Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

Multi-LNG White STS hoses

Gutteling was founded by Mr.Peter Gutteling in 1990.


Since April 2015 part of the NES group.
Through the years the range of products turn to be bigger and bigger.
Gutteling is nowadays World Leader in production and assembly
of composite hoses for many applications like:
• Ship to Ship operations
• Ship to Shore operations
• Heavy duty Marine operations
• Emergency operations

Gutteling Composite hoses can be used for a wide range products:


• Oils
• Petrochemicals
• Chemicals
• LPG (@ -104°C)
• LNG (@ -164°C)
• Solvents
• Aromatics
Multi-LNG White Prototype testing
Gutteling has qualified Multi-LNG White
STS Transfer Hoses as first
manufacturer in the World to the latest
International rules for Ship to Ship LNG
transfer; EN 1474-II in 2009 and to EN
12434 in 2014

Shell Global Solutions has accepted


Gutteling Multi-LNG White Composite
Hoses for LNG Ship to Ship and LNG
Bunker operations since 2009 and are
using Gutteling Multi-LNG White
Composite hoses for many LNG transfer
projects around the World.
Successfully extended in
2018 untill 2023 with
DNVGL

Latest requirements from


DNVGL included
Gutteling Composite Hoses have achieved multiple
Type Approvals from class societies around the
world!
• DNV-GL
• ABS (American Bureau of Shipping)
• Lloyd’s Register
• Nippon
• Bureau Veritas
• Russian Register
• Korean Register

“The Leader in Composite Hose Design


and Transfer Risk Management”
Maran Gas
Posidonia LNG STS
2011 delivery of Multi-LNG White STS 8” hoses

Length : 27,00 meter


Quantity : 3 hoses
Transfers : > 30
Customer : MOL / JAPEX

2/11/2019
Since 2013 delivery of Multi-LNG White 6”
hoses
Length : 12,00 meter
Quantity : 2 hoses
Customer : Viking Grace in Stockholm
Application : Bunker ship to Ferry
Operation : Daily (30 minutes)
Gutteling Group presentation 2018
FIGS & FACTS
Operator Operation Hose size involved No. of transfers Av. Hose No. Total hose operations
Excelerate Ship to Ship 8” and 10” >2500 6 -8 lengths > 15.000
Hoegh LNG Ship to Ship 10” >1000 6 lengths > 6.000
BW LNG Ship to Ship 10” >500 6 lengths > 3.000
LNGSTS Ship to Ship 8” and 10” >1500 6 lengths > 8.000
Golar Ship to Ship 10” >200 6 lengths > 1.000
Bumi (Malta) Ship to Ship 10” >50 8 lengths > 400
JOVO Ship to Ship 8” >100 4 lengths > 400
ENGIE Zeebrugge LNG Bunkering 8” >50 2 lengths > 100
Seagas Viking Grace LNG Bunkering 6” >1500 1 length >1500
Cardissa Shell LNG Bunkering 6” 10 2 lengths 20
Yamal LNG Ship to Ship 8” and 10” >50 6 lengths >300
MOL / Japex Ship to Ship 8” >30 2 lengths >60
Paradus Energy Ship to Ship 10” Not known 6 lengths Not known
Others Ship to Ship / 2” – 10” >1000 Several >2.000
Bunkering
TOTAL > 35.000
Future steps…….

• Other hose sizes certified to EN 1474-II and EN 12434


• Design pressure upgraded to 21 bar up to 10”
• Hoses delivered for continuous LNG transfers
• Hoses delivered for Ship Shore interfaces
• Hoses certified to PED 2014/68/EU (by DNV-GL)
• 16” hoses developed, not been certified yet
• Longer hose lines to 40 – 50 meter
• LNG hoses with additional insulation
Contact Details

Sander verweij
Vice Managing Director
Gutteling Group

Ph. +31-10-2082550
Cell +31-653702377

Email: s.verweij@gutteling.com

Web site: www.gutteling.com

You might also like