Professional Documents
Culture Documents
Load Charts: Serial-Nr
Load Charts: Serial-Nr
Load Charts: Serial-Nr
GMK 5100
Serial-Nr.
21.03.2000
3 058 963 en
Important note !
Original documents of
Deutsche GROVE GmbH
are marked with the serial number of
the mobile crane on the cover page.
3 058 963 en
Lifting capacity charts acc. to prEN 13000 ( DIN / ISO ) Contents list
Contents list
Remarks
General notes 1 - 1
Notes for working with swingaway jib 1 - 5
Counterweightconfiguration 1 - 7
Working Range
Working Range - Main boom 1 - 13
Working Range - Swingaway jib 1 - 17
Rigging chart
Rigging charts - Main boom 1 - 25
3 058 018 Fixed length / intermediate length 7,80 x 7,50 m 360° 31 t 1 - 26
3 058 028 Fixed length / intermediate length 7,80 x 7,50 m 360° 24 t 1 - 28
3 058 038 Fixed length / intermediate length 7,80 x 7,50 m 360° 20 t 1 - 30
3 058 048 Fixed length / intermediate length 7,80 x 7,50 m 360° 11 t 1 - 32
3 058 058 Fixed length / intermediate length 7,80 x 7,50 m 360° 7t 1 - 34
3 058 068 Fixed length 7,80 x 7,50 m 360° 4t 1 - 36
3 058 078 Fixed length 7,80 x 7,50 m 360° 1t 1 - 37
3 058 199 Fixed length 7,80 x 7,50 m 0° o.r. 31 t 1 - 38
3 058 189 Fixed length 7,80 x 7,50 m 0° o.r. 24 t 1 - 39
3 058 179 Fixed length 7,80 x 7,50 m 0° o.r. 20 t 1 - 40
3 058 169 Fixed length 7,80 x 7,50 m 0° o.r. 11 t 1 - 41
3 058 118 Fixed length / intermediate length 7,80 x 7,50 m 0° o.r. 7t 1 - 42
3 058 128 Fixed length / intermediate length 7,80 x 7,50 m 0° o.r. 4t 1 - 44
3 058 138 Fixed length / intermediate length 7,80 x 7,50 m 0° o.r. 1t 1 - 46
3 058 019 Fixed length / intermediate length 7,80 x 5,10 m 360° 31 t 1 - 48
3 058 029 Fixed length / intermediate length 7,80 x 5,10 m 360° 24 t 1 - 50
3 058 039 Fixed length / intermediate length 7,80 x 5,10 m 360° 20 t 1 - 52
3 058 049 Fixed length / intermediate length 7,80 x 5,10 m 360° 11 t 1 - 54
3 058 059 Fixed length 7,80 x 5,10 m 360° 7t 1 - 56
3 058 069 Fixed length / intermediate length 7,80 x 5,10 m 0° o.r. 20 t 1 - 58
3 058 079 Fixed length / intermediate length 7,80 x 5,10 m 0° o.r. 11 t 1 - 60
3 058 089 Fixed length / intermediate length 7,80 x 5,10 m 0° o.r. 7t 1 - 62
3 058 099 Fixed length / intermediate length 7,80 x 5,10 m 0° o.r. 4t 1 - 64
3 058 148 Fixed length / intermediate length 7,80 x 5,10 m 0° o.r. 1t 1 - 66
3 058 158 Fixed length 7,80 x 2,50 m 0° o.r. 1t 1 - 68
3 058 168 Fixed length 7,80 x 2,50 m 0° o.f. 1t 1 - 69
General notes
The crane’s stability was determ ined in com pliance with DIN 15019.2. The
crane’s stability corresponding also ISO 4305 and p rEN 13000 - 1999.
The m echanical strength values are determ ined according to DIN 15 018.3.
The crane is designed as an errection crane in accordance with DIN 15018.1
and 3 (Lifting capacity class H1) drive group IBm in accordance with
DIN 15020.1 resp. ISO 4301/2 classification group A1.
Caution: If the crane is used for m ixed loading and unloading work, the loads must be
reduced to 70% of the perm itted loads in the lifting capacity tables.
The following lifting capacity tables only are appp licable when planning crane
operations and operating the crane.
Values stated on other inform ation sheets accom panying each m odel are not
binding .
• The crane operator m ust ensure that the values indicated in the lifting
capacity tables for load and radius are not exe eded under any
circum stances.
The safe load indicator (SLI) does not release him from this duty.
• Set the inte nded ope rating m ode on the SLI (SLI code and reeving m ode).
• Before starting work with the crane ensure that it is level horizontally and
check continually tha t it is still level during operation.
The position of the outriggers m ay only be corrected, when the crane is
unloaded.
• Lifting capacities are only valid for cranes with are level horzontally.
Tem perature range: +40°C to -25°C, in accordance with the notes in the
operating instructions.
• Set the perm itted slewing speed for the planned operating condition and
corresponding degree of utilization of the load.
• Telescopic parts m ust be locked for work with the m ain boom fixed-length
tables.
Caution: If the m ain boom is lowered beyond the authorized working range, the SLI
m ust be switched over to the riggin g table for the corresponding
counterweight com bination.
To raise from the horizontal position or to lower into the horizontal position
below the ang le of approxim ately 45° perm itted within the working ran ge, the
m ain boom m ust be com pletely retracted. The turntable m ust be locked in
position at the front and back and the corresponding SLI rigging code set.
If the boom is raised or lowered beyond these perm itted positions, the truck
crane will overturn even with a retracted boom .
• W hen working with the swing-away lattice extension and reeved hook
block on the m ain boom , load bearing capacities are reduced as follows:
Neither the weight of the hook blo ck nor the load on the m ain boom will be
read by the SLI!
The SLI registers only the loa d on the lattice extension and the weight of the
swing-away lattice extension itself.
Note: • Telescopic parts m ust be locked for work with the swing-away lattice
extension.
1 t counterweight
4 t counterweight
4 t counterweight
7 t counterweight
7 t counterweight
11 t counterweight
11 t counterweight
20 t counterweight
20 t counterweight
24 t counterweight
31 t counterweight
Hook heights
These operating areas are valid only in conjunction with the radiuses indicated in the tables for load bearing
capacity.
Roller height is determined theoretically. As a result of boom deflection, actual values vary depending on the
load.
Height in m
Radius in m
Hook heights
These operating areas are valid only in conjunction with the radiuses indicated in the tables for load bearing
capacity.
Roller height is determined theoretically. As a result of boom deflection, actual values vary depending on the
load.
Height in m
Radius in m
Height in m
Radius in m
Height in m
Radius in m
Height in m
Radius in m
Height in m
Radius in m
To be able to lower the main boom out of the operating area at a boom angle of under approx. 15°, either
all telescope sections must be fully retracted or the corresponding rigging SLI code must be set for the
rigging table in question.
Depending on the equipment status ( counterweight, outrigger span and slewing range ) you can lower the
main boom up to 1 x the telescoped status ( boom length = 22.35 m ) via the following rigging tables with
the corresponding rigging SLI codes.
If there is a rigging table for the 0 x telescoped boom, the SLI switches over automatically, i.e. without the
rigging SLI codes being entered. For all other lengths the rigging SLI code must be entered beforehand.
You can also use the telescope statuses according to the rigging tables for maintenance work within the
main boom area.
3 058 018
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing 360°
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 018
3 058 028
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing 360°
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 028
3 058 038
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing 360°
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 038
3 058 048
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing 360°
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 048
3 058 058
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing 360°
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 058
3 058 068
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing 360°
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 4.5
3 058 078
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing 360°
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 4.0
3 058 199
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 189
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 179
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 169
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 118
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 118
3 058 128
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 128
3 058 138
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 138
3 058 019
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing 360°
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 019
3 058 029
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing 360°
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 029
3 058 039
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing 360°
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 039
3 058 049
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing 360°
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 049
3 058 059
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing 360°
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 4.0
10.3 3.5
3 058 069
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 069
3 058 079
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 079
3 058 089
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 089
3 058 099
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 099
3 058 148
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 148
3 058 158
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
3 058 168
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over front
range
Radius in m Lifting capacities in t
3.0 5.0
4.0 5.0
5.0 5.0
6.0 5.0
7.0 5.0
8.0 5.0
9.0 5.0
10.0 5.0
10.3 5.0
The main boom can be telescoped up to the main boom angles given in the following tables with a
front-mounted swing-away lattice extension. The permitted loads (weight of hook block) are also given in
the following tables.
Setting down the main boom with a front-mounted swing-away lattice extension is possible only with a fully
retracted main boom.
When telescoping the main boom the superstructure must not be slewed. When telescoping the main boom
fast speed must not be used for hoist, derricking gear and telescoping.
3 058 119
Counterweight: 31,0 t / 24,0 t / 20,0 t / 11,0 t / 7,0 t Supporting base: 7,80 x 7,50 m
3 058 129
3 058 010
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 100.0
4.0 75.0
5.0 65.5
6.0 57.5
7.0 51.0
8.0 44.5
9.0 38.0
10.0 28.0
Lifting loads > 96,0 t can be lifted only with additional equipment.
3 058 020
3.0 93.0 79.0 63.0 50.0 50.0 63.0 50.0 49.5 35.0
4.0 75.0 71.5 63.0 50.0 44.5 63.0 50.0 43.5 31.0
5.0 65.5 62.5 63.0 50.0 40.5 61.0 50.0 39.5 28.0
6.0 57.5 55.0 55.5 47.5 37.0 54.0 46.5 35.0 25.0
7.0 51.0 49.5 50.0 43.5 34.5 48.0 42.5 32.0 23.0
8.0 44.5 44.5 45.0 39.5 31.5 43.5 39.0 29.0 21.0
9.0 38.0 40.0 41.0 37.0 29.5 39.5 36.0 27.0 19.7
10.0 28.0 36.5 37.0 34.0 27.5 36.5 33.0 25.0 18.1
3 058 020
6.0 50.0 39.0 24.5 37.0 26.5 21.0 21.5 24.5 26.0
7.0 47.0 36.0 22.5 37.0 24.5 19.3 20.0 24.5 26.0
8.0 43.0 33.0 20.0 35.5 22.5 17.4 18.6 24.0 26.0
9.0 39.0 30.5 18.8 33.5 21.0 16.2 17.4 22.5 25.0
10.0 36.0 28.5 17.3 31.0 19.3 14.9 16.2 21.0 23.5
11.0 32.0 26.5 16.2 29.5 18.2 13.8 15.0 19.8 22.0
12.0 28.5 24.5 15.1 27.5 17.0 12.7 13.9 18.6 20.5
13.0 25.0 23.0 14.2 26.0 16.1 11.9 13.2 17.7 19.1
14.0 22.5 21.5 13.3 23.0 15.3 11.2 12.5 16.8 18.0
15.0 19.9 20.5 12.4 21.0 14.4 10.5 11.8 15.9 16.9
16.0 17.9 19.2 11.9 18.8 13.7 10.0 11.1 15.2 15.8
18.0 14.7 15.9 10.8 15.5 12.5 9.1 10.1 13.8 14.3
20.0 12.2 13.4 9.7 13.0 11.2 8.1 9.2 12.5 12.6
22.0 10.2 11.4 9.0 11.1 10.4 7.3 8.5 11.7 10.6
24.0 8.6 9.8 8.4 9.5 9.6 6.6 7.9 10.1 9.0
3 058 020
46.0 2.2
3 058 030
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 030
46.0 2.2
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 030
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 030
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 33.0 19.3 22.5 11.5 29.0 15.2 22.5 24.0 18.1
9.0 30.5 18.7 22.5 11.1 29.0 14.7 21.0 22.5 18.0
10.0 28.5 18.0 21.5 10.8 29.0 14.2 19.3 21.0 17.0
11.0 26.5 17.4 20.5 10.4 29.0 13.6 18.2 19.8 16.1
12.0 24.5 16.8 19.5 10.1 27.5 13.0 17.0 18.6 15.2
13.0 23.0 16.1 18.4 9.8 26.0 12.5 16.1 17.7 14.4
14.0 21.5 15.4 17.3 9.5 23.5 12.0 15.3 16.8 13.6
15.0 20.5 14.4 16.2 9.2 21.0 11.4 14.4 15.9 12.7
16.0 19.3 13.4 15.1 8.8 18.8 10.9 13.7 15.2 12.2
18.0 16.0 12.2 13.6 8.1 15.6 10.1 12.5 13.8 11.2
20.0 13.5 10.9 12.2 7.3 13.1 9.3 11.2 12.5 10.1
22.0 11.5 10.0 11.2 6.5 11.1 8.5 10.4 11.7 9.4
24.0 9.9 9.1 9.6 6.1 9.5 7.8 9.6 10.1 8.7
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 040
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 040
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 040
3.0 27.0
4.0 26.5 12.8 23.0
5.0 25.5 11.7 22.0 9.3
36.0 4.4
38.0 3.8
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 040
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 22.0 9.0 18.0 6.3 18.6 6.7 21.5 18.2 17.9
7.0 21.5 8.2 17.3 5.8 17.9 6.2 20.5 17.5 17.2
8.0 21.0 7.6 16.6 5.3 17.3 5.7 20.0 16.9 16.5
9.0 20.5 7.0 16.0 4.9 16.7 5.3 19.4 16.3 15.8
10.0 19.9 6.6 15.4 4.5 16.2 4.9 18.9 15.7 15.3
11.0 19.4 6.2 14.9 4.1 15.8 4.5 18.2 15.2 14.7
12.0 19.1 5.9 14.4 3.8 15.3 4.2 17.0 14.7 14.2
13.0 18.7 5.6 14.0 3.5 15.0 3.9 16.1 14.3 13.8
14.0 18.4 5.3 13.6 3.2 14.6 3.6 15.3 13.9 13.3
15.0 18.2 5.1 13.2 2.9 14.3 3.4 14.4 13.5 12.7
16.0 18.0 4.9 12.9 2.7 14.0 3.1 13.7 13.2 12.2
18.0 16.0 4.4 12.2 2.3 13.6 2.7 12.5 12.6 11.2
20.0 13.5 4.1 11.7 1.9 13.1 2.4 11.2 12.1 10.1
22.0 11.5 3.8 11.2 1.6 11.1 2.1 10.4 11.7 9.4
24.0 9.9 3.5 9.6 1.3 9.5 1.8 9.6 10.1 8.7
36.0 4.8
38.0 4.3
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 050
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 050
36.0 4.8
38.0 4.3
40.0 3.8
42.0 3.3
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 050
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
36.0 4.4
38.0 3.8
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 050
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 33.0 19.3 22.5 11.5 29.0 15.2 22.5 24.0 18.1
9.0 30.5 16.2 22.5 11.1 29.0 14.7 21.0 22.5 18.0
10.0 28.5 13.5 21.5 10.8 29.0 13.1 19.3 21.0 17.0
11.0 26.5 11.5 20.5 9.7 29.0 11.0 18.2 19.8 16.1
12.0 24.5 9.9 19.5 8.2 27.5 9.3 17.0 18.6 15.2
13.0 23.0 8.6 18.4 7.0 26.0 8.0 16.1 17.7 14.4
14.0 21.5 7.6 17.3 6.0 23.5 6.9 15.3 16.8 13.6
15.0 20.5 6.7 16.2 5.2 21.0 5.9 14.4 15.9 12.7
16.0 19.3 5.8 15.1 4.4 18.8 5.1 13.7 15.2 12.2
18.0 16.0 4.7 13.6 3.2 15.6 3.8 12.5 13.8 11.2
20.0 13.5 3.6 12.2 2.3 13.1 2.8 11.2 12.5 10.1
22.0 11.5 2.9 11.2 1.5 11.1 2.0 10.4 11.7 9.4
24.0 9.9 2.2 9.6 0.9 9.5 1.3 9.6 10.1 8.7
36.0 4.8
38.0 4.3
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 011
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 100.0
4.0 75.0
5.0 65.5
6.0 57.5
7.0 51.0
8.0 44.5
9.0 38.0
10.0 28.0
Lifting loads > 96,0 t can be lifted only with additional equipment.
3 058 021
3.0 92.5 79.0 63.0 50.0 50.0 63.0 50.0 49.5 35.0
4.0 75.0 71.5 63.0 50.0 44.5 63.0 50.0 43.5 31.0
5.0 65.5 62.5 63.0 50.0 40.5 61.0 50.0 39.5 28.0
6.0 57.5 55.0 55.5 47.5 37.0 54.0 46.5 35.0 25.0
7.0 51.0 49.5 50.0 43.5 34.5 48.0 42.5 32.0 23.0
8.0 44.5 44.5 45.0 39.5 31.5 43.5 39.0 29.0 21.0
9.0 38.0 38.5 39.5 37.0 29.5 37.5 36.0 27.0 19.7
10.0 28.0 32.0 33.0 34.0 27.5 32.5 33.0 25.0 18.1
3 058 021
6.0 50.0 39.0 24.5 37.0 26.5 21.0 21.5 24.5 26.0
7.0 47.0 36.0 22.5 37.0 24.5 19.3 20.0 24.5 26.0
8.0 42.5 33.0 20.0 35.5 22.5 17.4 18.6 24.0 26.0
9.0 36.5 30.5 18.8 33.5 21.0 16.2 17.4 22.5 25.0
10.0 31.5 28.5 17.3 31.0 19.3 14.9 16.2 21.0 23.5
11.0 28.0 26.5 16.2 27.5 18.2 13.8 15.0 19.8 22.0
12.0 25.0 24.5 15.1 24.5 17.0 12.7 13.9 18.6 20.5
13.0 21.5 23.0 14.2 22.5 16.1 11.9 13.2 17.7 19.1
14.0 19.2 20.5 13.3 20.0 15.3 11.2 12.5 16.8 18.0
15.0 17.0 18.4 12.4 17.9 14.4 10.5 11.8 15.9 16.9
16.0 15.2 16.6 11.9 16.1 13.7 10.0 11.1 15.2 15.6
18.0 12.4 13.6 10.8 13.2 12.5 9.1 10.1 13.8 12.8
20.0 10.2 11.4 9.7 11.0 11.2 8.1 9.2 11.7 10.6
22.0 8.4 9.6 9.0 9.3 10.3 7.3 8.5 9.9 8.8
24.0 7.0 8.2 8.4 7.8 8.9 6.6 7.9 8.5 7.4
3 058 021
46.0 1.4
3 058 031
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 031
46.0 1.4
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 031
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 031
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 33.0 19.3 22.5 11.5 29.0 15.2 22.5 24.0 18.1
9.0 30.5 18.7 22.5 11.1 29.0 14.7 21.0 22.5 18.0
10.0 28.5 18.0 21.5 10.8 29.0 14.2 19.3 21.0 17.0
11.0 26.5 17.4 20.5 10.4 27.5 13.6 18.2 19.8 16.1
12.0 24.5 16.8 19.5 10.1 25.0 13.0 17.0 18.6 15.2
13.0 23.0 16.1 18.4 9.8 22.5 12.5 16.1 17.7 14.4
14.0 20.5 15.4 17.3 9.5 20.0 12.0 15.3 16.8 13.6
15.0 18.4 14.4 16.2 9.2 18.0 11.4 14.4 15.9 12.7
16.0 16.6 13.4 15.1 8.8 16.2 10.9 13.7 15.2 12.2
18.0 13.7 12.2 13.3 8.1 13.3 10.1 12.5 13.8 11.2
20.0 11.5 10.9 11.1 7.3 11.0 9.3 11.2 11.7 10.1
22.0 9.7 9.5 9.3 6.5 9.3 8.5 10.3 9.9 9.4
24.0 8.2 8.1 7.9 6.1 7.9 7.4 8.9 8.5 8.7
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 041
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 041
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 041
3.0 27.0
4.0 26.5 12.8 23.0
5.0 25.5 11.7 22.0 9.3
36.0 3.3
38.0 2.8
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 041
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 22.0 9.0 18.0 6.3 18.6 6.7 21.5 18.2 17.9
7.0 21.5 8.2 17.3 5.8 17.9 6.2 20.5 17.5 17.2
8.0 21.0 7.6 16.6 5.3 17.3 5.7 20.0 16.9 16.5
9.0 20.5 7.0 16.0 4.9 16.7 5.3 19.4 16.3 15.8
10.0 19.9 6.6 15.4 4.5 16.2 4.9 18.9 15.7 15.3
11.0 19.4 6.2 14.9 4.1 15.8 4.5 18.2 15.2 14.7
12.0 19.1 5.9 14.4 3.8 15.3 4.2 17.0 14.7 14.2
13.0 18.7 5.6 14.0 3.5 15.0 3.9 16.1 14.3 13.8
14.0 18.4 5.3 13.6 3.2 14.6 3.6 15.3 13.9 13.3
15.0 18.2 5.1 13.2 2.9 14.3 3.4 14.4 13.5 12.7
16.0 16.6 4.9 12.9 2.7 14.0 3.1 13.7 13.2 12.2
18.0 13.7 4.4 12.2 2.3 13.3 2.7 12.5 12.6 11.2
20.0 11.5 4.1 11.1 1.9 11.0 2.4 11.2 11.7 10.1
22.0 9.7 3.8 9.3 1.6 9.3 2.1 10.3 9.9 9.4
24.0 8.2 3.5 7.9 1.3 7.9 1.8 8.9 8.5 8.7
36.0 3.8
38.0 3.3
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 051
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 051
36.0 3.8
38.0 3.3
40.0 2.8
42.0 2.4
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 051
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
36.0 3.3
38.0 2.8
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 051
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 33.0 19.3 22.5 11.5 29.0 15.2 22.5 24.0 18.1
9.0 30.5 16.2 22.5 11.1 29.0 14.7 21.0 22.5 18.0
10.0 28.5 13.5 21.5 10.8 29.0 13.1 19.3 21.0 17.0
11.0 26.5 11.5 20.5 9.7 27.5 11.0 18.2 19.8 16.1
12.0 24.5 9.9 19.5 8.2 25.0 9.3 17.0 18.6 15.2
13.0 23.0 8.6 18.4 7.0 22.5 8.0 16.1 17.7 14.4
14.0 20.5 7.6 17.3 6.0 20.0 6.9 15.3 16.8 13.6
15.0 18.4 6.7 16.2 5.2 18.0 5.9 14.4 15.9 12.7
16.0 16.6 5.8 15.1 4.4 16.2 5.1 13.7 15.2 12.2
18.0 13.7 4.7 13.3 3.2 13.3 3.8 12.5 13.8 11.2
20.0 11.5 3.6 11.1 2.3 11.0 2.8 11.2 11.7 10.1
22.0 9.7 2.9 9.3 1.5 9.3 2.0 10.3 9.9 9.4
24.0 8.2 2.2 7.9 0.9 7.9 1.3 8.9 8.5 8.7
36.0 3.8
38.0 3.3
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 012
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 100.0
4.0 75.0
5.0 65.5
6.0 57.5
7.0 51.0
8.0 44.5
9.0 36.0
10.0 28.0
Lifting loads > 96,0 t can be lifted only with additional equipment.
3 058 022
3.0 92.0 79.0 63.0 50.0 50.0 63.0 50.0 49.5 35.0
4.0 75.0 71.5 63.0 50.0 44.5 63.0 50.0 43.5 31.0
5.0 65.5 62.5 63.0 50.0 40.5 61.0 50.0 39.5 28.0
6.0 57.5 55.0 55.5 47.5 37.0 54.0 46.5 35.0 25.0
7.0 50.5 49.5 50.0 43.5 34.5 48.0 42.5 32.0 23.0
8.0 43.0 42.5 43.5 39.5 31.5 40.0 39.0 29.0 21.0
9.0 36.0 35.0 36.5 37.0 29.5 34.0 35.5 27.0 19.7
10.0 28.0 29.0 30.0 31.0 27.5 29.5 31.0 25.0 18.1
3 058 022
6.0 50.0 39.0 24.5 37.0 26.5 21.0 21.5 24.5 26.0
7.0 46.5 36.0 22.5 37.0 24.5 19.3 20.0 24.5 26.0
8.0 39.0 33.0 20.0 35.5 22.5 17.4 18.6 24.0 26.0
9.0 33.0 30.5 18.8 32.5 21.0 16.2 17.4 22.5 25.0
10.0 29.0 28.5 17.3 28.5 19.3 14.9 16.2 21.0 23.5
11.0 25.0 26.5 16.2 25.0 18.2 13.8 15.0 19.8 22.0
12.0 22.5 24.0 15.1 22.5 17.0 12.7 13.9 18.6 20.5
13.0 19.6 21.0 14.2 20.0 16.1 11.9 13.2 17.7 18.8
14.0 17.2 18.6 13.3 18.2 15.3 11.2 12.5 16.8 16.9
15.0 15.3 16.6 12.4 16.2 14.4 10.5 11.8 15.9 15.3
16.0 13.6 14.9 11.9 14.5 13.7 10.0 11.1 15.2 14.0
18.0 11.0 12.2 10.8 11.8 12.5 9.1 10.1 12.5 11.4
20.0 8.9 10.2 9.7 9.8 10.8 8.1 9.2 10.4 9.3
22.0 7.3 8.5 9.0 8.2 9.2 7.3 8.5 8.8 7.7
24.0 6.0 7.2 8.0 6.8 7.9 6.6 7.9 7.5 6.4
3 058 022
3 058 032
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 032
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 032
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 032
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 33.0 19.3 22.5 11.5 29.0 15.2 22.5 24.0 18.1
9.0 30.5 18.7 22.5 11.1 29.0 14.7 21.0 22.5 18.0
10.0 28.5 18.0 21.5 10.8 28.5 14.2 19.3 21.0 17.0
11.0 26.5 17.4 20.5 10.4 25.0 13.6 18.2 19.8 16.1
12.0 24.0 16.8 19.5 10.1 22.5 13.0 17.0 18.6 15.2
13.0 21.0 16.1 18.4 9.8 20.0 12.5 16.1 17.7 14.4
14.0 18.7 15.4 17.3 9.5 18.2 12.0 15.3 16.8 13.6
15.0 16.7 14.4 16.0 9.2 16.2 11.4 14.4 15.9 12.7
16.0 15.0 13.4 14.6 8.8 14.5 10.9 13.7 15.2 12.2
18.0 12.3 12.1 11.9 8.1 11.9 10.1 12.5 12.5 11.2
20.0 10.2 10.0 9.9 7.3 9.8 9.3 10.8 10.4 10.1
22.0 8.6 8.4 8.2 6.5 8.2 7.8 9.2 8.8 9.1
24.0 7.3 7.1 6.9 6.1 6.9 6.4 7.9 7.5 7.7
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 042
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 042
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 042
3.0 27.0
4.0 26.5 12.8 23.0
5.0 25.5 11.7 22.0 9.3
36.0 2.7
38.0 2.2
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 042
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 22.0 9.0 18.0 6.3 18.6 6.7 21.5 18.2 17.9
7.0 21.5 8.2 17.3 5.8 17.9 6.2 20.5 17.5 17.2
8.0 21.0 7.6 16.6 5.3 17.3 5.7 20.0 16.9 16.5
9.0 20.5 7.0 16.0 4.9 16.7 5.3 19.4 16.3 15.8
10.0 19.9 6.6 15.4 4.5 16.2 4.9 18.9 15.7 15.3
11.0 19.4 6.2 14.9 4.1 15.8 4.5 18.2 15.2 14.7
12.0 19.1 5.9 14.4 3.8 15.3 4.2 17.0 14.7 14.2
13.0 18.7 5.6 14.0 3.5 15.0 3.9 16.1 14.3 13.8
14.0 18.4 5.3 13.6 3.2 14.6 3.6 15.3 13.9 13.3
15.0 16.7 5.1 13.2 2.9 14.3 3.4 14.4 13.5 12.7
16.0 15.0 4.9 12.9 2.7 14.0 3.1 13.7 13.2 12.2
18.0 12.3 4.4 11.9 2.3 11.9 2.7 12.5 12.5 11.2
20.0 10.2 4.1 9.9 1.9 9.8 2.4 10.8 10.4 10.1
22.0 8.6 3.8 8.2 1.6 8.2 2.1 9.2 8.8 9.1
24.0 7.3 3.5 6.9 1.3 6.9 1.8 7.9 7.5 7.7
36.0 3.1
38.0 2.6
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 052
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 052
36.0 3.1
38.0 2.6
40.0 2.2
42.0 1.8
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 052
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
36.0 2.7
38.0 2.2
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 052
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 33.0 19.3 22.5 11.5 29.0 15.2 22.5 24.0 18.1
9.0 30.5 16.2 22.5 11.1 29.0 14.7 21.0 22.5 18.0
10.0 28.5 13.5 21.5 10.8 28.5 13.1 19.3 21.0 17.0
11.0 26.5 11.5 20.5 9.7 25.0 11.0 18.2 19.8 16.1
12.0 24.0 9.9 19.5 8.2 22.5 9.3 17.0 18.6 15.2
13.0 21.0 8.6 18.4 7.0 20.0 8.0 16.1 17.7 14.4
14.0 18.7 7.6 17.3 6.0 18.2 6.9 15.3 16.8 13.6
15.0 16.7 6.7 16.0 5.2 16.2 5.9 14.4 15.9 12.7
16.0 15.0 5.8 14.6 4.4 14.5 5.1 13.7 15.2 12.2
18.0 12.3 4.7 11.9 3.2 11.9 3.8 12.5 12.5 11.2
20.0 10.2 3.6 9.9 2.3 9.8 2.8 10.8 10.4 10.1
22.0 8.6 2.9 8.2 1.5 8.2 2.0 9.2 8.8 9.1
24.0 7.3 2.2 6.9 0.9 6.9 1.3 7.9 7.5 7.7
36.0 3.1
38.0 2.6
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 013
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 100.0
4.0 75.0
5.0 65.5
6.0 57.5
7.0 46.0
8.0 35.5
9.0 28.0
10.0 23.0
Lifting loads > 96,0 t can be lifted only with additional equipment.
3 058 023
3.0 91.5 79.0 63.0 50.0 50.0 63.0 50.0 49.5 35.0
4.0 75.0 71.5 63.0 50.0 44.5 63.0 50.0 43.5 31.0
5.0 65.0 62.5 63.0 50.0 40.5 61.0 50.0 39.5 28.0
6.0 55.5 51.5 53.0 47.5 37.0 47.5 46.5 35.0 25.0
7.0 45.5 40.5 42.0 43.0 34.5 38.0 40.0 32.0 23.0
8.0 35.5 33.0 34.5 35.5 31.5 31.5 33.0 29.0 21.0
9.0 28.0 27.5 28.5 29.5 29.5 26.5 28.0 27.0 19.7
10.0 23.0 22.5 23.5 24.0 25.0 22.5 24.0 25.0 18.1
3 058 023
6.0 45.0 39.0 24.5 37.0 26.5 21.0 21.5 24.5 26.0
7.0 36.5 36.0 22.5 35.5 24.5 19.3 20.0 24.5 26.0
8.0 30.5 32.5 20.0 30.0 22.5 17.4 18.6 24.0 26.0
9.0 26.0 27.5 18.8 25.5 21.0 16.2 17.4 22.5 23.5
10.0 22.0 24.0 17.3 22.0 19.3 14.9 16.2 21.0 20.5
11.0 19.3 21.0 16.2 19.5 18.2 13.8 15.0 19.4 18.0
12.0 17.0 18.6 15.1 17.2 17.0 12.7 13.9 17.3 15.9
13.0 14.9 16.3 14.2 15.4 16.1 11.9 13.2 15.5 14.1
14.0 13.0 14.4 13.3 13.7 15.1 11.2 12.5 13.9 12.5
15.0 11.4 12.7 12.4 12.2 13.4 10.5 11.8 12.5 11.1
16.0 9.9 11.3 11.9 10.9 12.0 10.0 11.1 11.3 9.9
18.0 7.7 9.0 9.9 8.6 9.7 9.1 10.0 9.3 8.0
20.0 5.9 7.2 8.1 6.8 7.9 8.1 8.2 7.5 6.4
22.0 4.6 5.9 6.7 5.5 6.5 6.7 6.8 6.1 5.0
24.0 3.5 4.7 5.5 4.4 5.4 5.6 5.7 5.0 3.9
3 058 023
3 058 033
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 033
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 033
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
36.0 1.1
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 033
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 32.5 19.3 22.5 11.5 29.0 15.2 22.5 24.0 18.1
9.0 27.5 18.7 22.5 11.1 25.5 14.7 21.0 22.5 18.0
10.0 24.0 18.0 21.0 10.8 22.0 14.2 19.3 21.0 17.0
11.0 21.0 17.4 18.7 10.4 19.5 13.6 18.2 19.4 16.1
12.0 18.7 16.8 16.6 10.1 17.3 13.0 17.0 17.3 15.2
13.0 16.4 15.7 14.8 9.8 15.4 12.5 16.1 15.5 14.4
14.0 14.4 14.0 13.2 9.5 13.7 12.0 15.1 13.9 13.6
15.0 12.8 12.5 11.8 9.2 12.3 11.2 13.4 12.5 12.4
16.0 11.4 11.1 10.6 8.8 10.9 10.0 12.0 11.3 11.2
18.0 9.1 8.8 8.7 7.9 8.6 8.1 9.7 9.3 9.3
20.0 7.3 7.1 6.9 6.4 6.9 6.4 7.9 7.5 7.8
22.0 5.9 5.7 5.6 5.2 5.5 5.1 6.5 6.1 6.4
24.0 4.8 4.6 4.5 4.1 4.4 4.0 5.4 5.0 5.3
36.0 1.5
38.0 1.1
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 043
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 043
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 043
3.0 27.0
4.0 26.5 12.8 23.0
5.0 25.5 11.7 22.0 9.3
36.0 1.1
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 043
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 22.0 9.0 18.0 6.3 18.6 6.7 21.5 18.2 17.9
7.0 21.5 8.2 17.3 5.8 17.9 6.2 20.5 17.5 17.2
8.0 21.0 7.6 16.6 5.3 17.3 5.7 20.0 16.9 16.5
9.0 20.5 7.0 16.0 4.9 16.7 5.3 19.4 16.3 15.8
10.0 19.9 6.6 15.4 4.5 16.2 4.9 18.9 15.7 15.3
11.0 19.4 6.2 14.9 4.1 15.8 4.5 18.2 15.2 14.7
12.0 18.7 5.9 14.4 3.8 15.3 4.2 17.0 14.7 14.2
13.0 16.4 5.6 14.0 3.5 15.0 3.9 16.1 14.3 13.8
14.0 14.4 5.3 13.2 3.2 13.7 3.6 15.1 13.9 13.3
15.0 12.8 5.1 11.8 2.9 12.3 3.4 13.4 12.5 12.4
16.0 11.4 4.9 10.6 2.7 10.9 3.1 12.0 11.3 11.2
18.0 9.1 4.4 8.7 2.3 8.6 2.7 9.7 9.3 9.3
20.0 7.3 4.1 6.9 1.9 6.9 2.4 7.9 7.5 7.8
22.0 5.9 3.8 5.6 1.6 5.5 2.1 6.5 6.1 6.4
24.0 4.8 3.5 4.5 1.3 4.4 1.8 5.4 5.0 5.3
36.0 1.5
38.0 1.1
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 053
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 053
36.0 1.5
38.0 1.1
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 053
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
36.0 1.1
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 053
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 32.5 19.3 22.5 11.5 29.0 15.2 22.5 24.0 18.1
9.0 27.5 16.2 22.5 11.1 25.5 14.7 21.0 22.5 18.0
10.0 24.0 13.5 21.0 10.8 22.0 13.1 19.3 21.0 17.0
11.0 21.0 11.5 18.7 9.7 19.5 11.0 18.2 19.4 16.1
12.0 18.7 9.9 16.6 8.2 17.3 9.3 17.0 17.3 15.2
13.0 16.4 8.6 14.8 7.0 15.4 8.0 16.1 15.5 14.4
14.0 14.4 7.6 13.2 6.0 13.7 6.9 15.1 13.9 13.6
15.0 12.8 6.7 11.8 5.2 12.3 5.9 13.4 12.5 12.4
16.0 11.4 5.8 10.6 4.4 10.9 5.1 12.0 11.3 11.2
18.0 9.1 4.7 8.7 3.2 8.6 3.8 9.7 9.3 9.3
20.0 7.3 3.6 6.9 2.3 6.9 2.8 7.9 7.5 7.8
22.0 5.9 2.9 5.6 1.5 5.5 2.0 6.5 6.1 6.4
24.0 4.8 2.2 4.5 0.9 4.4 1.3 5.4 5.0 5.3
36.0 1.5
38.0 1.1
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 014
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing +- 0° over rear
range
Radius in m Lifting capacities in t
3.0 100.0
4.0 75.0
5.0 65.5
6.0 52.0
7.0 40.5
8.0 31.0
9.0 24.5
10.0 19.9
Lifting loads > 96,0 t can be lifted only with additional equipment.
3 058 024
3.0 91.0 79.0 63.0 50.0 50.0 63.0 50.0 49.5 35.0
4.0 75.0 71.5 63.0 50.0 44.5 63.0 50.0 43.5 31.0
5.0 64.0 60.5 62.5 50.0 40.5 55.0 50.0 39.5 28.0
6.0 52.0 45.0 46.5 47.5 37.0 41.5 44.0 35.0 25.0
7.0 40.5 35.5 36.5 37.5 34.5 33.0 35.0 32.0 23.0
8.0 31.0 28.5 30.0 31.0 31.5 27.0 29.0 29.0 21.0
9.0 24.5 23.5 24.5 25.5 26.5 22.5 24.5 25.5 19.7
10.0 19.9 19.2 20.0 21.0 21.5 19.2 21.0 22.0 18.1
3 058 024
6.0 39.5 39.0 24.5 37.0 26.5 21.0 21.5 24.5 26.0
7.0 32.0 34.0 22.5 31.0 24.5 19.3 20.0 24.5 26.0
8.0 26.5 28.5 20.0 26.0 22.5 17.4 18.6 24.0 24.0
9.0 22.5 24.0 18.8 22.0 21.0 16.2 17.4 22.0 20.5
10.0 19.0 21.0 17.3 19.1 19.3 14.9 16.2 19.0 17.4
11.0 16.3 18.1 16.2 16.5 18.1 13.8 15.0 16.6 15.0
12.0 14.0 15.8 15.1 14.4 15.9 12.7 13.9 14.6 13.1
13.0 12.2 13.9 14.2 12.7 14.1 11.9 13.2 12.9 11.4
14.0 10.7 12.2 13.1 11.2 12.6 11.2 12.3 11.5 10.1
15.0 9.2 10.6 11.5 9.9 11.3 10.5 11.1 10.3 8.9
16.0 7.9 9.3 10.2 8.8 10.0 10.0 10.0 9.2 7.8
18.0 5.9 7.3 8.1 6.8 8.0 8.1 8.2 7.5 6.2
20.0 4.4 5.7 6.6 5.3 6.4 6.6 6.7 6.0 4.8
22.0 3.2 4.5 5.3 4.1 5.2 5.3 5.4 4.8 3.7
24.0 2.3 3.5 4.3 3.2 4.2 4.4 4.4 3.8 2.7
3 058 024
3 058 034
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 034
36.0 0.9
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 034
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 034
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 28.5 19.3 22.5 11.5 26.0 15.2 22.5 24.0 18.1
9.0 24.0 18.7 21.0 11.1 22.0 14.7 21.0 22.0 18.0
10.0 21.0 18.0 18.2 10.8 19.2 14.2 19.3 19.0 17.0
11.0 18.1 16.9 15.8 10.4 16.6 13.6 18.1 16.6 16.1
12.0 15.9 14.7 13.8 10.1 14.5 13.0 15.9 14.6 14.3
13.0 14.0 13.0 12.2 9.8 12.7 11.5 14.1 12.9 12.7
14.0 12.2 11.5 10.8 9.5 11.2 10.1 12.6 11.5 11.3
15.0 10.7 10.2 9.6 8.7 10.0 8.9 11.3 10.3 10.2
16.0 9.4 9.1 8.5 7.7 8.9 7.9 10.0 9.2 9.2
18.0 7.3 7.1 6.8 6.0 6.9 6.2 8.0 7.5 7.5
20.0 5.8 5.5 5.4 4.8 5.3 4.9 6.4 6.0 6.2
22.0 4.6 4.3 4.2 3.7 4.1 3.7 5.2 4.8 5.0
24.0 3.6 3.4 3.3 2.8 3.2 2.7 4.2 3.8 4.1
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 044
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 044
36.0 0.9
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 044
3.0 27.0
4.0 26.5 12.8 23.0
5.0 25.5 11.7 22.0 9.3
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 044
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 22.0 9.0 18.0 6.3 18.6 6.7 21.5 18.2 17.9
7.0 21.5 8.2 17.3 5.8 17.9 6.2 20.5 17.5 17.2
8.0 21.0 7.6 16.6 5.3 17.3 5.7 20.0 16.9 16.5
9.0 20.5 7.0 16.0 4.9 16.7 5.3 19.4 16.3 15.8
10.0 19.9 6.6 15.4 4.5 16.2 4.9 18.9 15.7 15.3
11.0 18.1 6.2 14.9 4.1 15.8 4.5 18.1 15.2 14.7
12.0 15.9 5.9 13.8 3.8 14.5 4.2 15.9 14.6 14.2
13.0 14.0 5.6 12.2 3.5 12.7 3.9 14.1 12.9 12.7
14.0 12.2 5.3 10.8 3.2 11.2 3.6 12.6 11.5 11.3
15.0 10.7 5.1 9.6 2.9 10.0 3.4 11.3 10.3 10.2
16.0 9.4 4.9 8.5 2.7 8.9 3.1 10.0 9.2 9.2
18.0 7.3 4.4 6.8 2.3 6.9 2.7 8.0 7.5 7.5
20.0 5.8 4.1 5.4 1.9 5.3 2.4 6.4 6.0 6.2
22.0 4.6 3.8 4.2 1.6 4.1 2.1 5.2 4.8 5.0
24.0 3.6 3.4 3.3 1.3 3.2 1.8 4.2 3.8 4.1
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 054
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 054
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 054
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 054
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 28.5 19.3 22.5 11.5 26.0 15.2 22.5 24.0 18.1
9.0 24.0 16.2 21.0 11.1 22.0 14.7 21.0 22.0 18.0
10.0 21.0 13.5 18.2 10.8 19.2 13.1 19.3 19.0 17.0
11.0 18.1 11.5 15.8 9.7 16.6 11.0 18.1 16.6 16.1
12.0 15.9 9.9 13.8 8.2 14.5 9.3 15.9 14.6 14.3
13.0 14.0 8.6 12.2 7.0 12.7 8.0 14.1 12.9 12.7
14.0 12.2 7.6 10.8 6.0 11.2 6.9 12.6 11.5 11.3
15.0 10.7 6.7 9.6 5.2 10.0 5.9 11.3 10.3 10.2
16.0 9.4 5.8 8.5 4.4 8.9 5.1 10.0 9.2 9.2
18.0 7.3 4.7 6.8 3.2 6.9 3.8 8.0 7.5 7.5
20.0 5.8 3.6 5.4 2.3 5.3 2.8 6.4 6.0 6.2
22.0 4.6 2.9 4.2 1.5 4.1 2.0 5.2 4.8 5.0
24.0 3.6 2.2 3.3 0.9 3.2 1.3 4.2 3.8 4.1
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 025
3.0 90.5 79.0 63.0 50.0 50.0 63.0 50.0 49.5 35.0
4.0 75.0 69.5 63.0 50.0 44.5 59.5 50.0 43.5 31.0
5.0 59.0 49.0 50.5 50.0 40.5 43.5 45.5 39.5 28.0
6.0 44.0 37.0 38.5 39.5 37.0 33.5 35.5 35.0 25.0
7.0 34.5 29.0 30.5 31.5 32.5 27.0 29.0 30.5 23.0
8.0 28.0 24.0 25.0 26.0 27.0 22.0 24.0 25.5 21.0
9.0 22.0 19.4 20.5 22.0 22.5 18.3 20.0 21.5 19.7
10.0 17.7 16.1 17.2 18.3 19.1 15.2 16.9 18.3 18.1
3 058 025
6.0 31.5 33.5 24.5 30.0 26.5 21.0 21.5 24.5 26.0
7.0 26.0 27.5 22.5 25.0 24.5 19.3 20.0 24.0 22.5
8.0 21.5 23.5 20.0 21.0 22.5 17.4 18.6 20.5 18.6
9.0 17.8 19.7 18.8 17.7 19.3 16.2 17.4 17.4 15.8
10.0 15.1 16.9 17.3 15.1 16.7 14.9 15.9 15.0 13.5
11.0 12.8 14.6 15.8 13.1 14.6 13.8 14.0 13.1 11.6
12.0 11.0 12.8 13.9 11.4 12.8 12.7 12.4 11.5 10.1
13.0 9.5 11.2 12.3 10.0 11.4 11.6 11.0 10.2 8.8
14.0 8.3 9.9 11.0 8.8 10.1 10.3 9.9 9.0 7.6
15.0 7.2 8.8 9.8 7.7 9.1 9.3 8.9 8.1 6.7
16.0 6.3 7.8 8.9 6.8 8.2 8.4 8.0 7.2 5.8
18.0 4.7 6.1 7.0 5.3 6.6 6.8 6.5 5.8 4.4
20.0 3.4 4.7 5.6 4.2 5.4 5.6 5.4 4.6 3.3
22.0 2.4 3.6 4.4 3.2 4.3 4.5 4.4 3.7 2.4
24.0 1.5 2.7 3.5 2.4 3.4 3.6 3.6 2.9 1.7
3 058 025
3 058 035
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 035
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 035
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 035
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 28.0 20.0 22.5 11.8 25.0 15.8 24.5 24.0 18.1
8.0 23.5 19.3 19.5 11.5 21.0 15.2 22.5 20.5 18.1
9.0 19.8 18.0 16.5 11.1 17.7 14.7 19.3 17.4 16.6
10.0 17.0 15.5 14.2 10.8 15.2 13.5 16.7 15.0 14.5
11.0 14.7 13.4 12.3 10.4 13.1 11.7 14.6 13.1 12.7
12.0 12.8 11.7 10.8 9.6 11.4 10.1 12.8 11.5 11.2
13.0 11.3 10.3 9.5 8.4 10.0 8.8 11.4 10.2 10.0
14.0 10.0 9.1 8.3 7.4 8.8 7.7 10.1 9.0 8.9
15.0 8.9 8.0 7.4 6.4 7.8 6.7 9.1 8.1 7.9
16.0 7.9 7.1 6.5 5.7 6.9 5.9 8.2 7.2 7.1
18.0 6.2 5.6 5.1 4.3 5.4 4.5 6.6 5.8 5.8
20.0 4.8 4.4 4.0 3.3 4.2 3.4 5.4 4.6 4.7
22.0 3.7 3.5 3.0 2.4 3.2 2.5 4.3 3.7 3.8
24.0 2.8 2.6 2.3 1.7 2.4 1.7 3.4 2.9 3.0
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 045
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 045
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 045
3.0 27.0
4.0 26.5 12.8 23.0
5.0 25.5 11.7 22.0 9.3
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 045
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 22.0 9.0 18.0 6.3 18.6 6.7 21.5 18.2 17.9
7.0 21.5 8.2 17.3 5.8 17.9 6.2 20.5 17.5 17.2
8.0 21.0 7.6 16.6 5.3 17.3 5.7 20.0 16.9 16.5
9.0 19.8 7.0 16.0 4.9 16.7 5.3 19.3 16.3 15.8
10.0 17.0 6.6 14.2 4.5 15.2 4.9 16.7 15.0 14.5
11.0 14.7 6.2 12.3 4.1 13.1 4.5 14.6 13.1 12.7
12.0 12.8 5.9 10.8 3.8 11.4 4.2 12.8 11.5 11.2
13.0 11.3 5.6 9.5 3.5 10.0 3.9 11.4 10.2 10.0
14.0 10.0 5.3 8.3 3.2 8.8 3.6 10.1 9.0 8.9
15.0 8.9 5.1 7.4 2.9 7.8 3.4 9.1 8.1 7.9
16.0 7.9 4.9 6.5 2.7 6.9 3.1 8.2 7.2 7.1
18.0 6.2 4.4 5.1 2.3 5.4 2.7 6.6 5.8 5.8
20.0 4.8 4.1 4.0 1.9 4.2 2.4 5.4 4.6 4.7
22.0 3.7 3.5 3.0 1.6 3.2 2.1 4.3 3.7 3.8
24.0 2.8 2.6 2.3 1.3 2.4 1.7 3.4 2.9 3.0
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 055
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 055
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 055
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 055
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 28.0 20.0 22.5 11.8 25.0 15.8 24.5 24.0 18.1
8.0 23.5 19.3 19.5 11.5 21.0 15.2 22.5 20.5 18.1
9.0 19.8 16.2 16.5 11.1 17.7 14.7 19.3 17.4 16.6
10.0 17.0 13.5 14.2 10.8 15.2 13.1 16.7 15.0 14.5
11.0 14.7 11.5 12.3 9.7 13.1 11.0 14.6 13.1 12.7
12.0 12.8 9.9 10.8 8.2 11.4 9.3 12.8 11.5 11.2
13.0 11.3 8.6 9.5 7.0 10.0 8.0 11.4 10.2 10.0
14.0 10.0 7.6 8.3 6.0 8.8 6.9 10.1 9.0 8.9
15.0 8.9 6.7 7.4 5.2 7.8 5.9 9.1 8.1 7.9
16.0 7.9 5.8 6.5 4.4 6.9 5.1 8.2 7.2 7.1
18.0 6.2 4.7 5.1 3.2 5.4 3.8 6.6 5.8 5.8
20.0 4.8 3.6 4.0 2.3 4.2 2.8 5.4 4.6 4.7
22.0 3.7 2.9 3.0 1.5 3.2 2.0 4.3 3.7 3.8
24.0 2.8 2.2 2.3 0.9 2.4 1.3 3.4 2.9 3.0
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 026
3.0 90.0 79.0 63.0 50.0 50.0 63.0 50.0 49.5 35.0
4.0 74.5 62.5 63.0 50.0 44.5 54.0 50.0 43.5 31.0
5.0 53.5 44.0 45.5 47.0 40.5 39.0 41.5 39.5 28.0
6.0 39.5 33.0 34.5 35.5 36.5 30.0 32.0 33.5 25.0
7.0 31.0 26.0 27.5 28.5 29.5 24.0 26.0 27.5 23.0
8.0 25.0 20.5 22.0 23.0 24.0 19.1 21.0 22.5 21.0
9.0 19.5 16.5 17.7 18.8 19.7 15.5 17.3 18.7 18.9
10.0 15.3 13.5 14.6 15.7 16.5 12.8 14.5 15.9 16.1
3 058 026
6.0 28.5 30.5 24.5 27.0 26.5 21.0 21.5 24.5 24.0
7.0 23.0 25.0 22.5 22.0 24.0 19.3 20.0 21.0 19.4
8.0 18.5 20.5 20.0 18.2 19.9 17.4 18.6 17.7 16.1
9.0 15.3 17.2 18.4 15.3 16.9 16.2 16.0 15.1 13.5
10.0 12.8 14.6 15.8 13.0 14.5 14.7 13.9 13.0 11.4
11.0 10.8 12.6 13.7 11.1 12.6 12.8 12.1 11.2 9.7
12.0 9.2 10.9 12.0 9.6 11.0 11.3 10.7 9.8 8.3
13.0 7.8 9.5 10.6 8.3 9.7 9.9 9.5 8.6 7.2
14.0 6.7 8.3 9.4 7.2 8.6 8.8 8.4 7.6 6.2
15.0 5.7 7.3 8.4 6.3 7.7 7.9 7.5 6.7 5.3
16.0 4.9 6.5 7.5 5.5 6.8 7.0 6.7 5.9 4.5
18.0 3.5 5.0 5.9 4.1 5.5 5.6 5.4 4.6 3.2
20.0 2.3 3.7 4.6 3.0 4.4 4.5 4.4 3.5 2.2
22.0 1.4 2.7 3.6 2.1 3.4 3.6 3.5 2.7 1.3
24.0 1.9 2.7 1.4 2.6 2.8 2.7 1.9
3 058 026
3 058 036
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 036
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 036
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 036
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 30.5 21.0 22.5 12.1 27.0 16.3 26.5 24.5 18.1
7.0 25.0 20.0 20.5 11.8 22.0 15.8 24.0 21.0 18.1
8.0 20.5 18.6 16.9 11.5 18.2 15.2 19.9 17.7 16.9
9.0 17.2 15.6 14.2 11.1 15.3 13.5 16.9 15.1 14.4
10.0 14.7 13.3 12.2 10.8 13.0 11.5 14.5 13.0 12.5
11.0 12.6 11.4 10.5 9.3 11.2 9.8 12.6 11.2 10.9
12.0 11.0 9.9 9.1 8.0 9.6 8.4 11.0 9.8 9.6
13.0 9.6 8.6 7.9 6.9 8.4 7.2 9.7 8.6 8.4
14.0 8.4 7.5 6.9 5.9 7.3 6.2 8.6 7.6 7.5
15.0 7.4 6.6 6.0 5.1 6.3 5.3 7.7 6.7 6.6
16.0 6.5 5.8 5.2 4.4 5.5 4.6 6.8 5.9 5.9
18.0 5.1 4.4 3.9 3.1 4.2 3.3 5.5 4.6 4.6
20.0 3.8 3.3 2.9 2.1 3.1 2.2 4.4 3.5 3.6
22.0 2.8 2.4 2.0 1.3 2.2 1.4 3.4 2.7 2.8
24.0 1.9 1.7 1.3 1.4 2.6 1.9 2.1
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 046
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 046
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 046
3.0 27.0
4.0 23.0 26.5 12.8
5.0 22.0 9.3 25.5 11.7
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 046
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 22.0 9.0 18.0 6.3 18.6 6.7 21.5 18.2 17.9
7.0 21.5 8.2 17.3 5.8 17.9 6.2 20.5 17.5 17.2
8.0 20.5 7.6 16.6 5.3 17.3 5.7 19.9 16.9 16.5
9.0 17.2 7.0 14.2 4.9 15.3 5.3 16.9 15.1 14.4
10.0 14.7 6.6 12.2 4.5 13.0 4.9 14.5 13.0 12.5
11.0 12.6 6.2 10.5 4.1 11.2 4.5 12.6 11.2 10.9
12.0 11.0 5.9 9.1 3.8 9.6 4.2 11.0 9.8 9.6
13.0 9.6 5.6 7.9 3.5 8.4 3.9 9.7 8.6 8.4
14.0 8.4 5.3 6.9 3.2 7.3 3.6 8.6 7.6 7.5
15.0 7.4 5.1 6.0 2.9 6.3 3.4 7.7 6.7 6.6
16.0 6.5 4.9 5.2 2.7 5.5 3.1 6.8 5.9 5.9
18.0 5.1 4.4 3.9 2.3 4.2 2.7 5.5 4.6 4.6
20.0 3.8 3.3 2.9 1.9 3.1 2.2 4.4 3.5 3.6
22.0 2.8 2.4 2.0 1.3 2.2 1.4 3.4 2.7 2.8
24.0 1.9 1.7 1.3 1.4 2.6 1.9 2.1
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 056
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 056
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 056
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 056
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 30.5 21.0 22.5 12.1 27.0 16.3 26.5 24.5 18.1
7.0 25.0 20.0 20.5 11.8 22.0 15.8 24.0 21.0 18.1
8.0 20.5 18.6 16.9 11.5 18.2 15.2 19.9 17.7 16.9
9.0 17.2 15.6 14.2 11.1 15.3 13.5 16.9 15.1 14.4
10.0 14.7 13.3 12.2 10.8 13.0 11.5 14.5 13.0 12.5
11.0 12.6 11.4 10.5 9.3 11.2 9.8 12.6 11.2 10.9
12.0 11.0 9.9 9.1 8.0 9.6 8.4 11.0 9.8 9.6
13.0 9.6 8.6 7.9 6.9 8.4 7.2 9.7 8.6 8.4
14.0 8.4 7.5 6.9 5.9 7.3 6.2 8.6 7.6 7.5
15.0 7.4 6.6 6.0 5.1 6.3 5.3 7.7 6.7 6.6
16.0 6.5 5.8 5.2 4.4 5.5 4.6 6.8 5.9 5.9
18.0 5.1 4.4 3.9 3.1 4.2 3.3 5.5 4.6 4.6
20.0 3.8 3.3 2.9 2.1 3.1 2.2 4.4 3.5 3.6
22.0 2.8 2.4 2.0 1.3 2.2 1.4 3.4 2.7 2.8
24.0 1.9 1.7 1.3 1.4 2.6 1.9 2.1
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 060
3.0 86.0 79.0 63.0 50.0 50.0 63.0 50.0 49.5 35.0
4.0 71.0 70.5 63.0 50.0 44.5 63.0 50.0 43.5 31.0
5.0 60.0 59.5 60.5 50.0 40.5 60.0 50.0 39.5 28.0
6.0 52.0 51.5 52.0 47.5 37.0 51.0 46.5 35.0 25.0
7.0 45.5 44.0 45.0 43.5 34.5 41.5 42.5 32.0 23.0
8.0 38.0 36.5 37.5 38.5 31.5 34.5 36.5 29.0 21.0
9.0 31.0 30.5 31.5 32.5 29.5 29.5 31.0 27.0 19.7
10.0 26.0 25.5 26.5 27.0 27.5 25.5 27.0 25.0 18.1
3 058 060
6.0 48.0 39.0 24.5 37.0 26.5 21.0 21.5 24.5 26.0
7.0 40.0 36.0 22.5 37.0 24.5 19.3 20.0 24.5 26.0
8.0 33.5 33.0 20.0 33.0 22.5 17.4 18.6 24.0 26.0
9.0 29.0 30.5 18.8 28.5 21.0 16.2 17.4 22.5 25.0
10.0 25.5 27.0 17.3 25.0 19.3 14.9 16.2 21.0 23.5
11.0 22.0 24.0 16.2 22.5 18.2 13.8 15.0 19.8 20.5
12.0 19.7 21.5 15.1 19.9 17.0 12.7 13.9 18.6 18.5
13.0 17.4 18.8 14.2 17.9 16.1 11.9 13.2 17.7 16.6
14.0 15.4 16.7 13.3 16.2 15.3 11.2 12.5 16.3 15.0
15.0 13.6 14.9 12.4 14.5 14.4 10.5 11.8 14.9 13.6
16.0 12.1 13.4 11.9 13.0 13.7 10.0 11.1 13.6 12.4
18.0 9.8 11.0 10.8 10.6 11.7 9.1 10.1 11.2 10.1
20.0 7.9 9.1 9.7 8.7 9.8 8.1 9.2 9.4 8.3
22.0 6.4 7.6 8.4 7.3 8.3 7.3 8.5 7.9 6.8
24.0 5.2 6.4 7.2 6.1 7.1 6.6 7.3 6.7 5.6
3 058 060
3 058 070
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 070
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 070
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 070
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 33.0 19.3 22.5 11.5 29.0 15.2 22.5 24.0 18.1
9.0 30.5 18.7 22.5 11.1 28.5 14.7 21.0 22.5 18.0
10.0 27.0 18.0 21.5 10.8 25.0 14.2 19.3 21.0 17.0
11.0 24.0 17.4 20.5 10.4 22.5 13.6 18.2 19.8 16.1
12.0 21.5 16.8 19.2 10.1 19.9 13.0 17.0 18.6 15.2
13.0 18.8 16.1 17.3 9.8 17.9 12.5 16.1 17.7 14.4
14.0 16.7 15.4 15.7 9.5 16.2 12.0 15.3 16.3 13.6
15.0 15.0 14.4 14.2 9.2 14.5 11.4 14.4 14.9 12.7
16.0 13.5 13.2 13.0 8.8 13.0 10.9 13.7 13.6 12.2
18.0 11.1 10.8 10.7 8.1 10.6 10.1 11.7 11.2 11.2
20.0 9.2 9.0 8.8 7.3 8.8 8.3 9.8 9.4 9.6
22.0 7.7 7.5 7.4 6.5 7.3 6.9 8.3 7.9 8.2
24.0 6.5 6.3 6.2 5.8 6.1 5.7 7.1 6.7 6.9
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 080
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 080
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 080
3.0 27.0
4.0 26.5 12.8 23.0
5.0 25.5 11.7 22.0 9.3
36.0 2.3
38.0 1.8
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 080
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 22.0 9.0 18.0 6.3 18.6 6.7 21.5 18.2 17.9
7.0 21.5 8.2 17.3 5.8 17.9 6.2 20.5 17.5 17.2
8.0 21.0 7.6 16.6 5.3 17.3 5.7 20.0 16.9 16.5
9.0 20.5 7.0 16.0 4.9 16.7 5.3 19.4 16.3 15.8
10.0 19.9 6.6 15.4 4.5 16.2 4.9 18.9 15.7 15.3
11.0 19.4 6.2 14.9 4.1 15.8 4.5 18.2 15.2 14.7
12.0 19.1 5.9 14.4 3.8 15.3 4.2 17.0 14.7 14.2
13.0 18.7 5.6 14.0 3.5 15.0 3.9 16.1 14.3 13.8
14.0 16.7 5.3 13.6 3.2 14.6 3.6 15.3 13.9 13.3
15.0 15.0 5.1 13.2 2.9 14.3 3.4 14.4 13.5 12.7
16.0 13.5 4.9 12.9 2.7 13.0 3.1 13.7 13.2 12.2
18.0 11.1 4.4 10.7 2.3 10.6 2.7 11.7 11.2 11.2
20.0 9.2 4.1 8.8 1.9 8.8 2.4 9.8 9.4 9.6
22.0 7.7 3.8 7.4 1.6 7.3 2.1 8.3 7.9 8.2
24.0 6.5 3.5 6.2 1.3 6.1 1.8 7.1 6.7 6.9
36.0 2.7
38.0 2.3
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 090
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 090
36.0 2.7
38.0 2.3
40.0 1.9
42.0 1.5
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 090
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
36.0 2.3
38.0 1.8
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 090
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 33.0 19.3 22.5 11.5 29.0 15.2 22.5 24.0 18.1
9.0 30.5 16.2 22.5 11.1 28.5 14.7 21.0 22.5 18.0
10.0 27.0 13.5 21.5 10.8 25.0 13.1 19.3 21.0 17.0
11.0 24.0 11.5 20.5 9.7 22.5 11.0 18.2 19.8 16.1
12.0 21.5 9.9 19.2 8.2 19.9 9.3 17.0 18.6 15.2
13.0 18.8 8.6 17.3 7.0 17.9 8.0 16.1 17.7 14.4
14.0 16.7 7.6 15.7 6.0 16.2 6.9 15.3 16.3 13.6
15.0 15.0 6.7 14.2 5.2 14.5 5.9 14.4 14.9 12.7
16.0 13.5 5.8 13.0 4.4 13.0 5.1 13.7 13.6 12.2
18.0 11.1 4.7 10.7 3.2 10.6 3.8 11.7 11.2 11.2
20.0 9.2 3.6 8.8 2.3 8.8 2.8 9.8 9.4 9.6
22.0 7.7 2.9 7.4 1.5 7.3 2.0 8.3 7.9 8.2
24.0 6.5 2.2 6.2 0.9 6.1 1.3 7.1 6.7 6.9
36.0 2.7
38.0 2.3
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 061
3.0 84.5 79.0 63.0 50.0 50.0 63.0 50.0 49.5 35.0
4.0 70.0 69.0 63.0 50.0 44.5 63.0 50.0 43.5 31.0
5.0 59.0 58.5 59.0 50.0 40.5 55.0 50.0 39.5 28.0
6.0 51.0 46.0 47.5 47.5 37.0 43.0 45.0 35.0 25.0
7.0 41.0 37.0 38.5 39.5 34.5 35.0 36.5 32.0 23.0
8.0 32.5 30.5 31.5 32.5 31.5 29.0 31.0 29.0 21.0
9.0 26.5 25.5 26.5 27.5 28.0 24.5 26.5 27.0 19.7
10.0 22.0 21.0 22.0 23.0 23.5 21.5 23.0 24.0 18.1
3 058 061
6.0 41.0 39.0 24.5 37.0 26.5 21.0 21.5 24.5 26.0
7.0 34.0 35.5 22.5 33.0 24.5 19.3 20.0 24.5 26.0
8.0 28.5 30.0 20.0 28.0 22.5 17.4 18.6 24.0 26.0
9.0 24.5 26.0 18.8 24.0 21.0 16.2 17.4 22.5 22.5
10.0 21.0 22.5 17.3 21.0 19.3 14.9 16.2 21.0 19.5
11.0 18.4 20.0 16.2 18.6 18.2 13.8 15.0 18.6 17.2
12.0 16.2 17.8 15.1 16.5 17.0 12.7 13.9 16.6 15.2
13.0 14.4 15.7 14.2 14.8 16.1 11.9 13.2 14.9 13.6
14.0 12.6 13.9 13.3 13.3 14.6 11.2 12.5 13.5 12.2
15.0 11.1 12.4 12.4 11.9 13.1 10.5 11.8 12.3 11.0
16.0 9.8 11.1 11.9 10.6 11.7 10.0 11.1 11.2 9.9
18.0 7.7 8.9 9.8 8.5 9.6 9.1 9.8 9.2 8.1
20.0 6.1 7.3 8.1 6.9 8.0 8.1 8.2 7.6 6.5
22.0 4.8 6.0 6.8 5.6 6.7 6.8 6.9 6.3 5.2
24.0 3.8 4.9 5.7 4.6 5.6 5.7 5.8 5.2 4.2
3 058 061
3 058 071
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 071
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 071
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 071
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 30.0 19.3 22.5 11.5 28.0 15.2 22.5 24.0 18.1
9.0 26.0 18.7 22.5 11.1 24.0 14.7 21.0 22.5 18.0
10.0 23.0 18.0 20.0 10.8 21.0 14.2 19.3 21.0 17.0
11.0 20.0 17.4 17.9 10.4 18.6 13.6 18.2 18.6 16.1
12.0 17.9 16.8 15.9 10.1 16.6 13.0 17.0 16.6 15.2
13.0 15.8 15.0 14.3 9.8 14.8 12.5 16.1 14.9 14.4
14.0 14.0 13.5 12.8 9.5 13.3 12.0 14.6 13.5 13.3
15.0 12.4 12.2 11.6 9.2 12.0 11.0 13.1 12.3 12.1
16.0 11.1 10.9 10.5 8.8 10.7 9.9 11.7 11.2 11.1
18.0 9.0 8.8 8.6 8.0 8.6 8.1 9.6 9.2 9.3
20.0 7.4 7.1 7.0 6.6 7.0 6.5 8.0 7.6 7.8
22.0 6.1 5.9 5.7 5.4 5.7 5.2 6.7 6.3 6.5
24.0 5.0 4.8 4.7 4.3 4.6 4.2 5.6 5.2 5.5
36.0 1.8
38.0 1.4
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 081
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 081
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 081
3.0 27.0
4.0 26.5 12.8 23.0
5.0 25.5 11.7 22.0 9.3
36.0 1.3
38.0 0.9
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 081
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 22.0 9.0 18.0 6.3 18.6 6.7 21.5 18.2 17.9
7.0 21.5 8.2 17.3 5.8 17.9 6.2 20.5 17.5 17.2
8.0 21.0 7.6 16.6 5.3 17.3 5.7 20.0 16.9 16.5
9.0 20.5 7.0 16.0 4.9 16.7 5.3 19.4 16.3 15.8
10.0 19.9 6.6 15.4 4.5 16.2 4.9 18.9 15.7 15.3
11.0 19.4 6.2 14.9 4.1 15.8 4.5 18.2 15.2 14.7
12.0 17.9 5.9 14.4 3.8 15.3 4.2 17.0 14.7 14.2
13.0 15.8 5.6 14.0 3.5 14.8 3.9 16.1 14.3 13.8
14.0 14.0 5.3 12.8 3.2 13.3 3.6 14.6 13.5 13.3
15.0 12.4 5.1 11.6 2.9 12.0 3.4 13.1 12.3 12.1
16.0 11.1 4.9 10.5 2.7 10.7 3.1 11.7 11.2 11.1
18.0 9.0 4.4 8.6 2.3 8.6 2.7 9.6 9.2 9.3
20.0 7.4 4.1 7.0 1.9 7.0 2.4 8.0 7.6 7.8
22.0 6.1 3.8 5.7 1.6 5.7 2.1 6.7 6.3 6.5
24.0 5.0 3.5 4.7 1.3 4.6 1.8 5.6 5.2 5.5
36.0 1.8
38.0 1.4
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 091
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 091
36.0 1.8
38.0 1.4
40.0 1.0
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 091
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
36.0 1.3
38.0 0.9
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 091
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 33.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 30.0 19.3 22.5 11.5 28.0 15.2 22.5 24.0 18.1
9.0 26.0 16.2 22.5 11.1 24.0 14.7 21.0 22.5 18.0
10.0 23.0 13.5 20.0 10.8 21.0 13.1 19.3 21.0 17.0
11.0 20.0 11.5 17.9 9.7 18.6 11.0 18.2 18.6 16.1
12.0 17.9 9.9 15.9 8.2 16.6 9.3 17.0 16.6 15.2
13.0 15.8 8.6 14.3 7.0 14.8 8.0 16.1 14.9 14.4
14.0 14.0 7.6 12.8 6.0 13.3 6.9 14.6 13.5 13.3
15.0 12.4 6.7 11.6 5.2 12.0 5.9 13.1 12.3 12.1
16.0 11.1 5.8 10.5 4.4 10.7 5.1 11.7 11.2 11.1
18.0 9.0 4.7 8.6 3.2 8.6 3.8 9.6 9.2 9.3
20.0 7.4 3.6 7.0 2.3 7.0 2.8 8.0 7.6 7.8
22.0 6.1 2.9 5.7 1.5 5.7 2.0 6.7 6.3 6.5
24.0 5.0 2.2 4.7 0.9 4.6 1.3 5.6 5.2 5.5
36.0 1.8
38.0 1.4
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 062
3.0 83.5 79.0 63.0 50.0 50.0 63.0 50.0 49.5 35.0
4.0 69.0 68.5 63.0 50.0 44.5 63.0 50.0 43.5 31.0
5.0 58.5 54.0 55.0 50.0 40.5 49.5 50.0 39.5 28.0
6.0 47.0 41.0 42.5 43.5 37.0 38.5 40.5 35.0 25.0
7.0 37.0 33.0 34.0 35.0 34.5 31.0 33.0 32.0 23.0
8.0 29.0 27.0 28.0 29.0 30.0 26.0 27.5 28.5 21.0
9.0 23.5 22.5 23.5 24.5 25.0 22.0 23.5 24.5 19.7
10.0 19.2 18.5 19.5 20.5 21.0 18.6 20.0 21.5 18.1
3 058 062
6.0 36.5 38.5 24.5 35.5 26.5 21.0 21.5 24.5 26.0
7.0 30.0 32.0 22.5 29.5 24.5 19.3 20.0 24.5 26.0
8.0 25.0 27.0 20.0 25.0 22.5 17.4 18.6 24.0 23.0
9.0 21.5 23.0 18.8 21.5 21.0 16.2 17.4 21.0 19.7
10.0 18.5 20.0 17.3 18.6 19.3 14.9 16.2 18.5 17.1
11.0 16.1 17.7 16.2 16.4 17.7 13.8 15.0 16.4 15.0
12.0 14.1 15.7 15.1 14.5 15.8 12.7 13.9 14.6 13.3
13.0 12.5 13.9 14.2 12.9 14.2 11.9 13.2 13.1 11.8
14.0 10.9 12.2 13.1 11.5 12.8 11.2 12.5 11.8 10.5
15.0 9.5 10.8 11.7 10.3 11.5 10.5 11.4 10.7 9.4
16.0 8.3 9.6 10.5 9.2 10.3 10.0 10.4 9.7 8.4
18.0 6.5 7.7 8.5 7.3 8.4 8.5 8.6 7.9 6.7
20.0 5.0 6.2 7.0 5.8 6.9 7.0 7.1 6.5 5.4
22.0 3.8 5.0 5.8 4.6 5.7 5.8 5.9 5.3 4.2
24.0 2.9 4.0 4.8 3.7 4.7 4.8 4.9 4.3 3.3
3 058 062
3 058 072
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 072
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 072
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 072
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 32.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 27.0 19.3 22.5 11.5 25.0 15.2 22.5 24.0 18.1
9.0 23.0 18.7 20.5 11.1 21.5 14.7 21.0 21.0 18.0
10.0 20.0 18.0 17.8 10.8 18.7 14.2 19.3 18.5 17.0
11.0 17.8 16.6 15.7 10.4 16.4 13.6 17.7 16.4 16.0
12.0 15.8 14.8 13.9 10.1 14.5 13.0 15.8 14.6 14.3
13.0 13.9 13.2 12.4 9.8 12.9 11.8 14.2 13.1 12.9
14.0 12.3 11.8 11.1 9.5 11.6 10.5 12.8 11.8 11.6
15.0 10.9 10.6 10.0 9.2 10.4 9.4 11.5 10.7 10.6
16.0 9.7 9.4 9.0 8.2 9.2 8.4 10.3 9.7 9.6
18.0 7.8 7.5 7.4 6.6 7.3 6.8 8.4 7.9 8.0
20.0 6.3 6.0 5.9 5.4 5.9 5.4 6.9 6.5 6.7
22.0 5.1 4.9 4.7 4.3 4.7 4.3 5.7 5.3 5.5
24.0 4.1 3.9 3.8 3.4 3.7 3.3 4.7 4.3 4.6
36.0 1.2
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 082
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 082
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 082
3.0 27.0
4.0 26.5 12.8 23.0
5.0 25.5 11.7 22.0 9.3
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 082
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 22.0 9.0 18.0 6.3 18.6 6.7 21.5 18.2 17.9
7.0 21.5 8.2 17.3 5.8 17.9 6.2 20.5 17.5 17.2
8.0 21.0 7.6 16.6 5.3 17.3 5.7 20.0 16.9 16.5
9.0 20.5 7.0 16.0 4.9 16.7 5.3 19.4 16.3 15.8
10.0 19.9 6.6 15.4 4.5 16.2 4.9 18.9 15.7 15.3
11.0 17.8 6.2 14.9 4.1 15.8 4.5 17.7 15.2 14.7
12.0 15.8 5.9 13.9 3.8 14.5 4.2 15.8 14.6 14.2
13.0 13.9 5.6 12.4 3.5 12.9 3.9 14.2 13.1 12.9
14.0 12.3 5.3 11.1 3.2 11.6 3.6 12.8 11.8 11.6
15.0 10.9 5.1 10.0 2.9 10.4 3.4 11.5 10.7 10.6
16.0 9.7 4.9 9.0 2.7 9.2 3.1 10.3 9.7 9.6
18.0 7.8 4.4 7.4 2.3 7.3 2.7 8.4 7.9 8.0
20.0 6.3 4.1 5.9 1.9 5.9 2.4 6.9 6.5 6.7
22.0 5.1 3.8 4.7 1.6 4.7 2.1 5.7 5.3 5.5
24.0 4.1 3.5 3.8 1.3 3.7 1.8 4.7 4.3 4.6
36.0 1.2
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 092
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 092
36.0 1.2
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 092
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 092
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 33.0 21.0 22.5 12.1 29.0 16.3 26.5 24.5 18.1
7.0 32.0 20.0 22.5 11.8 29.0 15.8 24.5 24.5 18.1
8.0 27.0 19.3 22.5 11.5 25.0 15.2 22.5 24.0 18.1
9.0 23.0 16.2 20.5 11.1 21.5 14.7 21.0 21.0 18.0
10.0 20.0 13.5 17.8 10.8 18.7 13.1 19.3 18.5 17.0
11.0 17.8 11.5 15.7 9.7 16.4 11.0 17.7 16.4 16.0
12.0 15.8 9.9 13.9 8.2 14.5 9.3 15.8 14.6 14.3
13.0 13.9 8.6 12.4 7.0 12.9 8.0 14.2 13.1 12.9
14.0 12.3 7.6 11.1 6.0 11.6 6.9 12.8 11.8 11.6
15.0 10.9 6.7 10.0 5.2 10.4 5.9 11.5 10.7 10.6
16.0 9.7 5.8 9.0 4.4 9.2 5.1 10.3 9.7 9.6
18.0 7.8 4.7 7.4 3.2 7.3 3.8 8.4 7.9 8.0
20.0 6.3 3.6 5.9 2.3 5.9 2.8 6.9 6.5 6.7
22.0 5.1 2.9 4.7 1.5 4.7 2.0 5.7 5.3 5.5
24.0 4.1 2.2 3.8 0.9 3.7 1.3 4.7 4.3 4.6
36.0 1.2
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 063
3.0 81.5 79.0 63.0 50.0 50.0 63.0 50.0 49.5 35.0
4.0 67.0 56.0 58.0 50.0 44.5 50.0 50.0 43.5 31.0
5.0 46.5 39.5 41.0 42.5 40.5 36.5 38.5 39.5 28.0
6.0 34.5 30.0 31.5 32.5 33.5 28.0 30.0 31.5 25.0
7.0 27.0 23.5 25.0 26.0 26.5 22.5 24.0 25.5 23.0
8.0 21.0 19.0 20.0 21.0 22.0 18.2 19.8 21.0 21.0
9.0 16.6 15.6 16.7 17.6 18.3 15.1 16.7 17.9 18.1
10.0 13.4 12.8 13.7 14.5 15.1 12.7 14.1 15.4 15.5
3 058 063
6.0 27.0 29.0 24.5 26.0 26.5 21.0 21.5 24.5 23.5
7.0 22.0 23.5 22.5 21.5 23.0 19.3 20.0 21.0 19.5
8.0 18.0 19.8 20.0 18.0 19.5 17.4 18.6 17.8 16.3
9.0 15.1 16.8 17.9 15.3 16.7 16.2 16.2 15.3 13.8
10.0 12.8 14.4 15.5 13.1 14.5 14.7 14.1 13.3 11.8
11.0 10.9 12.5 13.6 11.4 12.7 12.9 12.4 11.6 10.2
12.0 9.4 11.0 12.0 9.9 11.2 11.4 11.0 10.2 8.8
13.0 8.1 9.6 10.6 8.6 9.9 10.1 9.8 9.0 7.7
14.0 7.0 8.5 9.3 7.6 8.9 9.0 8.7 8.0 6.7
15.0 6.0 7.4 8.2 6.7 7.9 8.1 7.8 7.1 5.8
16.0 5.1 6.4 7.3 5.9 7.1 7.3 7.1 6.3 5.0
18.0 3.7 4.9 5.7 4.5 5.6 5.7 5.7 5.0 3.7
20.0 2.5 3.7 4.5 3.4 4.4 4.5 4.6 3.9 2.7
22.0 1.6 2.8 3.6 2.4 3.5 3.6 3.7 3.1 1.9
24.0 2.0 2.8 1.7 2.7 2.8 2.9 2.3 1.2
3 058 063
3 058 073
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 073
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 073
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 073
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 29.0 21.0 22.5 12.1 26.0 16.3 26.5 24.5 18.1
7.0 23.5 20.0 20.5 11.8 21.5 15.8 23.0 21.0 18.1
8.0 19.8 18.3 17.1 11.5 18.0 15.2 19.5 17.8 17.2
9.0 16.9 15.6 14.6 11.1 15.3 13.9 16.7 15.3 14.9
10.0 14.5 13.4 12.5 10.8 13.2 11.9 14.5 13.3 12.9
11.0 12.6 11.7 10.9 9.9 11.4 10.2 12.7 11.6 11.4
12.0 11.0 10.2 9.5 8.6 9.9 8.9 11.2 10.2 10.0
13.0 9.7 8.9 8.3 7.5 8.7 7.7 9.9 9.0 8.9
14.0 8.5 7.9 7.3 6.5 7.6 6.7 8.9 8.0 7.9
15.0 7.4 6.9 6.4 5.7 6.7 5.8 7.9 7.1 7.1
16.0 6.5 6.1 5.7 4.9 5.9 5.1 7.1 6.3 6.3
18.0 5.0 4.7 4.4 3.7 4.5 3.8 5.6 5.0 5.1
20.0 3.8 3.6 3.3 2.7 3.4 2.8 4.4 3.9 4.0
22.0 2.9 2.7 2.5 1.9 2.5 1.9 3.5 3.1 3.2
24.0 2.1 1.9 1.8 1.2 1.7 1.2 2.7 2.3 2.5
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 083
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 083
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 083
3.0 27.0
4.0 26.5 12.8 23.0
5.0 25.5 11.7 22.0 9.3
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 083
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 22.0 9.0 18.0 6.3 18.6 6.7 21.5 18.2 17.9
7.0 21.5 8.2 17.3 5.8 17.9 6.2 20.5 17.5 17.2
8.0 19.8 7.6 16.6 5.3 17.3 5.7 19.5 16.9 16.5
9.0 16.9 7.0 14.6 4.9 15.3 5.3 16.7 15.3 14.9
10.0 14.5 6.6 12.5 4.5 13.2 4.9 14.5 13.3 12.9
11.0 12.6 6.2 10.9 4.1 11.4 4.5 12.7 11.6 11.4
12.0 11.0 5.9 9.5 3.8 9.9 4.2 11.2 10.2 10.0
13.0 9.7 5.6 8.3 3.5 8.7 3.9 9.9 9.0 8.9
14.0 8.5 5.3 7.3 3.2 7.6 3.6 8.9 8.0 7.9
15.0 7.4 5.1 6.4 2.9 6.7 3.4 7.9 7.1 7.1
16.0 6.5 4.9 5.7 2.7 5.9 3.1 7.1 6.3 6.3
18.0 5.0 4.4 4.4 2.3 4.5 2.7 5.6 5.0 5.1
20.0 3.8 3.6 3.3 1.9 3.4 2.4 4.4 3.9 4.0
22.0 2.9 2.7 2.5 1.6 2.5 1.9 3.5 3.1 3.2
24.0 2.1 1.9 1.8 1.2 1.7 1.2 2.7 2.3 2.5
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 093
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 093
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 093
3.0 35.0
4.0 35.0 27.5 30.0
5.0 35.0 26.0 28.5 15.5
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 093
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 29.0 21.0 22.5 12.1 26.0 16.3 26.5 24.5 18.1
7.0 23.5 20.0 20.5 11.8 21.5 15.8 23.0 21.0 18.1
8.0 19.8 18.3 17.1 11.5 18.0 15.2 19.5 17.8 17.2
9.0 16.9 15.6 14.6 11.1 15.3 13.9 16.7 15.3 14.9
10.0 14.5 13.4 12.5 10.8 13.2 11.9 14.5 13.3 12.9
11.0 12.6 11.5 10.9 9.7 11.4 10.2 12.7 11.6 11.4
12.0 11.0 9.9 9.5 8.2 9.9 8.9 11.2 10.2 10.0
13.0 9.7 8.6 8.3 7.0 8.7 7.7 9.9 9.0 8.9
14.0 8.5 7.6 7.3 6.0 7.6 6.7 8.9 8.0 7.9
15.0 7.4 6.7 6.4 5.2 6.7 5.8 7.9 7.1 7.1
16.0 6.5 5.8 5.7 4.4 5.9 5.1 7.1 6.3 6.3
18.0 5.0 4.7 4.4 3.2 4.5 3.8 5.6 5.0 5.1
20.0 3.8 3.6 3.3 2.3 3.4 2.8 4.4 3.9 4.0
22.0 2.9 2.7 2.5 1.5 2.5 1.9 3.5 3.1 3.2
24.0 2.1 1.9 1.8 0.9 1.7 1.2 2.7 2.3 2.5
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 064
3.0 80.5 62.0 63.0 50.0 50.0 51.5 50.0 49.5 35.0
4.0 50.5 40.5 42.0 43.5 44.5 35.5 37.5 39.5 31.0
5.0 35.5 29.0 30.5 32.0 32.5 26.5 28.5 30.0 28.0
6.0 26.5 22.0 23.5 24.5 25.5 20.5 22.0 23.5 24.0
7.0 21.0 17.4 18.5 19.6 20.5 16.3 17.9 19.3 19.5
8.0 16.9 13.9 15.0 16.0 16.7 13.2 14.7 16.0 16.2
9.0 13.4 11.3 12.3 13.3 14.0 10.8 12.3 13.6 13.7
10.0 10.6 9.2 10.2 11.2 11.9 8.9 10.4 11.6 11.7
3 058 064
6.0 19.5 21.5 22.5 18.9 20.5 20.5 19.2 18.2 16.7
7.0 15.8 17.6 18.7 15.6 17.1 17.3 16.2 15.2 13.7
8.0 13.0 14.7 15.8 13.0 14.5 14.7 13.8 12.9 11.5
9.0 10.8 12.5 13.5 11.0 12.4 12.6 11.9 11.1 9.6
10.0 9.1 10.7 11.7 9.4 10.8 11.0 10.4 9.5 8.2
11.0 7.6 9.2 10.2 8.0 9.4 9.6 9.1 8.3 6.9
12.0 6.4 8.0 9.0 6.9 8.2 8.4 8.0 7.2 5.9
13.0 5.4 6.9 7.9 5.9 7.2 7.4 7.1 6.3 5.0
14.0 4.5 6.0 7.0 5.1 6.4 6.6 6.3 5.5 4.2
15.0 3.8 5.3 6.2 4.4 5.6 5.8 5.6 4.8 3.5
16.0 3.1 4.6 5.5 3.8 5.0 5.2 4.9 4.2 2.9
18.0 2.0 3.5 4.4 2.7 3.9 4.1 3.9 3.2 1.9
20.0 1.2 2.6 3.4 1.8 3.0 3.2 3.0 2.3 1.1
22.0 1.7 2.5 1.1 2.3 2.5 2.4 1.6
24.0 1.1 1.8 1.7 1.9 1.8 1.1
3 058 064
3 058 074
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 074
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 074
3.0 35.0
4.0 35.0 27.5 30.0
5.0 29.0 26.0 24.5 15.5
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 074
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 21.5 19.3 17.4 12.1 18.9 16.3 20.5 18.2 17.2
7.0 17.6 15.9 14.5 11.8 15.6 13.8 17.1 15.2 14.5
8.0 14.8 13.4 12.2 10.8 13.1 11.5 14.5 12.9 12.4
9.0 12.5 11.3 10.3 9.1 11.1 9.7 12.4 11.1 10.7
10.0 10.7 9.7 8.8 7.8 9.4 8.2 10.8 9.5 9.3
11.0 9.3 8.3 7.6 6.6 8.1 7.0 9.4 8.3 8.1
12.0 8.0 7.2 6.5 5.6 7.0 5.9 8.2 7.2 7.1
13.0 7.0 6.2 5.6 4.8 6.0 5.0 7.2 6.3 6.2
14.0 6.1 5.4 4.8 4.1 5.2 4.2 6.4 5.5 5.5
15.0 5.3 4.7 4.2 3.4 4.4 3.6 5.6 4.8 4.8
16.0 4.6 4.0 3.6 2.8 3.8 3.0 5.0 4.2 4.2
18.0 3.5 2.9 2.5 1.9 2.7 2.0 3.9 3.2 3.2
20.0 2.6 2.1 1.7 1.1 1.9 1.1 3.0 2.3 2.4
22.0 1.8 1.4 1.0 1.2 2.3 1.6 1.8
24.0 1.1 1.7 1.1 1.2
26.0 1.2
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 084
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 084
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 084
3.0 27.0
4.0 26.5 12.8 23.0
5.0 25.5 11.7 22.0 9.3
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 084
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 21.5 9.0 17.4 6.3 18.6 6.7 20.5 18.2 17.2
7.0 17.6 8.2 14.5 5.8 15.6 6.2 17.1 15.2 14.5
8.0 14.8 7.6 12.2 5.3 13.1 5.7 14.5 12.9 12.4
9.0 12.5 7.0 10.3 4.9 11.1 5.3 12.4 11.1 10.7
10.0 10.7 6.6 8.8 4.5 9.4 4.9 10.8 9.5 9.3
11.0 9.3 6.2 7.6 4.1 8.1 4.5 9.4 8.3 8.1
12.0 8.0 5.9 6.5 3.8 7.0 4.2 8.2 7.2 7.1
13.0 7.0 5.6 5.6 3.5 6.0 3.9 7.2 6.3 6.2
14.0 6.1 5.3 4.8 3.2 5.2 3.6 6.4 5.5 5.5
15.0 5.3 4.7 4.2 2.9 4.4 3.4 5.6 4.8 4.8
16.0 4.6 4.0 3.6 2.7 3.8 3.0 5.0 4.2 4.2
18.0 3.5 2.9 2.5 1.9 2.7 2.0 3.9 3.2 3.2
20.0 2.6 2.1 1.7 1.1 1.9 1.1 3.0 2.3 2.4
22.0 1.8 1.4 1.0 1.2 2.3 1.6 1.8
24.0 1.1 1.7 1.1 1.2
26.0 1.2
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 094
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 094
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 094
3.0 35.0
4.0 35.0 27.5 30.0
5.0 29.0 26.0 24.5 15.5
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 094
Tel. sec. II 0.00-0.50 0.50-1.00 1.00 1.00 0.50 0.50 0.00-0.50 0.50 0.50
Tel. sec. III 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 1.00
Tel. sec. IV 0.50 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
6.0 21.5 19.3 17.4 12.1 18.9 16.3 20.5 18.2 17.2
7.0 17.6 15.9 14.5 11.8 15.6 13.8 17.1 15.2 14.5
8.0 14.8 13.4 12.2 10.8 13.1 11.5 14.5 12.9 12.4
9.0 12.5 11.3 10.3 9.1 11.1 9.7 12.4 11.1 10.7
10.0 10.7 9.7 8.8 7.8 9.4 8.2 10.8 9.5 9.3
11.0 9.3 8.3 7.6 6.6 8.1 7.0 9.4 8.3 8.1
12.0 8.0 7.2 6.5 5.6 7.0 5.9 8.2 7.2 7.1
13.0 7.0 6.2 5.6 4.8 6.0 5.0 7.2 6.3 6.2
14.0 6.1 5.4 4.8 4.1 5.2 4.2 6.4 5.5 5.5
15.0 5.3 4.7 4.2 3.4 4.4 3.6 5.6 4.8 4.8
16.0 4.6 4.0 3.6 2.8 3.8 3.0 5.0 4.2 4.2
18.0 3.5 2.9 2.5 1.9 2.7 2.0 3.9 3.2 3.2
20.0 2.6 2.1 1.7 1.1 1.9 1.1 3.0 2.3 2.4
22.0 1.8 1.4 1.0 1.2 2.3 1.6 1.8
24.0 1.1 1.7 1.1 1.2
26.0 1.2
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 065
3.0 72.0 54.5 56.5 50.0 50.0 45.5 48.0 49.5 35.0
4.0 44.0 35.5 37.0 38.5 39.5 31.0 33.0 35.0 31.0
5.0 31.0 25.0 26.5 28.0 28.5 23.0 24.5 26.0 26.5
6.0 23.0 18.9 20.0 21.5 22.0 17.4 19.2 20.5 21.0
7.0 17.9 14.6 15.8 16.8 17.6 13.7 15.4 16.7 16.9
8.0 14.3 11.5 12.6 13.6 14.4 10.9 12.5 13.8 14.0
9.0 11.3 9.2 10.2 11.2 11.9 8.8 10.3 11.6 11.7
10.0 8.8 7.3 8.4 9.3 10.0 7.1 8.6 9.8 10.0
3 058 075
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 085
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 095
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 066
3.0 63.0 47.0 49.0 50.0 50.0 39.0 41.5 43.5 35.0
4.0 38.0 30.0 31.5 33.0 34.0 26.5 28.5 30.5 30.5
5.0 26.5 21.5 22.5 24.0 25.0 19.2 21.0 22.5 23.0
6.0 19.5 15.7 16.9 18.0 18.9 14.5 16.3 17.7 17.9
7.0 14.9 11.9 13.1 14.1 14.9 11.2 12.9 14.2 14.4
8.0 11.7 9.2 10.3 11.3 12.0 8.8 10.3 11.6 11.8
9.0 9.3 7.1 8.2 9.1 9.8 6.9 8.4 9.6 9.8
10.0 7.0 5.5 6.5 7.4 8.1 5.4 6.9 8.1 8.2
3 058 076
• The above lifting capacity values are automatically monitored by the SLI.
• The boom must be extended / retracted to the required intermediate length before the load is lifted.
3 058 086
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 096
• The above lifting capacity values are not monitored by the SLI. However they are within the capacity values for
intermediate length, which are monitored by the SLI.
• The telescopable load depends on the angle of the boom and on how well the sliding wear pads between the
telescoping sections are lubricated.
3 058 017
12.80
Tel. sec. I 0.00
Tel. sec. II 0.00
Tel. sec. III 0.00
Tel. sec. IV 0.00
Slewing 360°
range
Radius in m Lifting capacities in t
3.0 17.1
4.0 11.3
5.0 7.6
6.0 4.7
7.0 2.5
3 058 100
Length of swingaway 11 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 13.9 12.8 11.0 11.9 13.5 10.3 10.9 5.9 8.5 7.2
12.0 13.3 12.3 10.6 11.9 13.2 10.2 10.9 5.9 8.5 7.2
13.0 12.9 11.8 10.2 11.9 12.9 9.9 10.9 5.9 8.5 7.2
14.0 12.5 11.3 9.7 11.7 12.5 9.6 10.9 5.9 8.5 7.2
15.0 12.2 10.8 9.3 11.3 12.2 9.3 10.9 5.9 8.5 7.2
16.0 11.8 10.3 8.8 10.8 11.9 8.9 10.9 5.9 8.5 7.2
18.0 11.1 9.4 7.9 9.9 11.2 8.1 10.4 5.9 8.3 7.2
20.0 10.3 8.4 7.0 9.0 10.6 7.3 9.7 5.9 7.9 7.2
22.0 9.6 7.4 6.1 8.1 9.9 6.5 9.1 5.9 7.6 7.2
24.0 9.1 6.9 5.7 7.5 9.1 6.0 8.3 5.9 7.2 6.8
26.0 8.7 6.4 5.3 7.0 8.4 5.6 7.6 5.9 6.8 6.3
28.0 7.9 5.9 4.9 6.5 7.4 5.1 6.9 5.7 6.4 5.8
30.0 7.0 5.3 4.5 5.9 6.4 4.7 6.1 5.1 5.7 5.3
32.0 6.2 4.8 4.1 5.4 5.6 4.2 5.4 4.6 5.1 4.9
34.0 5.5 4.6 3.9 5.1 4.9 3.9 4.8 4.3 4.7 4.6
36.0 4.9 4.3 3.7 4.9 4.3 3.7 4.2 4.1 4.3 4.3
38.0 4.3 4.1 3.4 4.5 3.8 3.4 3.7 3.8 3.8 3.9
40.0 3.2 4.0 3.3 3.1 3.2 3.5 3.3 3.5
42.0 3.0 3.6 2.8 2.9 2.7 3.2 2.8 3.0
44.0 2.8 3.2 2.4 2.7 2.3 3.1 2.4 2.6
3 058 100
Length of swingaway 11 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
56.0 0.9
58.0 0.7
SLI Code 720
Max.
10 m/s 8 m/s
permitted
windspeed
3 058 101
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
16.0 8.8 8.4 8.2 8.6 8.9 8.2 8.8 7.3 8.5 7.4
18.0 8.5 7.9 7.5 8.1 8.6 7.6 8.6 7.3 8.3 7.3
20.0 8.1 7.3 6.8 7.7 8.3 7.0 8.3 7.2 8.0 7.0
22.0 7.8 6.8 6.1 7.2 8.0 6.4 8.0 6.6 7.8 6.7
24.0 7.5 6.2 5.5 6.7 7.7 5.8 7.7 6.1 7.6 6.3
26.0 7.2 5.9 5.1 6.4 7.3 5.4 7.2 5.7 7.0 6.0
28.0 7.0 5.5 4.8 6.0 6.9 5.1 6.7 5.4 6.5 5.6
30.0 6.7 5.2 4.5 5.7 6.5 4.7 6.1 5.0 5.9 5.2
32.0 6.5 4.8 4.1 5.3 6.0 4.3 5.6 4.7 5.4 4.9
34.0 5.7 4.5 3.8 4.9 5.2 4.0 5.1 4.3 4.8 4.6
36.0 5.0 4.3 3.6 4.7 4.6 3.7 4.5 4.1 4.5 4.3
38.0 4.4 4.1 3.4 4.5 4.0 3.5 3.9 3.8 4.1 4.0
40.0 3.2 4.2 3.4 3.3 3.4 3.6 3.5 3.7
42.0 3.0 3.7 3.0 3.0 2.9 3.3 3.1 3.3
44.0 2.8 2.5 3.1 2.6 2.9
56.0 1.0
3 058 102
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
18.0 7.0 6.9 6.6 7.0 7.1 7.0 7.0 6.6 7.0 6.5
20.0 6.8 6.7 6.2 6.8 6.8 6.6 6.8 6.4 6.8 6.3
22.0 6.6 6.4 5.8 6.6 6.6 6.2 6.6 6.2 6.6 6.1
24.0 6.4 6.2 5.5 6.4 6.4 5.8 6.4 6.0 6.4 5.9
26.0 6.4 5.9 5.1 6.1 6.3 5.4 6.2 5.7 6.1 5.7
28.0 6.4 5.5 4.8 5.8 6.2 5.1 5.9 5.4 5.8 5.5
30.0 6.4 5.2 4.5 5.5 6.0 4.7 5.7 5.1 5.5 5.2
32.0 6.4 4.9 4.2 5.3 5.9 4.4 5.5 4.7 5.3 4.9
34.0 3.8 5.0 5.4 4.1 5.2 4.4 5.0 4.7
36.0 3.6 4.8 4.7 3.8 4.7 4.2 4.7 4.4
48.0 2.2
3 058 103
Length of swingaway 18 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 6.8 6.4 5.8 6.2 6.4 5.6 6.0 3.8 5.4 4.7
12.0 6.7 6.3 5.8 6.1 6.3 5.5 5.9 3.8 5.4 4.7
13.0 6.5 6.2 5.7 6.0 6.3 5.5 5.9 3.8 5.4 4.7
14.0 6.4 6.1 5.7 6.0 6.2 5.5 5.8 3.8 5.3 4.7
15.0 6.3 6.1 5.6 5.9 6.1 5.4 5.8 3.8 5.3 4.7
16.0 6.2 6.0 5.6 5.9 6.0 5.4 5.7 3.8 5.3 4.7
18.0 5.9 5.7 5.5 5.7 5.9 5.3 5.6 3.8 5.2 4.7
20.0 5.7 5.5 5.3 5.6 5.7 5.2 5.5 3.8 5.1 4.7
22.0 5.5 5.3 5.1 5.4 5.6 5.1 5.4 3.8 5.1 4.6
24.0 5.2 5.1 5.0 5.3 5.4 5.1 5.3 3.8 5.0 4.6
26.0 5.0 4.9 4.7 5.1 5.2 4.8 5.2 3.8 4.9 4.6
28.0 4.8 4.6 4.3 4.9 5.0 4.5 5.0 3.8 4.9 4.5
30.0 4.6 4.4 4.0 4.7 4.8 4.3 4.8 3.8 4.8 4.5
32.0 4.3 4.2 3.7 4.5 4.6 4.0 4.7 3.8 4.6 4.4
34.0 4.1 4.0 3.4 4.3 4.3 3.7 4.5 3.8 4.5 4.2
36.0 4.0 3.8 3.2 4.1 4.2 3.5 4.3 3.7 4.2 3.9
38.0 3.9 3.6 3.0 3.9 4.1 3.2 4.0 3.5 3.9 3.7
40.0 3.8 3.4 2.8 3.7 3.8 3.0 3.6 3.3 3.7 3.5
42.0 3.6 3.2 2.6 3.5 3.3 2.8 3.2 3.0 3.2 3.3
44.0 3.5 3.0 2.5 3.3 2.9 2.5 2.8 2.8 2.8 3.0
46.0 3.1 2.9 2.3 3.1 2.6 2.4 2.4 2.7 2.5 2.6
48.0 2.2 2.9 2.2 2.2 2.1 2.5 2.1 2.3
50.0 2.1 2.6 1.9 2.1 1.8 2.3 1.8 2.0
52.0 1.9 1.5 2.1 1.6 1.7
SLI Code 730
Max.
10 m/s 8 m/s
permitted
windspeed
3 058 103
Length of swingaway 18 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
3 058 104
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
20.0 4.6 4.5 4.5 4.6 4.7 4.5 4.6 4.5 4.6 4.3
22.0 4.4 4.4 4.4 4.4 4.5 4.4 4.5 4.4 4.4 4.2
24.0 4.2 4.2 4.2 4.3 4.3 4.2 4.3 4.2 4.3 4.1
26.0 4.1 4.0 4.0 4.1 4.2 4.1 4.2 4.1 4.2 4.1
28.0 4.0 3.9 3.9 4.0 4.1 4.0 4.1 4.0 4.1 4.0
30.0 3.8 3.8 3.7 3.9 3.9 3.9 4.0 3.9 4.0 3.9
32.0 3.7 3.7 3.6 3.8 3.8 3.8 3.9 3.9 3.9 3.8
34.0 3.6 3.6 3.4 3.7 3.7 3.6 3.8 3.8 3.8 3.7
36.0 3.6 3.4 3.2 3.6 3.6 3.4 3.7 3.6 3.7 3.6
38.0 3.6 3.3 3.0 3.5 3.6 3.2 3.6 3.4 3.6 3.5
40.0 3.5 3.2 2.9 3.4 3.5 3.0 3.6 3.3 3.5 3.4
42.0 3.5 3.1 2.7 3.3 3.4 2.9 3.5 3.1 3.4 3.2
44.0 3.5 3.0 2.5 3.3 3.2 2.7 3.1 2.9 3.2 3.1
46.0 2.4 3.1 2.8 2.5 2.7 2.8 2.8 2.9
48.0 2.2 3.0 2.4 2.3 2.4 2.6 2.5 2.6
60.0 0.9
62.0 0.7
3 058 105
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
28.0 3.5 3.5 3.5 3.5 3.5 3.5 3.6 3.5 3.6 3.5
30.0 3.5 3.4 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
32.0 3.4 3.4 3.4 3.4 3.4 3.4 3.5 3.4 3.5 3.4
34.0 3.3 3.3 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4
36.0 3.3 3.3 3.2 3.4 3.4 3.3 3.4 3.3 3.4 3.4
38.0 3.3 3.2 3.0 3.3 3.4 3.1 3.4 3.2 3.4 3.3
40.0 3.3 3.2 2.9 3.3 3.4 3.0 3.3 3.1 3.3 3.3
42.0 2.7 3.3 3.4 2.9 3.3 3.1 3.3 3.2
44.0 2.5 3.3 3.4 2.8 3.3 3.0 3.3 3.1
46.0 2.6 2.9 2.8 3.0 2.9
3 058 120
Length of swingaway 11 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 13.9 12.8 11.0 11.9 13.5 10.3 10.9 5.9 8.5 7.2
12.0 13.3 12.3 10.6 11.9 13.2 10.2 10.9 5.9 8.5 7.2
13.0 12.9 11.8 10.2 11.9 12.9 9.9 10.9 5.9 8.5 7.2
14.0 12.5 11.3 9.7 11.7 12.5 9.6 10.9 5.9 8.5 7.2
15.0 12.2 10.8 9.3 11.3 12.2 9.3 10.9 5.9 8.5 7.2
16.0 11.8 10.3 8.8 10.8 11.9 8.9 10.9 5.9 8.5 7.2
18.0 11.1 9.4 7.9 9.9 11.2 8.1 10.4 5.9 8.3 7.2
20.0 10.3 8.4 7.0 9.0 10.6 7.3 9.7 5.9 7.9 7.2
22.0 9.6 7.4 6.1 8.1 9.5 6.5 9.1 5.9 7.6 7.2
24.0 8.7 6.9 5.7 7.5 8.1 6.0 8.0 5.9 7.2 6.8
26.0 7.5 6.4 5.3 7.0 7.0 5.6 6.9 5.9 6.8 6.3
28.0 6.6 5.9 4.9 6.5 6.0 5.1 5.9 5.7 6.0 5.8
30.0 5.7 5.3 4.5 5.9 5.1 4.7 5.0 5.1 5.1 5.3
32.0 5.0 4.8 4.1 5.2 4.4 4.2 4.3 4.6 4.4 4.6
34.0 4.4 4.6 3.9 4.6 3.8 3.9 3.7 4.3 3.8 4.0
36.0 3.8 4.3 3.7 4.0 3.3 3.7 3.2 3.9 3.3 3.5
38.0 3.3 4.0 3.4 3.5 2.8 3.4 2.7 3.4 2.8 3.0
40.0 3.2 3.1 2.3 3.1 2.2 3.0 2.3 2.5
42.0 3.0 2.7 1.9 2.8 1.8 2.6 1.9 2.2
44.0 2.8 2.4 1.6 2.5 1.5 2.2 1.6 1.8
3 058 120
Length of swingaway 11 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
3 058 121
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
16.0 8.8 8.4 8.2 8.6 8.9 8.2 8.8 7.3 8.5 7.4
18.0 8.5 7.9 7.5 8.1 8.6 7.6 8.6 7.3 8.3 7.3
20.0 8.1 7.3 6.8 7.7 8.3 7.0 8.3 7.2 8.0 7.0
22.0 7.8 6.8 6.1 7.2 8.0 6.4 8.0 6.6 7.8 6.7
24.0 7.5 6.2 5.5 6.7 7.7 5.8 7.7 6.1 7.6 6.3
26.0 7.2 5.9 5.1 6.4 7.3 5.4 7.2 5.7 7.0 6.0
28.0 6.9 5.5 4.8 6.0 6.4 5.1 6.4 5.4 6.5 5.6
30.0 6.0 5.2 4.5 5.7 5.6 4.7 5.5 5.0 5.6 5.2
32.0 5.3 4.8 4.1 5.3 4.8 4.3 4.7 4.7 4.8 4.9
34.0 4.6 4.5 3.8 4.9 4.1 4.0 4.1 4.3 4.2 4.4
36.0 4.0 4.3 3.6 4.3 3.5 3.7 3.5 4.1 3.6 3.8
38.0 3.4 4.1 3.4 3.7 3.0 3.5 2.9 3.7 3.1 3.3
40.0 3.2 3.3 2.5 3.3 2.5 3.2 2.6 2.8
42.0 3.0 2.8 2.1 3.0 2.0 2.8 2.2 2.4
44.0 2.6 1.7 2.4 1.8 2.0
3 058 122
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
18.0 7.0 6.9 6.6 7.0 7.1 7.0 7.0 6.6 7.0 6.5
20.0 6.8 6.7 6.2 6.8 6.8 6.6 6.8 6.4 6.8 6.3
22.0 6.6 6.4 5.8 6.6 6.6 6.2 6.6 6.2 6.6 6.1
24.0 6.4 6.2 5.5 6.4 6.4 5.8 6.4 6.0 6.4 5.9
26.0 6.4 5.9 5.1 6.1 6.3 5.4 6.2 5.7 6.1 5.7
28.0 6.4 5.5 4.8 5.8 6.2 5.1 5.9 5.4 5.8 5.5
30.0 6.3 5.2 4.5 5.5 5.8 4.7 5.7 5.1 5.5 5.2
32.0 5.4 4.9 4.2 5.3 5.0 4.4 5.0 4.7 5.1 4.9
34.0 3.8 5.0 4.3 4.1 4.3 4.4 4.4 4.7
36.0 3.6 4.4 3.7 3.8 3.7 4.2 3.8 4.1
48.0 1.5
3 058 123
Length of swingaway 18 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 6.8 6.4 5.8 6.2 6.4 5.6 6.0 3.8 5.4 4.7
12.0 6.7 6.3 5.8 6.1 6.3 5.5 5.9 3.8 5.4 4.7
13.0 6.5 6.2 5.7 6.0 6.3 5.5 5.9 3.8 5.4 4.7
14.0 6.4 6.1 5.7 6.0 6.2 5.5 5.8 3.8 5.3 4.7
15.0 6.3 6.1 5.6 5.9 6.1 5.4 5.8 3.8 5.3 4.7
16.0 6.2 6.0 5.6 5.9 6.0 5.4 5.7 3.8 5.3 4.7
18.0 5.9 5.7 5.5 5.7 5.9 5.3 5.6 3.8 5.2 4.7
20.0 5.7 5.5 5.3 5.6 5.7 5.2 5.5 3.8 5.1 4.7
22.0 5.5 5.3 5.1 5.4 5.6 5.1 5.4 3.8 5.1 4.6
24.0 5.2 5.1 5.0 5.3 5.4 5.1 5.3 3.8 5.0 4.6
26.0 5.0 4.9 4.7 5.1 5.2 4.8 5.2 3.8 4.9 4.6
28.0 4.8 4.6 4.3 4.9 5.0 4.5 5.0 3.8 4.9 4.5
30.0 4.6 4.4 4.0 4.7 4.8 4.3 4.8 3.8 4.8 4.5
32.0 4.3 4.2 3.7 4.5 4.6 4.0 4.7 3.8 4.6 4.4
34.0 4.1 4.0 3.4 4.3 4.3 3.7 4.2 3.8 4.2 4.2
36.0 4.0 3.8 3.2 4.1 3.8 3.5 3.6 3.7 3.7 3.8
38.0 3.8 3.6 3.0 3.9 3.3 3.2 3.1 3.5 3.2 3.3
40.0 3.4 3.4 2.8 3.5 2.8 3.0 2.7 3.3 2.7 2.9
42.0 3.0 3.2 2.6 3.1 2.4 2.8 2.3 2.9 2.3 2.5
44.0 2.6 3.0 2.5 2.8 2.1 2.5 1.9 2.5 2.0 2.1
46.0 2.3 2.9 2.3 2.4 1.8 2.4 1.6 2.2 1.7 1.8
48.0 2.2 2.1 1.5 2.2 1.3 1.9 1.4 1.5
50.0 2.1 1.9 1.2 1.9 1.1 1.7 1.1 1.2
52.0 1.7 0.8 1.4 0.9 1.0
SLI Code 630
Max.
10 m/s 8 m/s
permitted
windspeed
3 058 123
Length of swingaway 18 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
56.0 1.0
58.0 0.8
SLI Code 630
Max.
10 m/s 8 m/s
permitted
windspeed
3 058 124
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
20.0 4.6 4.5 4.5 4.6 4.7 4.5 4.6 4.5 4.6 4.3
22.0 4.4 4.4 4.4 4.4 4.5 4.4 4.5 4.4 4.4 4.2
24.0 4.2 4.2 4.2 4.3 4.3 4.2 4.3 4.2 4.3 4.1
26.0 4.1 4.0 4.0 4.1 4.2 4.1 4.2 4.1 4.2 4.1
28.0 4.0 3.9 3.9 4.0 4.1 4.0 4.1 4.0 4.1 4.0
30.0 3.8 3.8 3.7 3.9 3.9 3.9 4.0 3.9 4.0 3.9
32.0 3.7 3.7 3.6 3.8 3.8 3.8 3.9 3.9 3.9 3.8
34.0 3.6 3.6 3.4 3.7 3.7 3.6 3.8 3.8 3.8 3.7
36.0 3.6 3.4 3.2 3.6 3.6 3.4 3.7 3.6 3.7 3.6
38.0 3.6 3.3 3.0 3.5 3.6 3.2 3.6 3.4 3.6 3.5
40.0 3.5 3.2 2.9 3.4 3.2 3.0 3.1 3.3 3.2 3.4
42.0 3.2 3.1 2.7 3.3 2.8 2.9 2.7 3.1 2.8 2.9
44.0 2.8 3.0 2.5 3.0 2.4 2.7 2.3 2.9 2.4 2.5
46.0 2.4 2.6 2.0 2.5 1.9 2.5 2.0 2.2
48.0 2.2 2.3 1.7 2.3 1.6 2.2 1.7 1.9
3 058 125
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
28.0 3.5 3.5 3.5 3.5 3.5 3.5 3.6 3.5 3.6 3.5
30.0 3.5 3.4 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
32.0 3.4 3.4 3.4 3.4 3.4 3.4 3.5 3.4 3.5 3.4
34.0 3.3 3.3 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4
36.0 3.3 3.3 3.2 3.4 3.4 3.3 3.4 3.3 3.4 3.4
38.0 3.3 3.2 3.0 3.3 3.4 3.1 3.4 3.2 3.4 3.3
40.0 3.3 3.2 2.9 3.3 3.4 3.0 3.3 3.1 3.3 3.3
42.0 2.7 3.3 3.0 2.9 3.0 3.1 3.1 3.2
44.0 2.5 3.1 2.5 2.8 2.5 3.0 2.6 2.8
46.0 2.6 2.1 2.7 2.2 2.4
3 058 140
Length of swingaway 11 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 13.9 12.8 11.0 11.9 13.5 10.3 10.9 5.9 8.5 7.2
12.0 13.3 12.3 10.6 11.9 13.2 10.2 10.9 5.9 8.5 7.2
13.0 12.9 11.8 10.2 11.9 12.9 9.9 10.9 5.9 8.5 7.2
14.0 12.5 11.3 9.7 11.7 12.5 9.6 10.9 5.9 8.5 7.2
15.0 12.2 10.8 9.3 11.3 12.2 9.3 10.9 5.9 8.5 7.2
16.0 11.8 10.3 8.8 10.8 11.9 8.9 10.9 5.9 8.5 7.2
18.0 11.1 9.4 7.9 9.9 11.2 8.1 10.4 5.9 8.3 7.2
20.0 10.3 8.4 7.0 9.0 9.9 7.3 9.5 5.9 7.9 7.2
22.0 9.0 7.4 6.1 8.1 8.4 6.5 8.2 5.9 7.6 7.2
24.0 7.7 6.9 5.7 7.5 7.1 6.0 7.0 5.9 6.9 6.8
26.0 6.6 6.4 5.3 6.9 6.0 5.6 5.9 5.9 6.0 6.1
28.0 5.7 5.9 4.9 6.0 5.1 5.1 5.0 5.7 5.1 5.3
30.0 4.9 5.3 4.5 5.2 4.4 4.7 4.3 5.0 4.4 4.6
32.0 4.3 4.8 4.1 4.5 3.7 4.2 3.6 4.4 3.7 3.9
34.0 3.7 4.4 3.9 3.9 3.1 3.9 3.0 3.8 3.1 3.3
36.0 3.2 3.9 3.7 3.4 2.6 3.5 2.5 3.3 2.6 2.8
38.0 2.7 3.4 3.4 2.9 2.1 3.0 2.0 2.8 2.1 2.4
40.0 3.0 2.5 1.7 2.6 1.6 2.4 1.7 1.9
42.0 2.6 2.1 1.4 2.3 1.3 2.0 1.4 1.6
44.0 2.3 1.8 1.0 1.9 0.9 1.7 1.0 1.2
3 058 141
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
16.0 8.8 8.4 8.2 8.6 8.9 8.2 8.8 7.3 8.5 7.4
18.0 8.5 7.9 7.5 8.1 8.6 7.6 8.6 7.3 8.3 7.3
20.0 8.1 7.3 6.8 7.7 8.3 7.0 8.3 7.2 8.0 7.0
22.0 7.8 6.8 6.1 7.2 8.0 6.4 8.0 6.6 7.8 6.7
24.0 7.5 6.2 5.5 6.7 7.7 5.8 7.7 6.1 7.6 6.3
26.0 7.1 5.9 5.1 6.4 6.6 5.4 6.5 5.7 6.6 6.0
28.0 6.1 5.5 4.8 6.0 5.6 5.1 5.5 5.4 5.7 5.6
30.0 5.3 5.2 4.5 5.5 4.8 4.7 4.7 5.0 4.8 5.0
32.0 4.5 4.8 4.1 4.8 4.1 4.3 4.0 4.7 4.1 4.3
34.0 3.9 4.5 3.8 4.2 3.4 4.0 3.4 4.1 3.5 3.7
36.0 3.3 4.0 3.6 3.6 2.9 3.7 2.8 3.6 2.9 3.2
38.0 2.8 3.5 3.4 3.1 2.4 3.3 2.3 3.1 2.4 2.7
40.0 3.1 2.7 1.9 2.8 1.9 2.6 2.0 2.2
42.0 2.7 2.3 1.5 2.4 1.5 2.2 1.6 1.8
44.0 2.1 1.1 1.9 1.2 1.5
3 058 142
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
18.0 7.0 6.9 6.6 7.0 7.1 7.0 7.0 6.6 7.0 6.5
20.0 6.8 6.7 6.2 6.8 6.8 6.6 6.8 6.4 6.8 6.3
22.0 6.6 6.4 5.8 6.6 6.6 6.2 6.6 6.2 6.6 6.1
24.0 6.4 6.2 5.5 6.4 6.4 5.8 6.4 6.0 6.4 5.9
26.0 6.4 5.9 5.1 6.1 6.3 5.4 6.2 5.7 6.1 5.7
28.0 6.4 5.5 4.8 5.8 6.0 5.1 5.9 5.4 5.8 5.5
30.0 5.5 5.2 4.5 5.5 5.1 4.7 5.0 5.1 5.2 5.2
32.0 4.7 4.9 4.2 5.0 4.3 4.4 4.3 4.7 4.4 4.7
34.0 3.8 4.3 3.6 4.1 3.6 4.3 3.8 4.0
36.0 3.6 3.7 3.0 3.8 3.0 3.8 3.2 3.4
48.0 0.9
3 058 143
Length of swingaway 18 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 6.8 6.4 5.8 6.2 6.4 5.6 6.0 3.8 5.4 4.7
12.0 6.7 6.3 5.8 6.1 6.3 5.5 5.9 3.8 5.4 4.7
13.0 6.5 6.2 5.7 6.0 6.3 5.5 5.9 3.8 5.4 4.7
14.0 6.4 6.1 5.7 6.0 6.2 5.5 5.8 3.8 5.3 4.7
15.0 6.3 6.1 5.6 5.9 6.1 5.4 5.8 3.8 5.3 4.7
16.0 6.2 6.0 5.6 5.9 6.0 5.4 5.7 3.8 5.3 4.7
18.0 5.9 5.7 5.5 5.7 5.9 5.3 5.6 3.8 5.2 4.7
20.0 5.7 5.5 5.3 5.6 5.7 5.2 5.5 3.8 5.1 4.7
22.0 5.5 5.3 5.1 5.4 5.6 5.1 5.4 3.8 5.1 4.6
24.0 5.2 5.1 5.0 5.3 5.4 5.1 5.3 3.8 5.0 4.6
26.0 5.0 4.9 4.7 5.1 5.2 4.8 5.2 3.8 4.9 4.6
28.0 4.8 4.6 4.3 4.9 5.0 4.5 5.0 3.8 4.9 4.5
30.0 4.6 4.4 4.0 4.7 4.8 4.3 4.8 3.8 4.8 4.5
32.0 4.3 4.2 3.7 4.5 4.2 4.0 4.1 3.8 4.1 4.2
34.0 4.1 4.0 3.4 4.3 3.7 3.7 3.5 3.8 3.5 3.7
36.0 3.7 3.8 3.2 3.8 3.1 3.5 3.0 3.6 3.0 3.2
38.0 3.2 3.6 3.0 3.4 2.7 3.2 2.5 3.1 2.6 2.7
40.0 2.8 3.4 2.8 2.9 2.3 3.0 2.1 2.7 2.1 2.3
42.0 2.4 3.0 2.6 2.6 1.9 2.6 1.7 2.3 1.8 1.9
44.0 2.1 2.7 2.5 2.2 1.5 2.3 1.4 2.0 1.4 1.6
46.0 1.8 2.4 2.3 1.9 1.2 2.0 1.1 1.7 1.1 1.3
48.0 2.0 1.6 1.0 1.7 0.8 1.4 0.9 1.0
50.0 1.8 1.4 0.7 1.4 1.2 0.8
52.0 1.2 0.9
54.0 1.0 0.7
3 058 144
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
20.0 4.6 4.5 4.5 4.6 4.7 4.5 4.6 4.5 4.6 4.3
22.0 4.4 4.4 4.4 4.4 4.5 4.4 4.5 4.4 4.4 4.2
24.0 4.2 4.2 4.2 4.3 4.3 4.2 4.3 4.2 4.3 4.1
26.0 4.1 4.0 4.0 4.1 4.2 4.1 4.2 4.1 4.2 4.1
28.0 4.0 3.9 3.9 4.0 4.1 4.0 4.1 4.0 4.1 4.0
30.0 3.8 3.8 3.7 3.9 3.9 3.9 4.0 3.9 4.0 3.9
32.0 3.7 3.7 3.6 3.8 3.8 3.8 3.9 3.9 3.9 3.8
34.0 3.6 3.6 3.4 3.7 3.7 3.6 3.8 3.8 3.8 3.7
36.0 3.6 3.4 3.2 3.6 3.6 3.4 3.6 3.6 3.6 3.6
38.0 3.6 3.3 3.0 3.5 3.1 3.2 3.0 3.4 3.1 3.3
40.0 3.1 3.2 2.9 3.3 2.7 3.0 2.6 3.2 2.6 2.8
42.0 2.7 3.1 2.7 2.9 2.2 2.9 2.1 2.7 2.2 2.4
44.0 2.3 2.8 2.5 2.5 1.8 2.6 1.8 2.4 1.8 2.0
46.0 2.4 2.1 1.5 2.2 1.4 2.0 1.5 1.7
48.0 2.2 1.8 1.2 1.9 1.1 1.7 1.2 1.4
3 058 145
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
28.0 3.5 3.5 3.5 3.5 3.5 3.5 3.6 3.5 3.6 3.5
30.0 3.5 3.4 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
32.0 3.4 3.4 3.4 3.4 3.4 3.4 3.5 3.4 3.5 3.4
34.0 3.3 3.3 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4
36.0 3.3 3.3 3.2 3.4 3.4 3.3 3.4 3.3 3.4 3.4
38.0 3.3 3.2 3.0 3.3 3.4 3.1 3.4 3.2 3.4 3.3
40.0 3.2 3.2 2.9 3.3 2.9 3.0 2.9 3.1 3.0 3.2
42.0 2.7 3.0 2.4 2.9 2.4 3.0 2.5 2.7
44.0 2.5 2.6 2.0 2.8 2.0 2.6 2.1 2.3
46.0 2.4 1.6 2.2 1.7 1.9
3 058 160
Length of swingaway 11 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 13.9 12.8 11.0 11.9 13.5 10.3 10.9 5.9 8.5 7.2
12.0 13.3 12.3 10.6 11.9 13.2 10.2 10.9 5.9 8.5 7.2
13.0 12.9 11.8 10.2 11.9 12.9 9.9 10.9 5.9 8.5 7.2
14.0 12.5 11.3 9.7 11.7 12.3 9.6 10.9 5.9 8.5 7.2
15.0 12.2 10.8 9.3 11.3 11.1 9.3 10.5 5.9 8.5 7.2
16.0 11.1 10.3 8.8 10.8 10.0 8.9 9.5 5.9 8.5 7.2
18.0 9.2 9.4 7.9 9.2 8.2 8.1 7.8 5.9 7.6 7.2
20.0 7.8 8.4 7.0 7.8 6.8 7.3 6.4 5.9 6.3 6.4
22.0 6.4 7.2 6.1 6.6 5.6 6.5 5.3 5.9 5.2 5.3
24.0 5.3 6.1 5.7 5.6 4.7 5.6 4.3 5.1 4.3 4.4
26.0 4.4 5.2 5.2 4.7 3.8 4.8 3.6 4.3 3.5 3.7
28.0 3.6 4.4 4.4 3.9 3.1 4.0 2.9 3.7 2.9 3.0
30.0 3.0 3.7 3.7 3.2 2.4 3.4 2.3 3.1 2.3 2.4
32.0 2.5 3.2 3.2 2.7 1.9 2.8 1.8 2.6 1.8 1.9
34.0 2.0 2.7 2.7 2.2 1.4 2.3 1.3 2.1 1.3 1.5
36.0 1.6 2.3 2.3 1.8 1.0 1.9 0.9 1.7 1.0 1.1
38.0 1.2 1.9 1.9 1.4 1.5 1.3 0.8
40.0 1.6 1.1 1.2 1.0
42.0 1.3 0.8 0.9
44.0 1.0
3 058 161
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
16.0 8.8 8.4 8.2 8.6 8.9 8.2 8.8 7.3 8.5 7.4
18.0 8.5 7.9 7.5 8.1 8.6 7.6 8.6 7.3 8.3 7.3
20.0 8.1 7.3 6.8 7.7 7.6 7.0 7.2 7.2 7.1 7.0
22.0 7.0 6.8 6.1 7.2 6.3 6.4 6.0 6.6 5.9 6.0
24.0 5.8 6.2 5.5 6.1 5.3 5.8 5.0 5.7 5.0 5.0
26.0 4.9 5.6 5.1 5.1 4.4 5.3 4.1 4.8 4.1 4.2
28.0 4.0 4.7 4.8 4.3 3.5 4.4 3.4 4.1 3.4 3.5
30.0 3.3 4.0 4.1 3.6 2.8 3.8 2.8 3.5 2.8 2.9
32.0 2.7 3.4 3.5 3.0 2.2 3.2 2.2 2.9 2.2 2.4
34.0 2.2 2.9 2.9 2.5 1.7 2.6 1.7 2.4 1.7 1.9
36.0 1.7 2.4 2.5 2.0 1.3 2.2 1.2 2.0 1.3 1.5
38.0 1.3 2.0 2.1 1.6 0.9 1.8 0.8 1.6 0.9 1.1
40.0 1.7 1.2 1.4 1.2 0.7
42.0 1.4 0.9 1.1 0.9
44.0 0.8
3 058 162
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
18.0 7.0 6.9 6.6 7.0 7.1 7.0 7.0 6.6 7.0 6.5
20.0 6.8 6.7 6.2 6.8 6.8 6.6 6.8 6.4 6.8 6.3
22.0 6.6 6.4 5.8 6.6 6.6 6.2 6.6 6.2 6.6 6.1
24.0 6.2 6.2 5.5 6.4 5.8 5.8 5.5 6.0 5.5 5.6
26.0 5.2 5.9 5.1 5.5 4.8 5.4 4.6 5.3 4.6 4.7
28.0 4.3 5.0 4.8 4.6 3.9 4.8 3.8 4.5 3.8 3.9
30.0 3.6 4.2 4.3 3.9 3.1 4.0 3.1 3.8 3.1 3.3
32.0 2.9 3.6 3.6 3.2 2.5 3.4 2.5 3.2 2.5 2.7
34.0 3.1 2.7 1.9 2.8 1.9 2.7 2.0 2.2
36.0 2.6 2.1 1.4 2.3 1.4 2.2 1.5 1.7
3 058 163
Length of swingaway 18 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 6.8 6.4 5.8 6.2 6.4 5.6 6.0 3.8 5.4 4.7
12.0 6.7 6.3 5.8 6.1 6.3 5.5 5.9 3.8 5.4 4.7
13.0 6.5 6.2 5.7 6.0 6.3 5.5 5.9 3.8 5.4 4.7
14.0 6.4 6.1 5.7 6.0 6.2 5.5 5.8 3.8 5.3 4.7
15.0 6.3 6.1 5.6 5.9 6.1 5.4 5.8 3.8 5.3 4.7
16.0 6.2 6.0 5.6 5.9 6.0 5.4 5.7 3.8 5.3 4.7
18.0 5.9 5.7 5.5 5.7 5.9 5.3 5.6 3.8 5.2 4.7
20.0 5.7 5.5 5.3 5.6 5.7 5.2 5.5 3.8 5.1 4.7
22.0 5.5 5.3 5.1 5.4 5.6 5.1 5.4 3.8 5.1 4.6
24.0 5.2 5.1 5.0 5.3 5.1 5.1 4.7 3.8 4.6 4.6
26.0 5.0 4.9 4.7 5.1 4.3 4.8 3.9 3.8 3.9 3.9
28.0 4.2 4.6 4.3 4.4 3.6 4.4 3.3 3.8 3.2 3.3
30.0 3.6 4.2 4.0 3.7 3.0 3.8 2.7 3.3 2.6 2.7
32.0 3.0 3.6 3.6 3.1 2.4 3.2 2.2 2.8 2.1 2.2
34.0 2.5 3.1 3.1 2.6 1.9 2.7 1.7 2.4 1.7 1.8
36.0 2.1 2.7 2.6 2.2 1.5 2.3 1.4 2.0 1.3 1.4
38.0 1.7 2.3 2.2 1.8 1.2 1.9 1.0 1.6 1.0 1.1
40.0 1.4 2.0 1.9 1.5 0.8 1.6 1.3 0.7
42.0 1.1 1.7 1.6 1.2 1.3 1.0
44.0 0.8 1.4 1.3 0.9 1.0 0.7
3 058 164
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
20.0 4.6 4.5 4.5 4.6 4.7 4.5 4.6 4.5 4.6 4.3
22.0 4.4 4.4 4.4 4.4 4.5 4.4 4.5 4.4 4.4 4.2
24.0 4.2 4.2 4.2 4.3 4.3 4.2 4.3 4.2 4.3 4.1
26.0 4.1 4.0 4.0 4.1 4.2 4.1 4.2 4.1 4.2 4.1
28.0 4.0 3.9 3.9 4.0 4.1 4.0 4.1 4.0 4.1 4.0
30.0 3.8 3.8 3.7 3.9 3.7 3.9 3.5 3.9 3.4 3.5
32.0 3.5 3.7 3.6 3.7 3.1 3.8 2.9 3.5 2.9 2.9
34.0 3.0 3.5 3.4 3.1 2.5 3.2 2.4 3.0 2.4 2.4
36.0 2.5 3.1 3.0 2.7 2.0 2.8 1.9 2.5 1.9 2.0
38.0 2.1 2.6 2.6 2.2 1.6 2.3 1.5 2.1 1.5 1.6
40.0 1.7 2.2 2.2 1.9 1.2 1.9 1.1 1.7 1.1 1.3
42.0 1.3 1.9 1.9 1.5 0.9 1.6 0.8 1.4 0.8 0.9
44.0 1.0 1.6 1.6 1.2 1.3 1.1
46.0 1.3 0.9 1.0 0.8
48.0 1.0 0.7
50.0 0.7
3 058 165
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
28.0 3.5 3.5 3.5 3.5 3.5 3.5 3.6 3.5 3.6 3.5
30.0 3.5 3.4 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
32.0 3.4 3.4 3.4 3.4 3.4 3.4 3.5 3.4 3.5 3.4
34.0 3.3 3.3 3.4 3.4 3.0 3.4 2.9 3.4 2.9 3.0
36.0 2.8 3.3 3.2 3.0 2.4 3.1 2.4 2.9 2.4 2.5
38.0 2.3 2.8 2.9 2.5 1.9 2.6 1.9 2.5 1.9 2.1
40.0 1.8 2.4 2.4 2.1 1.5 2.2 1.5 2.1 1.5 1.7
42.0 2.0 1.7 1.1 1.8 1.1 1.7 1.1 1.3
44.0 1.7 1.3 0.7 1.5 0.7 1.3 0.8 0.9
46.0 1.2 1.0
3 058 180
Length of swingaway 11 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 13.9 12.8 11.0 11.9 13.5 10.3 10.9 5.9 8.5 7.2
12.0 13.3 12.3 10.6 11.9 12.7 10.2 10.9 5.9 8.5 7.2
13.0 12.6 11.8 10.2 11.9 11.3 9.9 10.7 5.9 8.5 7.2
14.0 11.2 11.3 9.7 11.1 10.0 9.6 9.5 5.9 8.5 7.2
15.0 10.1 10.8 9.3 10.0 8.9 9.3 8.4 5.9 8.3 7.2
16.0 9.1 10.1 8.8 9.1 8.0 8.9 7.5 5.9 7.4 7.2
18.0 7.4 8.4 7.9 7.5 6.4 7.4 6.0 5.9 5.9 6.0
20.0 6.1 7.1 6.8 6.2 5.2 6.2 4.8 5.6 4.8 4.9
22.0 5.1 5.9 5.8 5.2 4.2 5.2 3.9 4.6 3.8 3.9
24.0 4.1 4.9 4.9 4.3 3.3 4.3 3.0 3.8 3.0 3.2
26.0 3.3 4.1 4.0 3.5 2.6 3.6 2.4 3.1 2.3 2.5
28.0 2.6 3.4 3.4 2.9 2.0 3.0 1.8 2.6 1.8 1.9
30.0 2.1 2.8 2.8 2.3 1.5 2.4 1.2 2.0 1.3 1.4
32.0 1.6 2.3 2.3 1.8 1.0 1.9 0.8 1.6 0.8 1.0
34.0 1.2 1.9 1.9 1.4 1.5 1.2
3 058 181
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
16.0 8.8 8.4 8.2 8.6 8.9 8.2 8.6 7.3 8.4 7.4
18.0 8.3 7.9 7.5 8.1 7.4 7.6 7.0 7.3 6.9 6.9
20.0 6.8 7.3 6.8 6.9 6.0 6.8 5.7 6.3 5.6 5.6
22.0 5.7 6.4 6.1 5.8 4.9 5.8 4.6 5.3 4.5 4.6
24.0 4.6 5.3 5.3 4.8 3.9 4.8 3.7 4.4 3.7 3.8
26.0 3.7 4.5 4.5 4.0 3.2 4.1 2.9 3.7 2.9 3.1
28.0 3.0 3.7 3.7 3.3 2.5 3.4 2.3 3.0 2.3 2.4
30.0 2.4 3.1 3.1 2.7 1.9 2.8 1.7 2.5 1.7 1.9
32.0 1.9 2.6 2.6 2.1 1.4 2.3 1.2 2.0 1.2 1.4
34.0 1.4 2.1 2.1 1.7 0.9 1.8 0.8 1.5 0.8 1.0
3 058 182
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
18.0 7.0 6.9 6.6 7.0 7.1 7.0 7.0 6.6 7.0 6.5
20.0 6.8 6.7 6.2 6.8 6.7 6.6 6.4 6.4 6.3 6.3
22.0 6.2 6.4 5.8 6.3 5.5 6.2 5.2 5.8 5.2 5.2
24.0 5.0 5.7 5.5 5.3 4.5 5.3 4.2 4.9 4.2 4.3
26.0 4.1 4.7 4.8 4.4 3.6 4.5 3.4 4.1 3.4 3.5
28.0 3.3 4.0 4.0 3.6 2.9 3.8 2.7 3.4 2.7 2.8
30.0 2.6 3.3 3.3 2.9 2.2 3.1 2.1 2.8 2.1 2.3
32.0 2.0 2.7 2.8 2.3 1.6 2.5 1.5 2.3 1.6 1.7
34.0 2.3 1.8 1.1 2.0 1.0 1.8 1.1 1.3
36.0 1.8 1.4 1.6 1.4 0.9
3 058 183
Length of swingaway 18 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 6.8 6.4 5.8 6.2 6.4 5.6 6.0 3.8 5.4 4.7
12.0 6.7 6.3 5.8 6.1 6.3 5.5 5.9 3.8 5.4 4.7
13.0 6.5 6.2 5.7 6.0 6.3 5.5 5.9 3.8 5.4 4.7
14.0 6.4 6.1 5.7 6.0 6.2 5.5 5.8 3.8 5.3 4.7
15.0 6.3 6.1 5.6 5.9 6.1 5.4 5.8 3.8 5.3 4.7
16.0 6.2 6.0 5.6 5.9 6.0 5.4 5.7 3.8 5.3 4.7
18.0 5.9 5.7 5.5 5.7 5.9 5.3 5.6 3.8 5.2 4.7
20.0 5.7 5.5 5.3 5.6 5.6 5.2 5.2 3.8 5.1 4.7
22.0 5.5 5.3 5.1 5.4 4.6 5.1 4.3 3.8 4.1 4.2
24.0 4.6 5.1 5.0 4.6 3.8 4.6 3.4 3.8 3.4 3.4
26.0 3.9 4.5 4.4 3.9 3.1 3.9 2.8 3.4 2.7 2.8
28.0 3.2 3.8 3.8 3.3 2.5 3.3 2.2 2.8 2.1 2.2
30.0 2.6 3.3 3.2 2.8 2.0 2.7 1.7 2.3 1.6 1.7
32.0 2.1 2.8 2.7 2.3 1.5 2.3 1.2 1.9 1.2 1.3
34.0 1.7 2.3 2.2 1.8 1.1 1.9 0.8 1.5 0.8 0.9
3 058 184
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
20.0 4.6 4.5 4.5 4.6 4.7 4.5 4.6 4.5 4.6 4.3
22.0 4.4 4.4 4.4 4.4 4.5 4.4 4.5 4.4 4.4 4.2
24.0 4.2 4.2 4.2 4.3 4.3 4.2 4.3 4.2 4.3 4.1
26.0 4.1 4.0 4.0 4.1 4.0 4.1 3.7 4.1 3.6 3.7
28.0 3.9 3.9 3.9 4.0 3.3 4.0 3.0 3.6 3.0 3.1
30.0 3.2 3.8 3.7 3.4 2.7 3.4 2.5 3.0 2.4 2.5
32.0 2.7 3.2 3.2 2.8 2.2 2.9 1.9 2.5 1.9 2.0
34.0 2.2 2.7 2.7 2.3 1.7 2.4 1.5 2.1 1.5 1.6
36.0 1.7 2.3 2.3 1.9 1.3 2.0 1.1 1.7 1.1 1.2
38.0 1.3 1.9 1.9 1.5 0.9 1.6 0.7 1.3 0.7 0.8
3 058 185
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
28.0 3.5 3.5 3.5 3.5 3.5 3.5 3.6 3.5 3.6 3.5
30.0 3.5 3.4 3.5 3.5 3.3 3.5 3.1 3.5 3.1 3.1
32.0 3.1 3.4 3.4 3.3 2.7 3.4 2.5 3.0 2.5 2.6
34.0 2.5 3.0 3.0 2.7 2.2 2.8 2.0 2.5 2.0 2.1
36.0 2.0 2.5 2.6 2.2 1.7 2.3 1.5 2.1 1.5 1.6
38.0 1.6 2.1 2.1 1.8 1.2 1.9 1.1 1.7 1.1 1.2
40.0 1.1 1.7 1.7 1.4 0.8 1.5 0.7 1.3 0.7 0.9
42.0 1.4 1.0 1.2 1.0
44.0 1.1 0.7 0.9
3 058 200
Length of swingaway 11 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 13.9 12.8 11.0 11.9 13.5 10.3 10.9 5.9 8.5 7.2
12.0 13.3 12.3 10.6 11.9 13.2 10.2 10.9 5.9 8.5 7.2
13.0 12.9 11.8 10.2 11.9 12.9 9.9 10.9 5.9 8.5 7.2
14.0 12.5 11.3 9.7 11.7 12.5 9.6 10.9 5.9 8.5 7.2
15.0 12.2 10.8 9.3 11.3 12.2 9.3 10.9 5.9 8.5 7.2
16.0 11.8 10.3 8.8 10.8 11.2 8.9 10.6 5.9 8.5 7.2
18.0 10.5 9.4 7.9 9.9 9.5 8.1 9.0 5.9 8.3 7.2
20.0 9.1 8.4 7.0 9.0 8.1 7.3 7.7 5.9 7.5 7.2
22.0 7.9 7.4 6.1 7.9 6.9 6.5 6.5 5.9 6.4 6.4
24.0 6.9 6.9 5.7 6.9 5.9 6.0 5.6 5.9 5.5 5.6
26.0 5.9 6.4 5.3 6.0 5.1 5.6 4.8 5.5 4.7 4.8
28.0 5.1 5.8 4.9 5.3 4.4 5.1 4.1 4.8 4.0 4.1
30.0 4.4 5.1 4.5 4.6 3.8 4.6 3.5 4.2 3.4 3.5
32.0 3.7 4.5 4.1 4.0 3.2 4.1 2.9 3.6 2.9 3.0
34.0 3.2 3.9 3.9 3.4 2.7 3.5 2.5 3.2 2.4 2.5
36.0 2.7 3.4 3.4 3.0 2.2 3.1 2.0 2.7 2.0 2.1
38.0 2.3 3.0 3.0 2.5 1.8 2.6 1.6 2.4 1.6 1.8
40.0 2.6 2.2 1.4 2.3 1.3 2.0 1.3 1.4
42.0 2.3 1.8 1.1 1.9 1.0 1.7 1.0 1.1
44.0 2.0 1.5 0.8 1.6 1.4 0.7 0.8
3 058 201
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
16.0 8.8 8.4 8.2 8.6 8.9 8.2 8.8 7.3 8.5 7.4
18.0 8.5 7.9 7.5 8.1 8.6 7.6 8.6 7.3 8.3 7.3
20.0 8.1 7.3 6.8 7.7 8.3 7.0 8.3 7.2 8.0 7.0
22.0 7.8 6.8 6.1 7.2 7.6 6.4 7.2 6.6 7.1 6.7
24.0 7.4 6.2 5.5 6.7 6.5 5.8 6.2 6.1 6.1 6.1
26.0 6.4 5.9 5.1 6.4 5.6 5.4 5.3 5.7 5.2 5.3
28.0 5.5 5.5 4.8 5.7 4.8 5.1 4.6 5.2 4.5 4.6
30.0 4.7 5.2 4.5 4.9 4.2 4.7 3.9 4.6 3.9 4.0
32.0 4.0 4.7 4.1 4.3 3.5 4.3 3.3 4.0 3.3 3.4
34.0 3.4 4.1 3.8 3.7 3.0 3.8 2.8 3.5 2.8 2.9
36.0 2.9 3.6 3.6 3.2 2.4 3.3 2.3 3.0 2.3 2.5
38.0 2.4 3.1 3.1 2.7 2.0 2.9 1.9 2.6 1.9 2.1
40.0 2.7 2.3 1.6 2.5 1.5 2.2 1.5 1.7
42.0 2.4 1.9 1.2 2.1 1.2 1.9 1.2 1.4
44.0 1.7 0.8 1.6 0.9 1.1
3 058 202
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
18.0 7.0 6.9 6.6 7.0 7.1 7.0 7.0 6.6 7.0 6.5
20.0 6.8 6.7 6.2 6.8 6.8 6.6 6.8 6.4 6.8 6.3
22.0 6.6 6.4 5.8 6.6 6.6 6.2 6.6 6.2 6.6 6.1
24.0 6.4 6.2 5.5 6.4 6.4 5.8 6.4 6.0 6.4 5.9
26.0 6.4 5.9 5.1 6.1 6.0 5.4 5.8 5.7 5.7 5.7
28.0 5.7 5.5 4.8 5.8 5.2 5.1 4.9 5.4 4.9 5.0
30.0 4.9 5.2 4.5 5.2 4.5 4.7 4.2 4.9 4.2 4.3
32.0 4.2 4.8 4.2 4.5 3.8 4.4 3.6 4.3 3.6 3.7
34.0 3.8 3.9 3.1 4.0 3.0 3.7 3.1 3.2
36.0 3.6 3.3 2.6 3.5 2.5 3.2 2.6 2.7
3 058 203
Length of swingaway 18 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 6.8 6.4 5.8 6.2 6.4 5.6 6.0 3.8 5.4 4.7
12.0 6.7 6.3 5.8 6.1 6.3 5.5 5.9 3.8 5.4 4.7
13.0 6.5 6.2 5.7 6.0 6.3 5.5 5.9 3.8 5.4 4.7
14.0 6.4 6.1 5.7 6.0 6.2 5.5 5.8 3.8 5.3 4.7
15.0 6.3 6.1 5.6 5.9 6.1 5.4 5.8 3.8 5.3 4.7
16.0 6.2 6.0 5.6 5.9 6.0 5.4 5.7 3.8 5.3 4.7
18.0 5.9 5.7 5.5 5.7 5.9 5.3 5.6 3.8 5.2 4.7
20.0 5.7 5.5 5.3 5.6 5.7 5.2 5.5 3.8 5.1 4.7
22.0 5.5 5.3 5.1 5.4 5.6 5.1 5.4 3.8 5.1 4.6
24.0 5.2 5.1 5.0 5.3 5.4 5.1 5.3 3.8 5.0 4.6
26.0 5.0 4.9 4.7 5.1 5.2 4.8 5.1 3.8 4.9 4.6
28.0 4.8 4.6 4.3 4.9 4.7 4.5 4.4 3.8 4.3 4.3
30.0 4.6 4.4 4.0 4.7 4.1 4.3 3.8 3.8 3.7 3.7
32.0 4.3 4.2 3.7 4.4 3.6 4.0 3.3 3.8 3.2 3.2
34.0 3.7 4.0 3.4 3.8 3.1 3.7 2.8 3.4 2.7 2.8
36.0 3.2 3.8 3.2 3.4 2.7 3.4 2.4 3.0 2.3 2.4
38.0 2.8 3.4 3.0 2.9 2.3 3.0 2.0 2.6 1.9 2.0
40.0 2.4 3.0 2.8 2.5 1.9 2.6 1.6 2.2 1.6 1.7
42.0 2.1 2.7 2.6 2.2 1.5 2.2 1.3 1.9 1.3 1.4
44.0 1.8 2.3 2.3 1.9 1.2 1.9 1.1 1.6 1.0 1.1
46.0 1.5 2.1 2.0 1.6 1.0 1.7 0.8 1.4 0.7 0.8
48.0 1.7 1.4 0.7 1.4 1.1
50.0 1.5 1.1 1.2 0.9
52.0 0.9 0.7
54.0 0.7
3 058 204
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
20.0 4.6 4.5 4.5 4.6 4.7 4.5 4.6 4.5 4.6 4.3
22.0 4.4 4.4 4.4 4.4 4.5 4.4 4.5 4.4 4.4 4.2
24.0 4.2 4.2 4.2 4.3 4.3 4.2 4.3 4.2 4.3 4.1
26.0 4.1 4.0 4.0 4.1 4.2 4.1 4.2 4.1 4.2 4.1
28.0 4.0 3.9 3.9 4.0 4.1 4.0 4.1 4.0 4.1 4.0
30.0 3.8 3.8 3.7 3.9 3.9 3.9 4.0 3.9 4.0 3.9
32.0 3.7 3.7 3.6 3.8 3.8 3.8 3.9 3.9 3.8 3.8
34.0 3.6 3.6 3.4 3.7 3.6 3.6 3.4 3.8 3.3 3.4
36.0 3.6 3.4 3.2 3.6 3.2 3.4 2.9 3.4 2.9 2.9
38.0 3.1 3.3 3.0 3.3 2.7 3.2 2.5 3.0 2.4 2.5
40.0 2.7 3.2 2.9 2.9 2.3 3.0 2.1 2.7 2.1 2.1
42.0 2.3 2.9 2.7 2.5 1.9 2.6 1.7 2.3 1.7 1.8
44.0 1.9 2.5 2.5 2.1 1.5 2.2 1.4 2.0 1.4 1.5
46.0 2.2 1.8 1.2 1.9 1.1 1.7 1.1 1.2
48.0 1.9 1.5 0.9 1.6 0.8 1.4 0.8 0.9
3 058 205
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
28.0 3.5 3.5 3.5 3.5 3.5 3.5 3.6 3.5 3.6 3.5
30.0 3.5 3.4 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
32.0 3.4 3.4 3.4 3.4 3.4 3.4 3.5 3.4 3.5 3.4
34.0 3.3 3.3 3.4 3.4 3.4 3.4 3.4 3.4 3.4 3.4
36.0 3.3 3.3 3.2 3.4 3.4 3.3 3.3 3.3 3.3 3.4
38.0 3.3 3.2 3.0 3.3 3.0 3.1 2.9 3.2 2.8 2.9
40.0 2.8 3.2 2.9 3.1 2.5 3.0 2.4 3.0 2.4 2.5
42.0 2.7 2.7 2.1 2.8 2.0 2.6 2.0 2.1
44.0 2.5 2.3 1.7 2.4 1.6 2.2 1.7 1.8
46.0 2.1 1.3 1.9 1.3 1.5
3 058 210
Length of swingaway 11 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 13.9 12.8 11.0 11.9 13.5 10.3 10.9 5.9 8.5 7.2
12.0 13.3 12.3 10.6 11.9 13.2 10.2 10.9 5.9 8.5 7.2
13.0 12.9 11.8 10.2 11.9 11.9 9.9 10.9 5.9 8.5 7.2
14.0 12.0 11.3 9.7 11.7 10.8 9.6 10.2 5.9 8.5 7.2
15.0 11.0 10.8 9.3 10.8 9.8 9.3 9.3 5.9 8.5 7.2
16.0 10.1 10.3 8.8 9.9 9.0 8.9 8.5 5.9 8.2 7.2
18.0 8.5 9.4 7.9 8.4 7.5 8.1 7.0 5.9 6.9 6.9
20.0 7.2 8.1 7.0 7.2 6.3 7.1 5.9 5.9 5.7 5.8
22.0 6.2 7.0 6.1 6.2 5.2 6.1 4.9 5.6 4.8 4.9
24.0 5.3 6.1 5.7 5.3 4.4 5.3 4.1 4.8 4.0 4.1
26.0 4.5 5.3 5.1 4.6 3.7 4.6 3.4 4.1 3.3 3.4
28.0 3.8 4.6 4.5 4.0 3.0 3.9 2.8 3.5 2.7 2.8
30.0 3.2 3.9 3.9 3.4 2.5 3.4 2.2 3.0 2.2 2.3
32.0 2.7 3.4 3.4 2.9 2.0 2.9 1.8 2.5 1.7 1.9
34.0 2.2 2.9 2.9 2.4 1.6 2.5 1.3 2.1 1.3 1.5
36.0 1.8 2.5 2.5 2.0 1.2 2.1 1.0 1.7 1.0 1.1
38.0 1.4 2.1 2.1 1.6 0.9 1.7 1.4 0.8
40.0 1.8 1.3 1.4 1.1
42.0 1.5 1.0 1.1 0.8
44.0 1.2 0.7 0.8
3 058 211
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
16.0 8.8 8.4 8.2 8.6 8.9 8.2 8.8 7.3 8.5 7.4
18.0 8.5 7.9 7.5 8.1 8.3 7.6 7.9 7.3 7.7 7.3
20.0 7.9 7.3 6.8 7.7 7.0 7.0 6.6 7.2 6.5 6.5
22.0 6.7 6.8 6.1 6.7 5.9 6.4 5.6 6.2 5.5 5.5
24.0 5.8 6.2 5.5 5.8 5.0 5.8 4.7 5.3 4.6 4.7
26.0 5.0 5.7 5.1 5.0 4.2 5.0 3.9 4.6 3.9 3.9
28.0 4.2 4.9 4.8 4.3 3.5 4.3 3.2 3.9 3.2 3.3
30.0 3.5 4.2 4.2 3.7 2.9 3.7 2.7 3.3 2.6 2.8
32.0 2.9 3.6 3.6 3.2 2.4 3.2 2.1 2.8 2.1 2.3
34.0 2.4 3.1 3.1 2.7 1.9 2.8 1.7 2.4 1.7 1.8
36.0 2.0 2.6 2.7 2.2 1.5 2.3 1.3 2.0 1.3 1.4
38.0 1.5 2.2 2.3 1.8 1.1 2.0 0.9 1.6 0.9 1.1
40.0 1.9 1.5 0.7 1.6 1.3 0.8
42.0 1.5 1.1 1.3 1.0
44.0 1.0 0.7
46.0 0.7
3 058 212
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
18.0 7.0 6.9 6.6 7.0 7.1 7.0 7.0 6.6 7.0 6.5
20.0 6.8 6.7 6.2 6.8 6.8 6.6 6.8 6.4 6.8 6.3
22.0 6.6 6.4 5.8 6.6 6.4 6.2 6.1 6.2 6.0 6.0
24.0 6.2 6.2 5.5 6.2 5.4 5.8 5.2 5.7 5.1 5.1
26.0 5.3 5.9 5.1 5.4 4.6 5.4 4.3 5.0 4.3 4.4
28.0 4.5 5.1 4.8 4.6 3.8 4.6 3.6 4.3 3.6 3.7
30.0 3.7 4.4 4.4 4.0 3.2 4.0 3.0 3.6 3.0 3.1
32.0 3.1 3.7 3.8 3.4 2.6 3.5 2.4 3.1 2.4 2.6
34.0 3.3 2.8 2.1 3.0 1.9 2.6 2.0 2.1
36.0 2.8 2.3 1.6 2.5 1.5 2.2 1.5 1.7
3 058 213
Length of swingaway 18 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 6.8 6.4 5.8 6.2 6.4 5.6 6.0 3.8 5.4 4.7
12.0 6.7 6.3 5.8 6.1 6.3 5.5 5.9 3.8 5.4 4.7
13.0 6.5 6.2 5.7 6.0 6.3 5.5 5.9 3.8 5.4 4.7
14.0 6.4 6.1 5.7 6.0 6.2 5.5 5.8 3.8 5.3 4.7
15.0 6.3 6.1 5.6 5.9 6.1 5.4 5.8 3.8 5.3 4.7
16.0 6.2 6.0 5.6 5.9 6.0 5.4 5.7 3.8 5.3 4.7
18.0 5.9 5.7 5.5 5.7 5.9 5.3 5.6 3.8 5.2 4.7
20.0 5.7 5.5 5.3 5.6 5.7 5.2 5.5 3.8 5.1 4.7
22.0 5.5 5.3 5.1 5.4 5.6 5.1 5.2 3.8 5.0 4.6
24.0 5.2 5.1 5.0 5.3 4.7 5.1 4.4 3.8 4.2 4.3
26.0 4.8 4.9 4.7 4.8 4.0 4.7 3.7 3.8 3.6 3.6
28.0 4.2 4.6 4.3 4.2 3.4 4.1 3.1 3.7 3.0 3.0
30.0 3.7 4.3 4.0 3.7 2.9 3.6 2.6 3.2 2.5 2.5
32.0 3.2 3.8 3.6 3.2 2.4 3.1 2.1 2.7 2.0 2.1
34.0 2.7 3.3 3.2 2.8 2.0 2.7 1.7 2.3 1.6 1.7
36.0 2.3 2.9 2.8 2.4 1.6 2.3 1.3 1.9 1.3 1.3
38.0 1.9 2.5 2.4 2.0 1.3 2.0 1.0 1.6 0.9 1.0
40.0 1.6 2.2 2.1 1.7 1.0 1.7 0.7 1.3 0.7
42.0 1.3 1.9 1.8 1.4 0.7 1.4 1.0
44.0 1.0 1.6 1.5 1.1 1.2 0.8
3 058 214
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
20.0 4.6 4.5 4.5 4.6 4.7 4.5 4.6 4.5 4.6 4.3
22.0 4.4 4.4 4.4 4.4 4.5 4.4 4.5 4.4 4.4 4.2
24.0 4.2 4.2 4.2 4.3 4.3 4.2 4.3 4.2 4.3 4.1
26.0 4.1 4.0 4.0 4.1 4.2 4.1 4.2 4.1 4.2 4.1
28.0 4.0 3.9 3.9 4.0 4.1 4.0 3.9 4.0 3.8 3.8
30.0 3.8 3.8 3.7 3.9 3.6 3.9 3.3 3.8 3.2 3.3
32.0 3.7 3.7 3.6 3.7 3.0 3.7 2.8 3.3 2.7 2.8
34.0 3.2 3.6 3.4 3.2 2.5 3.2 2.3 2.8 2.2 2.3
36.0 2.7 3.2 3.2 2.8 2.1 2.8 1.9 2.4 1.8 1.9
38.0 2.2 2.8 2.8 2.4 1.7 2.4 1.5 2.1 1.5 1.5
40.0 1.9 2.4 2.4 2.0 1.3 2.1 1.1 1.7 1.1 1.2
42.0 1.5 2.1 2.0 1.7 1.0 1.7 0.8 1.4 0.8 0.9
44.0 1.2 1.7 1.7 1.4 0.7 1.4 1.1
46.0 1.4 1.1 1.2 0.9
48.0 1.2 0.8 0.9
50.0 0.9
3 058 215
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
28.0 3.5 3.5 3.5 3.5 3.5 3.5 3.6 3.5 3.6 3.5
30.0 3.5 3.4 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
32.0 3.4 3.4 3.4 3.4 3.4 3.4 3.3 3.4 3.3 3.3
34.0 3.3 3.3 3.4 3.4 3.0 3.4 2.8 3.3 2.7 2.8
36.0 2.9 3.3 3.2 3.1 2.5 3.1 2.3 2.8 2.3 2.4
38.0 2.5 3.0 3.0 2.7 2.0 2.7 1.9 2.4 1.9 2.0
40.0 2.0 2.5 2.6 2.3 1.6 2.3 1.5 2.0 1.5 1.6
42.0 2.2 1.9 1.2 2.0 1.1 1.7 1.1 1.2
44.0 1.8 1.5 0.9 1.6 0.8 1.4 0.8 0.9
46.0 1.3 1.1
3 058 220
Length of swingaway 11 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 13.9 12.8 11.0 11.9 12.8 10.3 10.9 5.9 8.5 7.2
12.0 12.8 12.3 10.6 11.9 11.5 10.2 10.8 5.9 8.5 7.2
13.0 11.6 11.8 10.2 11.3 10.3 9.9 9.7 5.9 8.5 7.2
14.0 10.5 11.3 9.7 10.3 9.3 9.6 8.7 5.9 8.5 7.2
15.0 9.5 10.4 9.3 9.4 8.4 9.2 7.9 5.9 7.7 7.2
16.0 8.7 9.6 8.8 8.6 7.6 8.4 7.1 5.9 6.9 6.9
18.0 7.2 8.1 7.8 7.2 6.2 7.1 5.8 5.9 5.7 5.7
20.0 6.1 7.0 6.7 6.1 5.1 6.0 4.8 5.5 4.7 4.7
22.0 5.1 6.0 5.7 5.2 4.2 5.1 3.9 4.6 3.8 3.9
24.0 4.3 5.2 4.9 4.4 3.5 4.3 3.2 3.9 3.1 3.2
26.0 3.6 4.5 4.3 3.7 2.8 3.7 2.5 3.2 2.5 2.6
28.0 3.0 3.8 3.7 3.1 2.2 3.1 2.0 2.7 1.9 2.1
30.0 2.5 3.2 3.2 2.6 1.7 2.6 1.5 2.2 1.5 1.6
32.0 2.0 2.7 2.7 2.2 1.3 2.2 1.0 1.8 1.0 1.2
34.0 1.6 2.3 2.3 1.8 0.9 1.8 1.4 0.8
3 058 221
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
16.0 8.8 8.4 8.2 8.6 8.5 8.2 8.1 7.3 7.9 7.4
18.0 8.0 7.9 7.5 7.9 7.1 7.6 6.7 7.2 6.5 6.5
20.0 6.7 7.3 6.8 6.7 5.9 6.6 5.5 6.1 5.4 5.4
22.0 5.7 6.5 6.1 5.7 4.9 5.7 4.6 5.2 4.5 4.5
24.0 4.8 5.6 5.4 4.9 4.0 4.8 3.7 4.4 3.7 3.8
26.0 4.1 4.8 4.7 4.2 3.3 4.1 3.0 3.7 3.0 3.1
28.0 3.4 4.1 4.0 3.5 2.7 3.5 2.4 3.1 2.4 2.5
30.0 2.8 3.5 3.5 3.0 2.1 3.0 1.9 2.6 1.9 2.0
32.0 2.3 3.0 3.0 2.5 1.6 2.5 1.4 2.1 1.4 1.6
34.0 1.8 2.5 2.5 2.1 1.2 2.1 1.0 1.7 1.0 1.2
3 058 222
Length of swingaway 11 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
18.0 7.0 6.9 6.6 7.0 7.1 7.0 7.0 6.6 7.0 6.5
20.0 6.8 6.7 6.2 6.8 6.5 6.6 6.2 6.4 6.0 6.0
22.0 6.2 6.4 5.8 6.2 5.4 6.1 5.1 5.7 5.0 5.1
24.0 5.2 5.9 5.5 5.3 4.5 5.2 4.2 4.8 4.2 4.2
26.0 4.4 5.1 5.0 4.5 3.7 4.5 3.5 4.1 3.4 3.5
28.0 3.7 4.3 4.3 3.8 3.0 3.8 2.8 3.5 2.8 2.9
30.0 3.0 3.7 3.7 3.2 2.4 3.3 2.2 2.9 2.2 2.4
32.0 2.4 3.1 3.2 2.7 1.9 2.7 1.7 2.4 1.7 1.9
34.0 2.6 2.2 1.4 2.3 1.2 2.0 1.3 1.4
36.0 2.2 1.8 0.9 1.9 0.8 1.6 0.9 1.0
3 058 223
Length of swingaway 18 m
Offset of swingaway 0°
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
11.0 6.8 6.4 5.8 6.2 6.4 5.6 6.0 3.8 5.4 4.7
12.0 6.7 6.3 5.8 6.1 6.3 5.5 5.9 3.8 5.4 4.7
13.0 6.5 6.2 5.7 6.0 6.3 5.5 5.9 3.8 5.4 4.7
14.0 6.4 6.1 5.7 6.0 6.2 5.5 5.8 3.8 5.3 4.7
15.0 6.3 6.1 5.6 5.9 6.1 5.4 5.8 3.8 5.3 4.7
16.0 6.2 6.0 5.6 5.9 6.0 5.4 5.7 3.8 5.3 4.7
18.0 5.9 5.7 5.5 5.7 5.9 5.3 5.6 3.8 5.2 4.7
20.0 5.7 5.5 5.3 5.6 5.4 5.2 5.0 3.8 4.9 4.7
22.0 5.4 5.3 5.1 5.4 4.6 5.1 4.2 3.8 4.1 4.1
24.0 4.6 5.1 5.0 4.6 3.8 4.5 3.5 3.8 3.4 3.4
26.0 4.0 4.7 4.4 4.0 3.2 3.9 2.8 3.4 2.7 2.8
28.0 3.4 4.1 3.9 3.4 2.6 3.3 2.3 2.9 2.2 2.3
30.0 2.9 3.6 3.4 2.9 2.1 2.8 1.8 2.4 1.8 1.8
32.0 2.4 3.1 2.9 2.5 1.7 2.4 1.4 2.0 1.3 1.4
34.0 2.0 2.7 2.5 2.1 1.3 2.0 1.0 1.6 1.0 1.1
36.0 1.7 2.3 2.2 1.7 1.0 1.7 0.7 1.3 0.7
38.0 1.4 1.9 1.9 1.4 1.4 1.0
40.0 1.1 1.6 1.6 1.1 1.1 0.7
42.0 0.8 1.4 1.3 0.9 0.9
44.0 1.1 1.0
3 058 224
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
20.0 4.6 4.5 4.5 4.6 4.7 4.5 4.6 4.5 4.6 4.3
22.0 4.4 4.4 4.4 4.4 4.5 4.4 4.5 4.4 4.4 4.2
24.0 4.2 4.2 4.2 4.3 4.3 4.2 4.3 4.2 4.3 4.1
26.0 4.1 4.0 4.0 4.1 4.0 4.1 3.7 4.1 3.6 3.6
28.0 4.0 3.9 3.9 4.0 3.4 4.0 3.1 3.6 3.0 3.1
30.0 3.5 3.8 3.7 3.5 2.8 3.4 2.5 3.1 2.5 2.5
32.0 3.0 3.6 3.4 3.0 2.3 3.0 2.1 2.6 2.0 2.1
34.0 2.5 3.1 3.0 2.6 1.9 2.5 1.6 2.2 1.6 1.7
36.0 2.1 2.6 2.6 2.2 1.5 2.1 1.2 1.8 1.2 1.3
38.0 1.7 2.2 2.2 1.8 1.1 1.8 0.9 1.5 0.9 1.0
3 058 225
Length of swingaway 18 m
31.90 31.90 36.67 36.67 36.67 41.45 41.45 46.22 46.22 51.00
Tel. sec. I 0.50 0.00 0.00 0.50 1.00 0.00 1.00 0.50 1.00 1.00
Tel. sec. II 0.50 0.50 0.50 0.50 0.50 1.00 1.00 1.00 1.00 1.00
Tel. sec. III 0.50 0.50 1.00 0.50 0.50 1.00 0.50 1.00 1.00 1.00
Tel. sec. IV 0.50 1.00 1.00 1.00 0.50 1.00 0.50 1.00 0.50 1.00
Slewing 360°
range
Radius in m Lifting capacities in t
28.0 3.5 3.5 3.5 3.5 3.5 3.5 3.6 3.5 3.6 3.5
30.0 3.5 3.4 3.5 3.5 3.4 3.5 3.2 3.5 3.1 3.2
32.0 3.4 3.4 3.4 3.4 2.8 3.4 2.6 3.1 2.6 2.6
34.0 2.9 3.3 3.3 2.9 2.3 2.9 2.1 2.6 2.1 2.2
36.0 2.4 2.9 2.9 2.5 1.8 2.5 1.7 2.2 1.7 1.7
38.0 1.9 2.4 2.5 2.1 1.4 2.1 1.3 1.8 1.3 1.4
40.0 1.5 2.0 2.1 1.7 1.0 1.7 0.9 1.5 0.9 1.0
42.0 1.7 1.4 1.4 1.1 0.7
44.0 1.4 1.0 1.1 0.8
46.0 0.8