SCN 0001

You might also like

Download as pdf
Download as pdf
You are on page 1of 1
Document NO.: FFS001 FIRE FIGHTING SYSTEM WEEKLY INSPECTION REPORT [REHABILITATION OF MARINE O11. Project Title: TERMINAL JETTY #2 SEC-RPP Contract No. 100012601 RABIGH om /Area/Location: Panel No. aS Inspector nam 'SHAFAQ ALT KHAN Date: 17-08-2021 inside the box] OK Not NA ok FIRE ALARM SYSTEM 1 [Check all components / devices are free from physical damage. 12 [Check all components / devices are protected from dust & water. 13 \Check FACPs, Auxiliary Power Supply etc. cabinet doors are operable with locks properly working, 14 [Check all the detection device are working satisfactory in Order. FOAM WATER DELUGE SYSTEM 24 Verify that the isolation valve on downstream side of deluge valve is lopen. 22 Verity the inlet and outlet pressure gauges in deluge valve is reading the line pressure. 23 Verify that there is no water passing through deluge valve. 24 Verity the level of foam solution in foam bladder tanks. 25 Verify the foam FCV is working freely. 26 [Check Manual Pull Station near the exit / entrance door are easily accessible, 27 Verify the level of foam in foam bladder tank. 28 Verify the inlet and outlet valves of foam bladder tank ie open.

You might also like