Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Bhopal Metro Rail Project

Package BH-06

Member’s/Subcontractor’s legal name: ……………………… Page …. of …. Pages

PEB Work Experience (as per Appendix 15F)

Sr. Year Description of % participation in Considered area in Span of


No. erected PEB Works case of JV/ square metre of erected PEB
Consortium PEB Works by Building
(100% in case of Tenderer/ member (in in metre
single entity) case of JV/Consortium)/
Subcontractor

Total

Signature of authorized signatory on behalf of Tenderer


Note:
1. Refer Note (vi) of EQC Para 10.2.2 for qualifying value/quantum of work(s).

Attachment – 7 to Corrigendum – 2, Date: 10.11.2021 Page 32 of 80

You might also like