Inspection Test Plan (ITP) Procedure-Digabungkan
Inspection Test Plan (ITP) Procedure-Digabungkan
TRAFFO : SPP TE12E Approved PT. PPTYPE of PROJECT : Transformer Installation, Pre - Commissioning & Commissioning Portsite Power Plant Dual Fuel 140MW
TAG NO : -
S/N : JOB NO :
INSPECTION AND TEST PLAN
PREPARED
CLIENT: PT. Freeport Indonesia COMPONENTS / ITEMS: 5
BY:Feby
PSPP Transformer Installation, Pre – Commissioning & Commisioning APPROVED BY:
PROJECT: Page 1
Portsite Power Plant Dual Fuel 140 MW Tri P.
ISSUE DATE:
ORDER #: GSU REFF. NO : IPFC/QAC/004
1.05.2021
REVISION:
QTY 1 APPLICABLE QA STANDARD : ISO 9001 : 2008
00
ACCEPTANCE LEVEL OF ACCEPTANCE/ VERIFYING ACTIVITY TYPE ACTIVITY VERIFICATION REMARKS
No. FLOW OF ACTIVITIES AND TEST / INSPECTION REFERENCE DOCUMENT FACTORY GSU CLIENT FACTORY GSU CLIENT
CRITERIA/METHOD
I INCOMING INSPECTION
1 Transformer Visual Check, OC & PO, IOM, Data Sheet IQC Check Sheet I V
2 Accessories for Tranformer set system Visual Check, OC & PO, IOM, Data Sheet IQC Check Sheet I V
II INPROCESS INSPECTION
1 Assembly Transformer Visual check, Dimension check Work Instruction QC In process Doc. I V
2 Installation cable, panel, etc Wiring, continuity PP Standard Production Report I V
5 OElectrical and Mechanical trip test until breaker trip PP Standard PP Standard Test Report T R V R
9 Ratio and non load current at low voltage PP Standard PP Standard Test Report T R V R
12 Tan delta and capacitance of winding measurement PP Standard PP Standard Test Report T R V R
1 Complete Transformer Unit Final Inspection for compliance SPP Standard QC Out Going Doc. I V R
IV DOCUMENTATION
OElectrical and Mechanical trip test until breaker trip Testing Report PP
I = INSPECTION
DATE POSITION / NAME AUTHORISED COMPANY OFFICER REMARKS APPLICABLE DRAWINGS/DOCUMENTS
T = TEST
V = VERIFICATION
GSU Engineering Dicky Done ITP is computer-generated and is valid without signature