CEMENT CALCULATIONS 26" CONDUCTOR

Date 30-Aug-04 Location Diffra C-1 Csg Job 26" Conductor

Volumes as per CNLC caliper log.+ 15%

Lead from 10 30 20 meters


Volume open hole 20 meters 113.5 lt/m + 50% = 3.41 m³
Voume inside 13 3/8" cs 5 meters 316.8 lt/m = 1.6 m³
Total lead slurry m³ = 4.99 m³
Total lead slurry bbl = 31.38 bbl

Lead slurry yield 1.2 m³/ton cmt 4.16 Tons cmt

Tail slurry 0 meters 28.94 lt/m + 50% = 0.00 m³


Shoe track 5 meters 316.8 lt/m = 1.58 m³
Total tail slurry m³ = 1.58 m³
Total tail slurry bbl = 10.0 bbl

Capacity of 26" conductor = 316.8 lt/m 23 meters = 7.286 m³

45.8 bbl

Displacement = 18 m 5.70 m³ 35.9 bbl

Annulas Volume
Pump displacement 16.67 lt/str 4.41 gal/str

26" csg shoe 30 m

Hole depth 30 m

Annular Vol 30" H - 26" csg 28.94 lt/m

Between csg. 0 m Ann/Vol m³


Open Hole= 20 m Ann/Vol 0.00 m³
Total 0.00 m³ = 0 str
Annulus and Displacement calculations 9 5/8" csg
Length Volume m³
Annulas between 9 5/8" and 13 3/8" csg 30.98 lt/m 1015 meter 31.445 m³

Annulas between 9 5/8" and 12¼" open hole 28.94 lt/m 1170 meter 33.860 m³

Annulas between 4¾ DC" and 8½" open hole 25.2 lt/m 465 meter 11.718 m³

Annulas between 3½ DP" and 8½" open hole 30.1 lt/m 465 meter 13.997 m³

Annulas between 3½ DP" and 7" casing 11.7 lt/m 465 meter 5.441 m³

Total = 65.305 m³

Casing Volume, 9 5/8" 40 lb/ft 39.55 lt/m 2185 meter 86.417 m³

Number of Pump strokes 16.67 lt/str 2185 meter 36424 strokes

Open Hole Volume 76.04 lt/str 1170 meter 88.967

4¾" DC and 8½" open hole


9 5/8" csg
CEMENT CALCULATIONS
Date 27-Jul-03 Location Heglig 28 Csg Job

Volumes as per CNLC caliper log.+ 15%

Lead from 1279 to 402 meters 42.9 m³

Inside 10¾" casing, 100 meters 0.026 m³/m = 2.627 m³

Total lead = 49.335 m³ + c/a = 51.962

Lead slurry yield 1.55 m³/ton cmt 33.524 Tons cmt

Shoe track 177.8 mm 0.01996 lt/m

Length 11.6 m Volume = 0.232 m³


7" Production
CEMENT CALCULATIONS
Date 23-Oct-04 Location Diffra C-1 Csg Job 9 5/8" Production

Volumes as per CNLC caliper log.

Lead from 1200 1950 750 meters


Volume open hole 650 meters 33.84 lt/m+15% = 25.30 m³
Voume inside 13 3/8" cs 100 meters 30.98 lt/m = 3.1 m³
Total lead slurry m³ = 28.39 m³
Total lead slurry bbl = 178.59 bbl

Lead slurry yield 1.2 m³/ton cmt 23.66 Tons cmt

Tail slurry 1350 meters 35.48 lt/m + 15% = 55.08 m³


Shoe track 24 m.P110 47 38.19 lt/m = 0.92 m³
Total tail slurry m³ = 56.00 m³
Total tail slurry bbl = 352.2 bbl

Capacity of 9 5/8" P110, 47 lb/ft = 38.19 lt/m 2740 meters = 104.641 m³


Capacity of 9 5/8" N80, 47 lb/ft = 38.19 lt/m 536 meters = 20.470 m³
125.110
786.9 bbl

Annulas Volume
Pump displacement 16.67 lt/str 4.41 gal/str

13 3/8" csg shoe 1506 m

Hole depth 3220 m

Annular Vol 13 3/8" - 9 5/8" csg 30.98 lt/m

Annular Vol 12¼" H - 9 5/8" csg 28.94 lt/m

Between csg. 1506 m Ann/Vol 46.66 m³


Open Hole= 1714 m Ann/Vol 65.00 m³
Total 111.66 m³ = 6698 str
CEMENT CALCULATIONS
Date 6-Jun-05 Location Hilba East 2 Csg Job 10¾" surface

Volumes , gauge hole + 30%

Lead from 31 838 807 meters


Volume open hole 807 meters 51.5 lt/m + 30% = 54.03 m³
Voume inside 16" cond 31 meters 55.45 lt/m = 1.7 m³
Total lead slurry m³ = 55.75 m³
Total lead slurry bbl = 350.65 bbl

Lead slurry yield 1.2 m³/ton cmt 46.46 Tons cmt

Tail slurry 50 meters 51.5 lt/m + 30% = 3.35 m³


Shoe track 12 meters 39.55 lt/m = 0.47 m³
Total tail slurry m³ = 3.82 m³
Total tail slurry bbl = 24.0 bbl

Capacity of 9 5/8" K55, 40 lb/ft = 39.55 lt/m 2172.09 meters = 85.906 m³

540.3 bbl

Annulas Volume
Pump displacement 16.67 lt/str 4.41 gal/str

13 3/8" csg shoe 1506 m

Hole depth 3220 m

Annular Vol 13 3/8" - 9 5/8" csg 30.98 lt/m

Annular Vol 12¼" H - 9 5/8" csg 28.94 lt/m

Between csg. 1506 m Ann/Vol 46.66 m³


Open Hole= 1714 m Ann/Vol 65.00 m³
Total 111.66 m³ = 6698 str
CEMENT CALCULATIONS 13 3/8" CSG
Date 12-Sep-04 Location Diffra C-1 Csg Job 13 3/8" Surface casing
Hole size 17.5 "
Volumes hole size plus 125%%

Lead from 10 1244 1234 meters


Volume open hole 1224 meters 64.4 lt/m + % 120 173.42 m³
Voume inside 20" cond 20 meters 94.48 lt/m = 1.9 m³
Total lead slurry m³ = 175.31 m³
Total lead slurry bbl = 1102.67 bbl

Lead slurry yield 1.61 m³/ton cmt 108.89 Tons cmt

Tail slurry 100 meters 64.4 lt/m + % 120 14.17 m³


Shoe track 12 meters 78.08 lt/m = 0.94 m³
Total tail slurry m³ = 15.10 m³
Total tail slurry bbl = 95.0 bbl

Tail slurry yield 0.77 m³/ton cmt 19.62 Tons cmt


Total cement slurry 1197.68 bbl

Dicplacement
Capacity of 13 3/8" N-80, 61 lb/ft = 79.37 lt/m 1109.59 meters = 88.068 m³
78.08 lt/m 220.95 meters = 17.252 m³
105.320

Total displacement. 662.5 bbl


Displace 10 bbl w/ Dowell 15.0 bbl

Displace with Rig pumps 647.5 bbl

Pump out put 0.1019 bbl/str Total str 6354 Stokes

Annulas Volume
Pump displacement 16.67 lt/str 4.41 gal/str

20" csg shoe 30 m

Hole depth 1344 m

Annular Vol 13 3/8" - 26" csg 94.48 lt/m

Annular Vol 17½" H - 13 3/8" csg 64.4 lt/m

Between csg. 31 m Ann/Vol 2.93 m³


Open Hole= 1314 m Ann/Vol 84.62 m³
Total 87.55 m³ = 5252 str

Strokes X 2 = 10504 Stokes


CEMENT PLUG CALCULATION
Hole size 8½ capacity 36.61 lt/m
Annulas capacity 8½" x 5" = 23.94 lt/m
Drill pipe capacity 9.27 lt/m
Plug depth 100 meter volume = 3.66 m³ 23.0 bbl

Plus 50 % 5.49 m³ 34.5 bbl

Hole volume w/ DP I hole = 33.21 lt/m

Hole depth 3600 m

Plug hieght from 3600 to 3500 = 100 meter + 50% = 150 m

Plug hieght with DP in hole = 165.4 m

Top of plug w/ DP in hole = 3434.6 m

Pump 20 bbl water ahead 3.179 m³ 19.9959 bbl


Annulas hieght water = 132.7903 m
Total annulas height 298.1 m
Water behind 1.231 m³ 7.74278 bbl
Top of cmt & water 3302 m

Cement displace ment in DP = 3301.9 m X 9.27 lt/m = 30.61 m³


192.5 bbl
Under displace 5 bbl 187.5 bbl

Balanced plug w/ 20 bbl water ahead and 7.75 bbl water behind cement.

Hole depth 3480 m

Surface to bit Volume and pump strokes

Pump bbl/stk 0.0998 bbl


8" DC cap 4.188 lt/m
5" HWDP cap 4.61 lt/m

5" DP 3100 Meters = 28737 lt 28.74 m³ 180.76 bbl

5" HWDP 200 Meters = 922 lt 0.92 m³ 5.7994 bbl

7" DC 180 Meters = 753.84 lt 0.75 m³ 4.7417 bbl


191.3 bbl
Strokes required = 1917
CEMENT CALCULATIONS
Date 14-May-04 Location Balome 2 Csg Job 7" Production

Volumes as per CNLC caliper log.+ 25%

Cmt from 3085 3649 564 meters


Vol O/H an 8½" - 5" 244 meters 23.3 lt/m + 35% = 7.68 m³
Voume inside 7" + 5" csg 329 meters 7.26 lt/m = 2.4 m³
Voume inside 7" + 3½" DP 60 meters 13.5 lt/m = 0.8 m³
Total lead slurry m³ = 10.06 m³
Total lead slurry bbl = 63.30 bbl

Lead slurry yield 0.9 m³/ton cmt 11.18 Tons cmt

Displacement

Capacity of 3½" DP = 3.87 lt/m 2856.39 meters = 11.054 m³


Capacity of 5" liner = 9.26 lt/m 565 meters = 5.232 m³
Total = 16.286 m³

102.4 bbl
95% Strokes = 1036.84
97% Strokes = 1005.297

Differential pressure /w 11.1 lbs/gal ann TVD 1330 kg/m³ 3190 meters

8.3 lbs/gal csg 995 3190 meters

Displacement
9 bbl = 1.431 m³ = 1431 lt = #REF! m annulas
CEMENT CALCULATIONS
Date 8-Aug-05 Location Neem South West 1 Csg Job 7" Production

Volumes as per Schlumberger caliper log.+ 30%

Cmt from 3400 2100 1300 meters


Vol O/H an 8½" - 7" 961 meters 16.6 m³ + 20% 19.92 m³
Vol O/H an 8½" - 7" 60 11.73 lt/m + 20% = 0.84
Vol inside 9 5/8" + 7" csg 78 meters 13.51 lt/m = 1.1 m³
Vol inside 9 5/8" + 5" DP 100 meters 25.5 lt/m = 2.6 m³
Total lead slurry m³ = 20.97 m³
Total lead slurry bbl = 131.93 bbl

Lead slurry yield 0.9 m³/ton cmt 23.30 Tons cmt

Displacement

Capacity of 5" DP = 9.27 lt/m 2266 meters = 21.006 m³


Capacity of 7" liner = 19.38 lt/m 1092.28 meters = 21.168 m³
Total = 42.174 m³

265.3 bbl
95% Strokes = 2684.977
97% Strokes = 2603.295

Differential pressure /w 11.1 lbs/gal ann TVD 1330 kg/m³ 3190 meters

8.3 lbs/gal csg 995 3190 meters

Displacement
9 bbl = 1.431 m³ = 1431 lt = #REF! m annulas
CEMENT CALCULATIONS
Date 6-May-04 Location Balome 2 Csg Job 7" Production

Volumes as per CNLC caliper log.+ 25%

Lead from 2085 3185 1100 meters


Volume open hole 1000 meters 11.73 lt/m + 35% = 15.84 m³
Voume inside 9 5/8" csg 100 meters 14.67 lt/m = 1.5 m³
Total lead slurry m³ = 17.30 m³
Total lead slurry bbl = 108.83 bbl

Lead slurry yield 0.9 m³/ton cmt 19.23 Tons cmt

Tail slurry 400 meters 11.73 lt/m + 25% = 7.04 m³


Shoe track 24 meters 19.96 lt/m = 0.48 m³
Total tail slurry m³ = 7.52 m³
Total tail slurry bbl = 47.3 bbl

Capacity of 7" K55, 26 lb/ft = 19.96 lt/m 2600 meters = 51.896 m³


Capacity of 7" K55, 29 lb/ft = 19.36 lt/m 531 meters = 10.280 m³
Total = 62.176 m³

391.1 bbl
95% Strokes = 3958.381
75% Strokes = 3837.959

Differential pressure /w 11.1 lbs/gal ann TVD 1330 kg/m³ 3190 meters

8.3 lbs/gal csg 995 3190 meters

Displacement
9 bbl = 1.431 m³ = 1431 lt = 122.0 m annulas
Pill spoting
DP cap 9.27 lt/m length 2388 m = 22136.76 lt 22.137 m³ = 139.2 bbl

HWDP cap 4.61 lt/m length 445 m = 2051.45 lt 2.051 m³ = 12.9 bbl
Total string 24.188 1451 str
0.1019 bbl/str

27.00 bbl in pipe 112.2 bbl to pump 1101 str

10 bbl in annulus = 98 str

40 bbl = 393 str

30 bbl = 294 str 12 hrs 25 str/hr 6 str every 15 minutes

1451 str - 393 str 1058 str + 98 str = 1157

Pill Hight
Total pill volume 100 bbl

Hole depth 3650 m csg shoe 3185 m Open hole .= 465 m


Hole size 8.5 in
Hole cap 36.31 lt/m Total cap 16.88 m³ 106.2013 bbl

4¾" DC dis 9.4 lt/m Mud vol 26.91 lt/m

DC length 129 m Mud colum DC .= 1.2126 m³ 7.63 bbl

3½" HW dis 0.44670 lt/m Mud vol 35.86 lt/m

HWDP len 175 m Mud colum HWDP .= 6.27608 m³ 39.48 bbl

3½" DP dis 6.21 lt/m Mud vol 30.10 lt/m

3½" DP len 161 m Mud colum 3½"DP .= 4.8461 m³ 30.48 bbl

Total 77.59 bbl

Remaining pill in 7" csg - 3½" DP annulas = 22.41 bbl

7" csg - 3½" DP annulas = 3.87 lt/m + 13.5 lt/m = 17.37 lt/m

0.1095 bbl/m

Height in casing = 204.7 m


Remaining 3½ DP in string = 11.5338 m³ 691.9 strokes
Pill spoting
DP cap 9.27 lt/m length 1090 m = 10104.3 lt 10.104 m³ = 63.6 bbl

HWDP cap 4.61 lt/m length 254 m = 1170.94 lt 1.171 m³ = 7.4 bbl
Total string 11.275 676 str
0.1019 bbl/str

27.00 bbl in pipe 176 bbl to pump 1727 str

10 bbl in annulus = 98 str

40 bbl = 393 str

30 bbl = 294 str 12 hrs 25 str/hr 6 str every 15 minutes

676 str - 393 str 284 str + 98 str = 382

Hole depth 3220 m


100 bbl 15.90 m³

12¼" hole cap = 76.04 lt/m 30 bbl = 237.14575 m open hole

Hole V w/ P lt/m Hole V


9" DC displacement = 36.48 lt/m 39.56 lt/m 0 m 0.00 m³
8" DC displacement = 28.24 lt/m 47.8 lt/m 100 m 4.78 m³
6½" DC displac. = 18.22 lt/m 57.82 lt/m 35 m 2.02 m³
5" HWDP displac. = 9.36 lt/m 66.68 lt/m 25 m 1.67 m³
5" DP displac. = 3.4 lt/m 72.64 lt/m 160 m 8.47
Hole volume 8" DC = 47.8 lt/m 100 m = 2.824 m³

Hole volume 6½" DC = 57.82 lt/m 62 m = 3.585 m³

Hole volume 5" HW = 66.68 lt/m 137 m = 9.135 m³


299 m = 15.544 m³
Hole volume 5" DP = 72.64 lt/m
Remaining = 0.354 m³ 4.88 m
304 m = 11 std

Drill pipe displacement 1200 m 9.27 lt/str 11124 lt = 667 strokes