3 Nippon Koei MR Namba Basic Approach CS 191130 Ref 1
3 Nippon Koei MR Namba Basic Approach CS 191130 Ref 1
Team Leader
Konsultan Supervisi
Nippon Koei
Supervision by Consultant
Pengawasan oleh Konsultan
1. Opening Remarks (Introduction of Nippon Koei)
Kata Sambutan oleh Nippon Koei
2. Presentation (The Consultant)
Presentasi (Konsultan)
a) Organization for Project Implementation
Organisasi Pelaksanaan Proyek
b) Basic Approach of Construction Supervision
Dasar Pendekatan Pengawasan Konstruksi
2
NK’s Track Records
Nippon Koei Co., Ltd. (NK), the core firm
of Nippon Koei Group (NKG) was
founded in 1946.
Over the last 72 years, the group has
provided consulting and engineering
services in 160 countries.
As of July 2018, NKG has been awarded Courtesy Visit (Philippines)
Courtesy Visit (Indonesia)
8,000 contracts for the road sector in 80
countries.
3
Nippon Koei Group
Since NKG consists of NK and 25 subsidiaries
including IKI (INDOKOEI) and PKII (PHILKOEI)
and employs 4,900 staff,
NKG adopts matrix management to enhance
both functionality and project services.
4
Experiences: PT. Indokoei International
5
NK’s Major Works in Indonesia
6
NK’s Road Sector
NKG provides services for MP, FS, DD, CS
O&M, ITS and Architectural Design.
25 Projects in Indonesia incl. 12 for CS.
29 Projects in Philippines incl. 9 for CS, such
as Subic-Clark-Tarlac Expressway
Architectural Design
NKG menyediakan jasa untuk
Manajemen Proyek, Studi Kelayakan,
Detail Desain, Pengawasan Konstruksi,
Dan Desain Arsitektural).
25 Proyek di Indonesia termasuk 12 untuk
Pengawasan Konstruksi.
29 Proyek di Filipina termasuk 9 untuk
Pengawasan Konstruksi, seperti Jalan
Bebas Hambatan Subic-Clark-Tarlac
7
Ujung Pandang Toll Road Section 3 (Pettarani Elevated Toll Road) Makassar
November 2019
8
Organization for Project Implementation
Organisasi Pelaksanaan Proyek
Authority / Otoritas Stakeholders / Pemangku Kepentingan
Bina Marga South Sulawesi Province
District of Makassar
(depts. of fire, public
works, employment,
environmental, civil police,
The Employer / Badan Usaha Jalan Tol
transportation, etc.)
Investor Resort Police Dept.
PT. Margautama PT. Bosowa Marga Nusantara Highway Police Dept.
Nusantara 1. Project Owner Utility Companies
2. Project Board
3. Support & Advisory Team
(Clause-2 in YB)
Local Agency
1. Public Work Agency
Highway Police Department
2. Spatial Planning Agency
3. Housing and Settlement Agency
4. Civil Service Police Unit
5. Fire Department
6. Social Agency
7. Employment Agency
8. Environmental Services
9. Department of Transportation
10. Department of Communications and
Makassar Sub- Informatics
District
10
Organization of The Engineer / Organisasi Enjinir
Management Legend
Schedule Manager
Safety Engineer
Quality/Quantity Control
Erectric Group
Sr. Bridge Engineer 2 Sr. Bridge Engineer
Material Quantity
Surveyor 1 Road Group Electric
Engineer
Quantity Bridge Engineer 1 Bridge Engineer 2
Road Engineer
Surveyor 2
April 2018
13
Contents / Daftar Isi
2
I. MISSION STATEMENT OF Construction Supervision
• Mission Statement
• Output
Provision of Sound and Healthy
Infrastructure To People of Indonesia
3
II. BASIS OF CONDITIONS OF CONTRACT
II. DASAR PERSYARATAN KONTRAK
Conditions of Contract for Plant and Design Build, 1999
Persyaratan Kontrak untuk Instalasi dan Rancang Bangun, 1999
Yellow Book 4
III. SAFETY CONTROL (1/2)
• Establishment of Safety Committee and Periodical Monitoring of Jobsite
Conditions Through Safety Patrol.
5
Safety Control (2/2)
The Contractor shall be responsible for safety of all Site operations and of all methods of construction. (Clause 4.1)
The Contractor shall comply with applicable safety regulations, take care for the safety of all persons entitles to be on the Site, ….
(Clause 4.8)
Kontraktor harus bertanggung jawab atas seluruh pekerjaan lapangan dan seluruh metode konstruksi (klausul 4.1)
Kontraktor harus memenuhi peraturan keselamatan yang berlaku, menjaga keselamatan seluruh orang yang semestinya ada di
lapangan,… (klausul 4.8)
Safety Committee Monitoring Work
Plan
Safety
The Employer
Patrol
Improve PDCA Cycle Do
The Engineer
Safety
Meeting Check
The Contractor
Safety
Checklist
Work Plan
Work plan, Work method, Coordination,
Check items for safety, etc.
6
IV. Progress control (1/2)
• Close Monitoring of Progress in Time Management through
Progress Meeting and Site Inspection
Pemantauan Pencapaian Pekerjaan dengan Manajemen Waktu
melalui Pertemuan Pencapaian Pekerjaan dan Inspeksi
Lapangan
7
Progress Control (2/2)
Pengendalian Pencapaian Lapangan
< Flow of Control >
Construction
Schedule of the Progress Coordination
Contractor Inspection
Meeting Meeting
Monitoring
⚫Work progress Collection of data and information
⚫Effect to overall
Instruction to the
schedule due to delay
Contractor
⚫ Evaluation of Critical
Path NOTE:
⚫ Overall evaluation of The progress of the work will be monitored
the progress and the Contractor will be advised for
smooth execution of the work.
Reporting to the
Employer
No
Acceptable?
Yes
To Maintain the
Progress 8
V. Utility Relocation
9
VI. Quality control (1/2)
10
Quality control (2/2)
Pengendalian Mutu
< Flow of Control during Construction>
Material Workman-ship Plant Site Condition
No No No No
satisfy satisfy satisfy satisfy
spec.? spec.? spec.? spec.?
Yes Yes Yes Yes
Approval
Approval Approval Approval
for use
12
Cost control (2/2)
Pengendalian Biaya
< Flow of Control >
Quantity Quality
Measurement Test Results
Preparation of MC based on
Accepted quantity and priced
BOQ Price
Claims Adjustment
Revision of
MC Evaluation
Cost control shall be based on the MC
submitted by the Contractor.
Actual work quantity, claim, variation
No
Acceptable ? order, price adjustment, etc. shall be
evaluated and reflected.
Yes
Measurement shall be made accurately.
Approval by The Employer
The Employer
The Contractor
No Yes
Final ? End
13
VIII. Environmental monitoring (1/2)
14
Environmental Protection (2/2)
Perlindungan Lingkungan
Measures for Protection or Recovery/Mengukur
The Contractor untuk Perlindungan dan Pengembalian Kondisi
People affected
15
ARIGATO
GOZAIMASU
TERIMA KASIH