Lab Report (Traverse Exercise)
Lab Report (Traverse Exercise)
Traverse Exercise
Syndicate-2
INDEX
1 Report
2 Traverse sketch A
3 Computation of bearing of B
traverse lines
4 Computation of coordinates of C
control points
5 Abstract of observed angles D
Aim of the task:
The purpose of performing this task was to establish control points in NICE area by the method of
traverse.
NICE( NUST Institute of Civil Engineering) is spread over an area of 600 feet x 500 feet. It is located on
the western side of H-12 Sector Islamabad. As it is a relatively compact area, so the method of closed
traverse was used.
Given data:
The coordinates of following points were given:
Station A:
a)Northing: 3450269.11
b)Eastings: 10515523.18
Station B
a)Northing : 3450559.90
b)Eastings: 10515318.20
Instrument used:
The following instruments were used during this traverse exercise:
1. Total station.
2. Tripod mounted prism.
3. Plumbline.
4. Tripod stand.
1. Bearing of the base line was computed from the given coordinates of control points B and A
being (E=10515318.20, N=3450559.90, H=1833.27)
2. Bearings of the remaining lines were computed by combining the observed angles with
opening bearing of the base line. These were obtained as follows:
Points Bearings
B→A 144°49’11”
B→C 263°04’16’’
C→D 189°05’46’’
D→E 100°55’32’’
E→F 125°17’26’’
F→A 54°58’28’’
A→ B 324°49’11”
No errors were found in computations as they had already been corrected beforehand.
Coordinates:
1. Coordinates of the stations were computed by combining the bearings of lines ( θ ) with
the distance of lines and coordinates of the known points. For this purpose, we used
these two formulas for eastings and northings:
EB = EA + ΔE where ΔE = L*sinθ , and
NB = NA + ΔN where ΔN = L*cosθ
The coordinates were found as follows:
Points Eastings(ft) Northings(ft)
2. Misclosures of eastings and northings and the Fractional Linear Misclosure (FLM) were
computed as follows:
a. Summary of Results:
The following are the final coordinates of the point calculated after applying
corrections:
b.
c.
1 A 10515523.24 3450269.08
2 B 10515318.20 3450559.90
3 C 10515045.46 3450526.78
4 D 10515018.40 3450357.85
5 E 10515229.62 3450317.08
6 F 10515409.74 3450189.60
Analysis of Results:
We used a total station for our measurements have least count 10 seconds, we took the reading three
times to minimize errors from left and right phase each. It was a fine weather with good conditions
during observations . Luckily, we achieved the highest accuracy standards achieved with no error.
Weather Conditions:
1. The day had a pleasant atmosphere throughout the day.
2. It was cloudy and carried minimum wind passing by.
3. Altogether, it provided the optimum atmosphere to note down coordinates.
Conclusion :
The coordinates calculated during this traverse exercise meet the required accuracy standards and can
be used for making topographic map of the area.