,014,774 5,511,312 - - -
Summary Of Wages
Garments
Prepared By : IE Department