STANDARDS ACTIONS
INTERIM MEETINGS INTERPRETATIONS
A complete listing of project committee interim meetings is New official interpretations to the following standards are
provided on ASHRAE’s website at: https:// now available on the ASHRAE website at:
www.ashrae.org/technical-resources/standards-and- http://www.ashrae.org/standards-interpretations
guidelines/project-committee-interim-meetings ttps://
www.ashrae.org/technical-resources/standards-and- ANSI/ASHRAE/IES Standard 90.1-2019, Energy
guidelines/project-committee-interim-meetings. Standard for Buildings Except Low-Rise Residential
Buildings, dated October 13, 2021.
SSPC 30, Method of Testing Liquid Chillers, will
hold a conference call on November 1, 2021 from 1:00 Interpretation 90.1-2019-7 - October 13, 2021
pm to 2:30 pm (Eastern). For additional information (Refers to the requirements presented in ANSI/
contact Justin Prosser, Chair of SSPC 30 ASHRAE/IES Standard 90.1-2019, Section 5.5.4.1,
(justin.prosser@danfoss.com). regarding the determination of WWR for use with
Tables 5.5-0 to 5.5-8.)
SSPC 170, Ventilation of Health Care Facilities, will
hold a webinar on October 27, 2021 from 3:00 pm to Interpretation 90.1-2019-8 - October 13, 2021
5:00 pm (Eastern). For additional information contact (Refers to the requirements presented in ANSI/
Michael Sheerin, Chair of SSPC 170 ASHRAE/IES Standard 90.1-2019, Table G3.1 #5,
(michael.sheerin@tlc-eng.com). Baseline Building Performance column, item (c),
regarding Appendix G baseline fenestration model-
SSPC 185, Methods of Test to Inactivate Microorgan- ing requirements.)
isms in HVAC Systems with UV-C lights, Standard
185.3 (Subcommittee), Method of Testing In-Room
Devices and Systems for Microorganism Removal or
Inactivation in a Chamber will hold conference calls
CALL FOR PARTICIPATION IN AHRI STANDARDS
from 10:30 am to 12:30 pm (Eastern) on the following ACTIVITIES
dates:
October 27, 2021 AHRI’s Standards team is seeking volunteers to participate
November 17, 2021 in the review and final approval of AHRI standards to be
December 15, 2021 published as an American National Standard (ANS) or Na-
January 5, 2022 tional Standard of Canada (NSC). This final approval is the
January 26, 2022 responsibility of a group called a Consensus Body. AHRI
February 16, 2022 needs experts in the field of HVACR to serve as members
March 9, 2022 of the Consensus Body.
March 30, 2022
April 20, 2022 As required by the American National Standards Institute
May 11, 2022 (ANSI), membership in a Consensus Body must represent a
June 1, 2022 balance of interests, so AHRI is going outside of its manu-
June 22, 2022 facturer-centered membership to include persons represent-
For additional information contact Stephen Martin, ing other interests. AHRI membership is not required for
Chair of SSPC 185 (smartin1@cdc.gov). participation.
1
Volume XI, Issue 39
STANDARDS ACTIONS
JOIN A LISTSERVE
Click on the following link to learn more about ASHRAE Standards Activities https://www.ashrae.org/listserves.
SSPC 41 — Standard Methods for Measurement
SSPC 62.2 — Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings
SSPC 90.1 — Energy Standard for Buildings Except Low-Rise Residential Buildings
SPC 90.4 — Energy Standard for Data Centers and Telecommunications Buildings