Main Contractor: Owner: Consultant: Project Name:

Toshka 3 (220/66/22 KV) GIS S/S


Date: Page:
SEP, 2021 1 of 4
Vendor: Document Number:
Sieyuan

Title.

CT TESTS

Test Report

for

220 KV GIS CT Tests

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 2 of 4
Vendor: Document Number:
Sieyuan

Title.

CT TESTS

 CT Data
Bay No.: D07 No. of cores: 4 Manufacturer: Sieyuan

Core 1 Ratio: 1250-2500/1 Class: 0.5M5


Core 2 Ratio: 1250-2500/1 Class: 5P30
Core 3 Ratio: 1250-2500/1 Class: 5P30
Core 4 Ratio: 1250-2500/1 Class: 5P30

Insulation Test:
- Test Procedure
* APPLIED VOLTAGE 5 KV (PRIM – E).
* APPLIED VOLTAGE 2.5 KV (PRIM – SEC).
* APPLIED VOLTAGE 1 KV (SEC – E) and (SEC TO SEC).
 The test done according to the FAT procedure and results referred to the
FAT criteria.

A) CORE IT SELF:

R S T
CORES
Pri -Sec Sec - E Pri -Sec Sec - E Pri -Sec Sec - E
CORE 1
CORE 2
CORE 3

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 3 of 4
Vendor: Document Number:
Sieyuan

Title.

CT TESTS

B) SEC TO SEC:

Phase
R S T
Core
CORE 1 -CORE 2
CORE 2 - CORE 3
CORE 3 - CORE 1

C) PRIM TO EARTH:

R -E S-E T-E

CT Test
Procedure:
 The CT will be completely tested by CT analyzer.
Company MADKOUR WITNESSED BY (EETC)
Name
Signature
Date
Main Contractor: Owner: Consultant: Project Name:
Toshka 3 (220/66/22 KV) GIS S/S
Date: Page:
SEP, 2021 4 of 4
Vendor: Document Number:
Sieyuan

Title.

CT TESTS

 Connect the CT to the testing kit (primary and secondary)


 Choose the below mentioned tests.
 Winding resistance
 Turns ratio
 Excitation curve
 Polarity
 Burden
 Run the test and print the test report from the testing kit.
CT circuit tests

1. SINGLE POINT EARTH TEST:


 Check the continuity of the CT circuit with the earthing link closed.
 Check the absence of continuity with earthing link open.

Core no Function T.b.no Single point earthing check

S1 – s2

2. CHECK SHORT & ISOLATED LINK FOR PROPER FUNCTION:


 Use the short and isolation facility according to the approved schematics.
 Check that the secondary current is available before the shorting point and absence
after the isolation point.

Core no Function Confirm test for short and isolated check


S1 – s2

Company MADKOUR WITNESSED BY (EETC)


Name
Signature
Date