Briefing by the San Antonio Water System (SAWS) and CPS Energy on the status of
implementing the recommendations from the Committee on Emergency Preparedness'
Report [Ben Gorzell Jr., Chief Financial Officer; Troy Elliott, Deputy Chief Financial
Officer]
A) SAWS Staff will provide a status report on the utility’s actions implementing the
recommendations from the Committee on Emergency Preparedness’ Report. (15 minutes)
B) CPS Energy Staff will provide a status report on the utility’s actions implementing the
recommendations from the Committee on Emergency Preparedness’ Report. (15 minutes)
City of San Antonio
Agenda Memorandum
SUBJECT:
SAWS and CPS Energy status reports on recommendations from the Committee on Emergency
Preparedness
SUMMARY:
Status reports on the utilities’ actions implementing the recommendations from the Committee on
Emergency Preparedness’ Report.
A. SAWS
B. CPS Energy
BACKGROUND INFORMATION:
From February 13, 2021 to February 19, 2021, the continental United States experienced a
severe winter storm referred to as Winter Storm Uri, which significantly impacted the City of
San Antonio. On February 22nd, the Mayor created the Committee on Emergency Preparedness
and tasked the Committee with studying the event to determine what happened and to provide
recommendations on what needs to be done to better prepare for future winter weather
emergency events. The Committee’s Report was presented to City Council on June 24, 2021.
ISSUE:
A. SAWS Staff will provide a status report on implementing the recommendations from the
Committee on Emergency Preparedness’ Report – 15 minutes
B. CPS Energy Staff will a provide status report on implementing the recommendations from
the Committee on Emergency Preparedness’ Report – 15 minutes.
RECOMMENDATION:
Plan and acquire all necessary equipment for emergency water filling locations (bulk water
distribution) around the city that can be set up rapidly in times of emergency and establish
messaging to rapidly inform the community of their locations when needed.
6.A Develop procedures with the City of San Antonio and increase joint readiness for bottled
water distribution. SAWS and the City should invest in a stockpile of 10-year shelf-life water
that can be distributed in emergency situations and rotated out every 8 years to ensure it
remains potable.
• SAWS has increased the inventory of bulk water distribution equipment
• SAWS is exploring partnerships with local business on bottled water production as well as purchasing
and storing 10-year shelf-life water. After procurement process of water has been established, a water
distribution plan will be developed with COSA. Communications will be included in the water
distribution planning process.
Cost: More than $1,000,000
Completion Date: 2022
November 30, 2021 Page 8
Assign a team to assess, implement, and track the progress of the current
recommendations from the Emergency Preparedness Plan and update the
plan regularly.
• SAWS is tracking the progress of all recommendations from CEP, B&V report, SAWS
staff and the SAWS Board of Trustees.
• SAWS currently has contracted with consultants and meets regularly with CPSE to
update the emergency preparedness plan required by Senate Bill 3. Planning teams
(representatives from different departments) track progress and update the plans.
Cost: Between $100,000 and $1,000,000
Completion Date: 2021 with future updates
November 30, 2021 Page 11
Update SAWS organizational chart and place online for easy reference.
• Updated organization chart has been uploaded to SAWS website and can be easily
located on the
Organization & Leadership section under the About SAWS page.
http://www.saws.org/wp-content/uploads/2020/09/OrgChart_20200910.pdf
Cost: Less than $100,000
Completion Date: 2021
November 30, 2021 Page 13
Integrate a SAWS decision maker fully into the EOC with direct and
immediate access to SAWS Chief Operating Officer for centralized
control/decentralized execution.
• This recommendation will not be implemented as outlined. As a resolution to this
issue, SAWS will move operations to the COSA EOC during declared emergencies to
operate under Unified Command. SAWS’ COO will be the Incident Commander and
work with COSA Incident Commander to coordinate an effective response while at
the same time allowing SAWS to manage water system operations.
Cost: Less than $100,000
Completion Date: 2021
November 30, 2021 Page 16
SAWS and CPS Energy should meet to discuss CPS Energy’s compliance
with Chapter 25 Subsection C (Infrastructure and Reliability) of the Public
Utility Commission’s Electric Substantive Rules and discuss the role of SAWS
in respect to these compliance measures.
• SAWS has worked with CPS for inclusion of SAWS as a Critical Load Public Safety
Customer on the CPSE registry within its emergency plan.
Cost: Less than $100,00
Completion Date: 2021
SAWS Progress
Community Emergency Preparedness
Committee Report
Steven Clouse
Senior Vice President/Chief Operating Officer
2
AGENDA
• NEXT STEPS
3
CoSA CEP RECOMMENDATION
STATUS OVERVIEW
CEP RECOMMENDATION CEP RECOMMENDATION Customer
ACTION PLAN STATUS CATEGORIES Communication
3 4 Emergency/Contingency
11%
16% Preparedness
Under Review
Grid Operations &
Support
5%
In Progress Market Redesign
12
8% 30%
Approved Outage Management
18 Plant Operations
14%
Submitted to MUC & Support
16% Stakeholder
Communication
5
CoSA CEP RECOMMENDATION
PLANT OPERATIONS & SUPPORT – 4
CEP Recommendation: Support operational excellence at generation plants
CPS 4 through renewed emphasis and focus on best
practices
CPS Priority: 1 Resolution: CPS Energy is completing several operational
excellence initiatives before the upcoming winter:
Status: In Progress 1) Implement key elements of weatherization improvement
plan
Estimated Completion Date: 2) Conduct repairs for aging burner systems & upgrades to
12/31/2021 Spruce fan control system
Estimated Cost: 3) Revise 2021 - 2022 Planned Outage Schedule to
maximize CPS Energy's unit availability this winter
4) Perform a detailed inspection of all outside piping &
revised Freeze Protection Program at the South Texas
Project
Note: Complete, pending Administrative Closeout
6
CoSA CEP RECOMMENDATION
OUTAGE MANAGEMENT– 5
CEP Recommendation: CPS Energy should review the automated rotating
CPS 5 outages process
9
CoSA CEP RECOMMENDATION
COMMUNICATIONS – 8
CEP Recommendation: Collaborate with the CoSA EOC to develop emergency communications
procedures
CPS 8 A. Simplify customer messaging with focus on safety and clear calls to action
B. Revise and enhance how conservation calls are communicated to public
C. Develop advanced notification process for mandatory load shed event;
Coordinate messaging with the Emergency Operations Center (EOC);
Provide advanced notification of mandatory load shed events where
possible; Consider informing customer if they are subject to the risk of
power loss during mandatory load shed events; Provide customer with key
information for support services
10
CoSA CEP RECOMMENDATION
COMMUNICATIONS – 9
CEP Recommendation: Collaborate with the CoSA and municipal partners
CPS 9 to develop a continuous emergency preparedness
campaign
CPS Priority: 5 Resolution: CPS Energy met with CoSA and SAWS
and determined in the short term, CPS Energy will
Status: In Progress
share Ready South Texas information as part of our
Estimated Completion Date: ongoing awareness campaign.
12/31/2021
Estimated Cost:
11
CoSA CEP RECOMMENDATION
MARKET REDESIGN – 1
CEP Recommendation: A. Support legislation development that ensures ERCOT has
CPS 1 sufficient reserve capacity from all generation sources
B. Support the state's evaluation of making an investment to
connect to grids outside of Texas
C. Suggest that the state pursue efforts to guarantee loans
to build or contract additional capacity to meet demands
Estimated Cost:
12
CoSA CEP RECOMMENDATION
MARKET REDESIGN – 3
CEP Recommendation: Support development of legislation that ensures
CPS 3 ERCOT has sufficient energy reserve capacity from
all generation sources
CPS Priority: 6 Resolution: CPS Energy is engaging in 34 meetings
addressing 37 PUC rulemakings & ERCOT protocol
Status: In Progress
revisions that address energy market redesign. We
Estimated Completion Date: will continue to monitor and engage until closure.
12/31/2021
Estimated Cost:
13
CoSA CEP RECOMMENDATION
SAWS – 2, 3, 5, 8, 16
CEP Recommendation: Support SAWS in improving their resiliency,
SAWS 2, 3, 5, 8, & 16 emergency preparedness, communications
protocols & PUC compliance.
CPS Priority: Various Resolution:
1) Met with SAWS to identify critical sites
Status: Various 2) Continue progress on resiliency improvement plans
3) Conducted table-top exercises with focus on
Estimated Completion Date: communication & readiness
12/31/2021 4) Collaborated on joint operations including load shed
Estimated Cost: criteria
5) Maintain effort with SAWS in developing options for on-
site back-up generation
14
CoSA CEP RECOMMENDATION
EOC – 1-3, 8, 10-14, 18-20, 23-24
CEP Recommendation: Support CoSA EOC in their efforts to improve their
EOC 1-3, 8, 10-14, 18- resiliency, emergency preparedness,
20, 23-24 communications protocols & overall emergency
operations during extended duration outages.
CPS Priority: Various Resolution:
1) CoSA EOC identified preliminary list of critical facilities
Status: Various 2) Continue to inform & support resiliency improvement
plans
Estimated Completion Date: 3) Conducted table-top exercises with focus on
12/31/2021 communication & readiness
Estimated Cost: 4) Held meetings with partners to build understanding &
communication channels
5) Updated our Crisis Communication Plan to ensure
synchronous communications
15
Winter Preparations
Plant Operations & Support
• Enhanced weatherization completed Stakeholder Communications
• Third-party validation of improvements
• Increased natural gas storage ability • Ongoing collaboration with City of San Antonio, Bexar
County, SAWS & emergency operations
• Moved plant maintenance schedule ahead of winter
months
• Launched stakeholder text alerts
• Engaging in public input & feedback opportunities
Outage Management
Customer Communications
• Improved load-shed capacity with more circuits to
minimize customer impact, i.e., better rotation of
• Review & refresh communications plans
outages
• Multi-pronged approach to reach customers
• Third-party validation of improvements • Updated 100,000 customer contacts through Manage My
Account to date
• Additional use of advanced technologies
• Community town halls & utility assistance fairs
Grid Operations & Support
Policy Activity
• More collaboration with City of San Antonio, Bexar
County, SAWS & emergency managers
• Engaging with local, state & federal regulators & policy
makers
• Review of procedures completed
• Updated procedures for winter operations • Participating in regulatory proceedings
• Involved in development of ERCOT protocol revisions
Emergency Preparedness
• Ongoing participation in local, state & federal training
• Executive liaison assigned to regional Emergency
Operations Center