NO NAMA DOKUMEN
I Sampul I
Dokumen Penawaran Administrasi dan Teknis
2 Volume Pekerjaan
I Preparation Work & Temporary Facilities
II Engineering & Project Management
III Civil
IV Mechanical Equipment
V Piping
VI Pipeline
VII Instrument
VIII Elektrical
IX Inspection, Testing & Commisioning
X Pekerjaan Finishing
2 Site Manager
6 Construction Coordinator
7 Process Engineer
8 Mechanical Engineer
9 Piping/Pipeline Engineer
11 Electrical Engineer
12 Civil/Structure Engineer
13 QA/QC Coordinator
14 HSSE Coordinator/Engineer
16 Document Controller/Admin
17 Drafter/Designer CAD
III Tenaga Terampil
1 Welder
2 Rigger
3 Fitter
4 Operator Alat Berat
5 Operator Alat Khusus
6 Peralatan Utama
I Alat Kerja Utama
II Alat Kerja Pendukung
7 Metodologi Pelaksanaan
II Sampul II
Dokumen Penawaran Harga
100.00 80.00
- Mario
Rendra
Handrian
Havid
Havid
Havid
Ibnu/Iman
Ilham/Taupan
Iqbal
Iqbal
- Yoga
20.00 Rizki/Mario
Handrian/Tedi
Havid/Nizar
Havid/Nizar
Havid/Nizar
Ibnu/Iman
Ilham/Taupan
Mega/Fajri
Mega/Fajri
Mega/Fajri
Iman/Mario/Mega/Fajri
Mario/Mega/Fajri
Mega/Fajri
Mega/Fajri
Mega/Fajri
Mega/Fajri
Mega/Fajri
15.00 M. Riyanto
5.00
5.00
M. Riyanto
5.00
M. Riyanto
M. Riyanto
M. Riyanto
15.00 Rahayu/Rian
Rahayu/Rian
Rahayu/Rian
(S1 Teknik, Pengalaman kerja
15 tahun, Min. 5 tahun sbg
Project Manager)
(S1 Teknik, Pengalaman kerja
min. 10 tahun, Min. 3 tahun sbg
Site Manager)
(S1 Teknik
Mesin/Kimia/Sipil/Fisika/Materi
al , Pengalaman kerja min. 7
tahun, Min. 5 tahun sbg Project
Engineer)
(S1 Teknik
Mesin/Kimia/Sipil/Fisika/Materi
al , Pengalaman kerja min. 10
tahun, Min. 5 tahun sbg
Engineer Coordinator)
(S1 Teknik, Pengalaman kerja
min. 10 tahun, Min. 5 tahun sbg
Procurement Coordinator)
(S1 Teknik
Mesin/Sipil/Material ,
Pengalaman kerja min. 10
tahun, Min. 5 tahun sbg
Construction Coordinator)
(S1 Teknik
Mesin/Material/Kimia ,
Pengalaman kerja min. 7 tahun,
Min 5 tahun sbg Mechanical
Engineer)
(S1 Teknik
Mesin/Material/Kimia ,
Pengalaman kerja min. 7 tahun,
Min. 5 tahun sbg
Pipeline/Piping Engineer)
(S1 Teknik/SKM/K3 ,
Pengalaman kerja min. 7 tahun,
Min. 5 tahun sbg HSSE
Coordinator/Engineer)
Rahayu
Rahayu
Rahayu
Rahayu
5.00 Eras/Rahayu/Rian
2.50 Eras/Rahayu/Rian
2.50 Eras/Rahayu/Rian
10.00 Rizki/Eras/Rudi
20.00 Rahayu/Rian
10.00 Rahayu/Rian
10.00 Rahayu/Rian
15.00 Rizki/Eras/Rendra
Rizki/Eras/Rendra
1.67
1.67
1.67
1.67
1.67
1.67
1.67
1.67 Rizki/Eras/Rendra
1.67 Rizki/Eras/Rendra
28.00
20.00
8.00
33.00
12.00
21.00
38.00
10.00
4.00
4.00
12.00
8.00
57.00
57.00
45.00
16.00
23.00
6.00
46.00
10.00
10.00
8.00
8.00
10.00
37.00
29.00
8.00
8.00
Novi
Rahayu/Firansyah/Hana
25 Agustus 2021
25 Agustus 2021
25 Agustus 2021
25 Agustus 2021
25 Agustus 2021
25 Agustus 2021
25 Agustus 2021
30 Agustus 2021
19 Agustus 2021
19 Agustus 2021
23 Agustus 2021
23 Agustus 2021
23 Agustus 2021
26 Agustus 2021
26 Agustus 2021
19 Agustus 2021
19 Agustus 2021
19 Agustus 2021
30 Agustus 2021
19 Agustus 2021
23 Agustus 2021
23 Agustus 2021
23 Agustus 2021
26 Agustus 2021
26 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
Menunggu Harga
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
30 Agustus 2021
25 Agustus 2021
25 Agustus 2021
25 Agustus 2021
25 Agustus 2021
30 Agustus 2021
30 Agustus 2021
KETERANGAN
Volume Pekerjaan
I Preparation Work & Temporary Facilities Rendra
II Engineering & Project Management Rendra / Rudi
III Civil Tedi
IV Mechanical Equipment Havid
V Piping Havid
VI Pipeline Havid
VII Instrument Ibnu/Iman
VIII Elektrical Ilham/Taupan
IX Inspection, Testing & Commisioning Iqbal
X Pekerjaan Finishing Iqbal
Due Date
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
PIC : WENDRA - RIAWAN
Dokumen HSE Plan DUE DATE
CLOSE
CLOSE
CLOSE
CLOSE
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
80%
No NO DOKUMEN
SPECIFICATION
General Spec. for Civil & Structure Use Client data Sheet NK
Specification for Concrete Work Use Client data Sheet NK
Specification for Building & Shelter (Baja Profil & Tulangan) Use Client data Sheet NK
Specification for Site Preparation Excavation & Back fill CY#3 as Reference NK
Specification for Foundation CY#3 as Reference NK
Specification for Pilling Work CY#3 as Reference NK
Specification for Road CY#3 as Reference NK
Specification for Fence and Gate CY#3 as Reference NK
PROCEDURE
Concrete Foundation Work Procedure CY#3 as Reference NK
Soil Investigation Procedure CY#3 as Reference NK
Site Preparation Procedure CY#3 as Reference NK
Construction Procedure For Fabrication of steel structure CY#3 as Reference NK
Design Basis for Civil & Structural CY#3 as Reference NK
Bore pile Procedure CY#3 as Reference NK
Clearing and Grading Procedure CY#3 as Reference NK
Construction Procedure For Erection of steel Structure CY#3 as Reference NK
Construction Procedure For Sewer and Drainage Work CY#3 as Reference NK
Evaluasi Teknis Status
No NO DOKUMEN
SPECIFICATION
General Spesification for Pumps yes 95%
General Spesification for Pig Launcher / Pig Receiver yes 95%
General Spesification for Vessel yes 9/8/2021
DESIGN BASIS
Mechanical Design Basis Additional 9/10/2021
CALCULATION
Strengh Calculation Pig Launcher Additional 9/10/2021
Strengh Calculation Pig Receiver Additional 9/10/2021
Shell & Bottom Thk Calc. for Diesel Storage Tank Additional 9/10/2021
DRAWING
GA Drawing Pig Launcher Additional 9/10/2021
GA Drawing Pig Receiver Additional 9/10/2021
GA Drawing Diesel Storage Additional 9/10/2021
No NO DOKUMEN
DATA SHEET
Pressure Safety Valves yes Use Client data Sheet
Control Valves yes Use Client data Sheet
Motor Operating Valves yes Use Client data Sheet
Shut Down Valves yes Use Client data Sheet
Pressure Indicator Transmitter yes Use Client data Sheet
Pressure Gauge yes Use Client data Sheet
Pressure Differential Indicator Transmitter yes Use Client data Sheet
Temperature Indicator Transmitter yes Use Client data Sheet
Level Indicator Transmitter yes Use Client data Sheet
Pig Signaller yes Use Client data Sheet
Densito Meter yes Use Client data Sheet
LBV yes Use Client data Sheet
Metering System yes Use Client data Sheet
Fibre Optic Cables yes Use Client data Sheet
Fire and Gas Device yes Use Client data Sheet
Flow Indicator Additional
Status / Due
PIC
Date
NK 95%
95%
95%
NK 95%
NK 95%
NK 95%
NK 95%
NK 75%
NK 95%
NK 95%
NK 95%
NK 95%
NK 95%
NK 95%
NK 95%
NK 95%
NK 95%
NK 95%
NK 95%
NK 95%
NK 95%
NK 95%
NK 95%
95%
DELIVERABLE LIST
No No Dokumen
SPECIFICATION
General Specification For Electrical System Additional Use Client data Specification NK
Specification For Diesel Engine Generator (DEG) yes CY#3 as Reference NK
Specification for Transformer yes Use Client data Specification NK
Specification for MV Switch Gear yes Use Client data Specification NK
Specification for LV Switch Gear / MCC yes CY#3 as Reference NK
Specification for VSD yes CY#3 as Reference NK
Specification For Uninteruptible Power Supply (UPS) yes CY#3 as Reference NK
Specification for Cathodic Protection System yes CY#3 as Reference NK
Include dok power cable, lighting
Specification For Electrical Cable and Cable Trays yes
cable & Earthing Cable NK
Specification For Lighting & Receptacle yes CY#3 as Reference NK
Specification For Induction Motor Additional CY#3 as Reference NK
Specification For Grounding and Lightning Protection Sys Additional CY#3 as Reference NK
Specification For Electrical Bulk Materials CY#3 as Reference NK
Specification For Local Control Switch CY#3 as Reference
Specification For Solar Cell supply System CY#3 as Reference
DESIGN BASIS
Electrical Design Basis Additional CY#3 as Reference NK
DRAWING
Overall Single Line Diagram Additional CY#3 as Reference NK
STATUS /
DUE DATE
95% 9/10/2021
95% 9/10/2021
95% 9/10/2021
95% 9/10/2021
95% 9/10/2021
95% 9/10/2021
95% 9/10/2021
95% 9/10/2021
95% 9/10/2021
95% 9/10/2021
95% 9/10/2021
0% Specification
80% 9/10/2021
95% 9/10/2021
95% 9/10/2021
95% 9/10/2021
95% 9/10/2021
95% 9/10/2021
95% 9/10/2021
0% Data sheet
0% 9/10/2021
0% 9/10/2021
0% 9/10/2021
0% 9/10/2021
0% 9/13/2021
DELIVERABLE LIST
No No Dokumen
PIPELINE
DESIGN BASIS
1 PPB - EPC - 00 - PPL - DB - 001
DATA SHEET
1 PPB - EPC - 00 - PPL - DS - 001
SPECIFICATION
1 PPB - EPC - 00 - PPL - SP - 001
2 PPB - EPC - 00 - PPL - SP - 002
3 PPB - EPC - 00 - PPL - SP - 003
4 PPB - EPC - 00 - PPL - SP - 004
5 PPB - EPC - 00 - PPL - SP - 005
6 PPB - EPC - 00 - PPL - SP - 006
7 PPB - EPC - 00 - PPL - SP - 007
8 PPB - EPC - 00 - PPL - SP - 008
9 PPB - EPC - 00 - PPL - SP - 009
10 PPB - EPC - 00 - PPL - SP - 010
LIST
1 PPB - EPC - 00 - PPL - LS - 001
CALCULATION
1 PPB - EPC - 00 - PPL - CA - 001
DRAWING
1 PPB - EPC - 00 - PPL - DG - 001
2 PPB - EPC - 00 - PPL - DG - 002
3 PPB - EPC - 00 - PPL - DG - 003
4 PPB - EPC - 00 - PPL - DG - 004
5 PPB - EPC - 00 - PPL - DG - 005
6 PPB - EPC - 00 - PPL - DG - 006
MTO
1 PPB - EPC - 00 - PPL - MTO - 001
2 PPB - EPC - 00 - PPL - MTO - 002
3 PPB - EPC - 00 - PPL - MTO - 003
4 PPB - EPC - 00 - PPL - MTO - 004
5 PPB - EPC - 00 - PPL - MTO - 005
6 PPB - EPC - 00 - PPL - MTO - 006
7
8 PPB - EPC - 00 - PPL - MTO - 007
9 PPB - EPC - 00 - PPL - MTO - 008
PIPING
DESIGN BASIS
1 PPB - EPC - 00 - PIP - DB - 001
DATA SHEET
1 PPB - EPC - 00 - PIP - DS - 001
2 PPB - EPC - 00 - PIP - DS - 002
3 PPB - EPC - 00 - PIP - DS - 003
SPECIFICATION
1 PPB - EPC - 00 - PIP - SP - 001
2 PPB - EPC - 00 - PIP - SP - 002
3 PPB - EPC - 00 - PIP - SP - 003
MTO
1
2 PPB - EPC - 00 - PIP - MTO - 001
3 PPB - EPC - 00 - PIP - MTO - 002
Evaluasi
Equipment REMARK
Teknis
DESIGN BASIS
Onshore Pipeline Design Basis Additional CY#3 as Reference
DATA SHEET
Data Sheet For mother pipe for bend yes CY#3 as Reference
Data Sheet For Pipe Casing, Spacer, End Seal and Accessories yes CY#3 as Reference
SPECIFICATION
Specification for pipeline material yes CY#3 as Reference
Specification for Casing for Road & Railway Crossing yes Use Client Specification
Specification For Onshore Distribution Pipeline Valve yes CY#3 as Reference
Specification For Anchor Flange yes CY#3 as Reference
Specification for Insulation Joint yes Use Client Specification
Specification for Field Joint Coating yes CY#3 as Reference
General Specification for Painting & Coating yes Use Client Specification
Specification for Pipe Stress Analysis Additional Use Client Specification
Specification for Horizontal Directional Drilling Additional Use Client Specification
Specification For Pipe Bending Additional CY#3 as Reference
LIST
List Block Valve Additional CY#3 as Reference
CALCULATION
Pipeline Wall Thickness Calculation Additional CY#3 as Reference
DRAWING
Typical Pipeline Crossing (Foreign Line Crossings) Additional CY#3 as Reference
Typical Pipeline Block Valve Additional CY#3 as Reference
Typical Drawing For Pipeline Road Crossing Additional CY#3 as Reference
Typical Drawing For Pipeline Railway Crossing Additional CY#3 as Reference
Typical Drawing For Pipeline River Crossing Additional CY#3 as Reference
Typical Pipeline Ditch Additional CY#3 as Reference
MTO
MTO For Line Pipe Additional CY#3 as Reference
MTO For Onshore Pipeline Valves Additional CY#3 as Reference
MTO For Pipeline Fittings Additional CY#3 as Reference
MTO For Pipeline Flange, Gasket, Bolt and Nuts Additional CY#3 as Reference
MTO Sheet For Insulating Joint Additional CY#3 as Reference
MTO For Field Joint Coating Additional CY#3 as Reference
MTO For Pipe Casing, Spacer, End Seal and Accessories Additional CY#3 as Reference
MTO For Anchor Flange Additional CY#3 as Reference
MTO For Barred Tee Additional CY#3 as Reference
DESIGN BASIS
Piping Design Basis Additional CY#3 as Reference
DATA SHEET
Data Sheet for Valves yes CY#3 as Reference
Data Sheet for Strainer yes Use Client data Sheet
Data Sheet For Flexible Joint yes CY#3 as Reference
SPECIFICATION
Specification for Piping Material yes Use Client Specification
Specification for Valves yes Use Client Specification
General Specification For Painting and Coating / Wrapping yes CY#3 as Reference
Spec. Fitting yes
Spec Specialties yes include di spec. piping
Spec. Gasket yes material
Spec. Bolt & nut yes
Specification for Pipe Stress Analysis Additional Use Client Specification
Specification For Piping Fabrication, Welding, Inspection and
Testing Additional CY#3 as Reference
MTO
MTO For Flange, Gasket, Bolt and Nuts Additional CY#3 as Reference
MTO For Valve Additional CY#3 as Reference
MTO For Special Item Additional CY#3 as Reference
STATUS /
DUE DATE
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/20/2021
9/20/2021
9/20/2021
9/20/2021
9/20/2021
9/20/2021
9/20/2021
9/20/2021
9/20/2021
9/20/2021
9/20/2021
9/20/2021
9/20/2021
9/20/2021
9/8/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/10/2021
9/15/2021
9/10/2021
9/10/2021