CMT Calculations.
CMT Calculations.
45.8 bbl
Annulas Volume
Pump displacement 16.67 lt/str 4.41 gal/str
Hole depth 30 m
Annulas between 9 5/8" and 12¼" open hole 28.94 lt/m 1170 meter 33.860 m³
Annulas between 4¾ DC" and 8½" open hole 25.2 lt/m 465 meter 11.718 m³
Annulas between 3½ DP" and 8½" open hole 30.1 lt/m 465 meter 13.997 m³
Annulas between 3½ DP" and 7" casing 11.7 lt/m 465 meter 5.441 m³
Total = 65.305 m³
Annulas Volume
Pump displacement 16.67 lt/str 4.41 gal/str
540.3 bbl
Annulas Volume
Pump displacement 16.67 lt/str 4.41 gal/str
Dicplacement
Capacity of 13 3/8" N-80, 61 lb/ft = 79.37 lt/m 1109.59 meters = 88.068 m³
78.08 lt/m 220.95 meters = 17.252 m³
105.320
Annulas Volume
Pump displacement 16.67 lt/str 4.41 gal/str
Balanced plug w/ 20 bbl water ahead and 7.75 bbl water behind cement.
Displacement
102.4 bbl
95% Strokes = 1036.84
97% Strokes = 1005.297
Differential pressure /w 11.1 lbs/gal ann TVD 1330 kg/m³ 3190 meters
Displacement
9 bbl = 1.431 m³ = 1431 lt = #REF! m annulas
CEMENT CALCULATIONS
Date 8-Aug-05 Location Neem South West 1 Csg Job 7" Production
Displacement
265.3 bbl
95% Strokes = 2684.977
97% Strokes = 2603.295
Differential pressure /w 11.1 lbs/gal ann TVD 1330 kg/m³ 3190 meters
Displacement
9 bbl = 1.431 m³ = 1431 lt = #REF! m annulas
CEMENT CALCULATIONS
Date 6-May-04 Location Balome 2 Csg Job 7" Production
391.1 bbl
95% Strokes = 3958.381
75% Strokes = 3837.959
Differential pressure /w 11.1 lbs/gal ann TVD 1330 kg/m³ 3190 meters
Displacement
9 bbl = 1.431 m³ = 1431 lt = 122.0 m annulas
Pill spoting
DP cap 9.27 lt/m length 2388 m = 22136.76 lt 22.137 m³ = 139.2 bbl
HWDP cap 4.61 lt/m length 445 m = 2051.45 lt 2.051 m³ = 12.9 bbl
Total string 24.188 1451 str
0.1019 bbl/str
Pill Hight
Total pill volume 100 bbl
7" csg - 3½" DP annulas = 3.87 lt/m + 13.5 lt/m = 17.37 lt/m
0.1095 bbl/m
HWDP cap 4.61 lt/m length 254 m = 1170.94 lt 1.171 m³ = 7.4 bbl
Total string 11.275 676 str
0.1019 bbl/str