Removal and Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Cab Mounts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Cab . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36

90-1
SECTION 90 – CAB – CHAPTER 2

CHAPTER 2 – CAB REMOVAL AND INSTALLATION

LIFTING THE CAB


4 2 3
CAB PREPARATION
5
1. If equipped, remove the loader assembly from
the cab end tractor frame.
2. Park the tractor on a level surface, set the parking
brake, lower the cab end three-point-hitch arms,
and remove the keys from the ignition.
3. Install the articulation lock pin.
1
4. Disconnect the batteries negative terminal.
10005284
5. Remove the bolts (1) and plate (2) from the
rubber hose mounting clamp (3). 1
NOTE: Due to the location of the articulating joint,
one of the bolts (1) may not be removed from the
rubber hose mounting clamp (3) If this is the case
make sure the bolt (1) is totally removed from the
rubber hose mounting clamp (3) and the plate does
not interfere with the lifting of the cab.

6. Remove the nuts (4) from the clamps (5) on both


sides of the tractor. Remove the clamps from the
tractor cab.

7. Remove the nut (1) from the ground strap (2)


Remove the ground strap from the tractor cab.

10005286

90-2
SECTION 90 – CAB – CHAPTER 2
8. Remove the fuel tank breather hose clamp (1)
from outside the LH side of the cab.

MA03F015

3
9. Remove the access hole cover plates (1) from
the engine end of the cab floor on both sides of
the cab. Clean the silicon selant from the cover
plate (1) and the cab floor (2).

10005291 2
4
10. Remove the nuts (1) from the engine end cab
mounting bolts (2).
2

90-3
SECTION 90 – CAB – CHAPTER 2
11. Remove the bolts (1) and rubber washers (2)
through the access holes in the cab floor. 1 2

10005292

6
12. Remove the nuts (1) from the cab end cab
mounting bolts (2) on both sides of the cab.
NOTE: The bolts (2) cannot be removed from the cab 2
mounting bracket.

1
10005293

7
13. Lift the cab mounting bolts (1) on an angle so the
bolt threads do not interfere with the cab
mounting bracket (2) during the cab removal. 1

10005294

90-4
SECTION 90 – CAB – CHAPTER 2
14. Loosen the set screws (1) on all three of the flow
control cable ends (2) Remove the flow control 2
cable ends from the implement valve (3).

50005289 3
9
15. Place the flow control cable ends (1) over the
implement valve (2) to avoid damage to the flow
1 2
control cable ends during cab removal.

1 1

10005290

10
16. If installed, remove the lock nut (1) from the 3rd
foot pedal option cable end (2). Remove the 4 1
cable and bolt (3) from the bell crank (4) coming
3
through the cab floor.
5
17. Loosen the cable nut (5) from the cab bracket (6)
Remove the cable from the groove in the cab
bracket and place it under the cab bracket.

WARNING 2
Cut tie wraps, adjust brake lines, relocate hoses,
relocate electrical lines as necessary before cab
removal is started to eliminate the chance of
10005288 6
tractor damage or personal injury.
11

90-5
SECTION 90 – CAB – CHAPTER 2

LIFTING THE CAB USING THE


THREE-POINT-HITCH LIFTING TOOL

LIFTING THE CAB


1. Prepare the tractor cab for lifting, refer to the Cab
Preparation Section in this chapter.
2. Remove the stabilizer assembly lynch pins (1)
3. Adjust the stabilizer assembly tube (2) all the way
counter clockwise so the threads are not showing
(3).
1

10005295 3
12
4. Remove the hydraulic overflow container (1)
from the bracket (2).
1

40005251

13
5. Remove the pin and ring assembly (1) from the
upper link mounting pin.

40005252

14

90-6
SECTION 90 – CAB – CHAPTER 2
6. Remove the pin (1) from the bracket (2).

2
MA03F016

15
7. Remove the upper link (1) from the tractor.

40005254

16
8. Release the quick attach assembly (1) on each
of the lower lift links (2).

1
10005296

17

90-7
SECTION 90 – CAB – CHAPTER 2
9. Align the NH01362 Cab Lifting Tool (1) in front of
the cab end three-point-hitch.

10005297

18
10. Install the tool frame ends (1) into the quick
attach assembly ends (2). 2

10005298

19
11. Install the latch pins (1) from the tool kit in the tool
frame ends (2)

2
1

10005299

20

90-8
SECTION 90 – CAB – CHAPTER 2
12. Lift the tool frame (1) up to contact the tractor. Lift
the bottom of the tool frame so the quick attach
assemblies (2) on each of the lower lift links (3)
reattach to the lower lift links. Make sure the
quick attach assemblies are latched completely.
13. Lower the tool frame (1) to the ground.

1 2

21
14. Unscrew both ends of the ratchet jack to make
the ends an equal distance apart from each
other.

10005300

22
15. Install the ratchet jack (1) into the upper link
mounting bracket (2).
16. Install the upper link mounting pin (3) into the
bottom hole of the bracket (2).
17. Install the latch pin (4) into the pin (3). 3 4

10005301

23

90-9
SECTION 90 – CAB – CHAPTER 2
18. Remove the remaining pin (1) and latch pin (2)
from the top link.

40005254

24
19. Lift the tool frame up to contact the tractor. Raise
the ratchet jack (1) into the tool frame (2).
20. Install the pin (3) and latch pin (4) into the tool
frame and ratchet jack.
NOTE: The three-point-hitch may need adjusted up
or down to allow for the ratchet jack to be installed.

10005302 1 4 2 3
25
21. Remove the shipping caps (1) from the tractor
frame (2). Do not discard the shipping caps. 2

10005303

26

90-10
SECTION 90 – CAB – CHAPTER 2
22. Start the engine and raise the three-point-hitch
using the raise/lower switch (1) on the rear of the
tractor cab.

27
23. Raise the three-point-hitch enough to align the
special tool tubes (1) with the tractor frame (2). 1
Adjust the ratchet jack, and three-point-hitch 2
lower links to make the tool frame level and snug
with the tractor frame.

10005304

28
24. Install the bull horns (1) into the tool frame (2)
until the flange (3) contacts the tool frame. 3 1 2

10005305

29

90-11
SECTION 90 – CAB – CHAPTER 2
25. Install the stabilizer assembly lynch pins (1) into
the stabilizer assemblies (2).

10005295

30
26. Position the bolts (1) on an angle to avoid binding
on the bolt threads during cab lifting.
1

10005306

31
NOTE: If the hydraulic system is inoperative, the cab
may be lifted with floor jacks under the legs of the
special tool frame or by using a hydraulic hand pump
(such as OTC Model 4002) to drive one of the
three-point-hitch lift assist cylinders.

32

90-12
SECTION 90 – CAB – CHAPTER 2
27. Raise the three-point-hitch approximately 76 mm
(3 inches). Adjust the ratchet jack to maintain a
level cab position.
28. Inspect the tie wraps, brake lines, hoses,
electrical lines as necessary to avoid damage to
these components.
76 mm
(3 Inch)
WARNING
Cut tie wraps, adjust brake lines, relocate hoses,
relocate electrical lines as necessary before cab
removal is started, this will eliminate the chance
of tractor damage or personal injury.
10005307

29. Raise the three-point-hitch again approximately 33


76 mm (3 inches). Adjust the ratchet jack to
maintain a level cab position. Raise the cab to a
total height of 280 mm (11 inches).

WARNING
Do not raise the cab higher than 280 mm (11
inches). If the cab is raised higher than 280 mm
(11 inches), tractor damage or personal injury
may occur.

CAUTION
Over adjustment of the cab alignment can cause
the cab end fenders to hit the steps. Once the
lower arms raise above a horizontal plane the cab
moves in the opposite direction.
1

3
10005316 4
34
30. Install the cab stands on the tractor frame on both
sides of the cab, front (1) and rear (2).
31. Install the four 3/4 inch bolts (3) included in the 2
special tool kit through the cab stands (1) and (2)
and cab frame (4) then fasten the cab stands with
the nuts (5) Tighten securely.

5
3

4
10005317

35

90-13
SECTION 90 – CAB – CHAPTER 2
32. Carefully lower the cab on the cab stands (1)
adjust the cab to be centered between the two
rear cab stands. 1 1

10005318

36
NOTE: When lowering the cab, adjust the cab so the
welded cab mounts (1) do not rest on the cab stands
(2).

10005319

37
33. Remove the cab mount bolts and cab mounts
from the cab. To stabilize the tractor, install the
four 10 x 5/8 inch bolts (1) and cab mount large
washers (2). Fasten the bolts with nuts. Tighten
securely. 1
2
34. If necessary, remove the NH01363 Cab Lifting
Tool from the cab end three-point-hitch.

10005320

38

90-14
SECTION 90 – CAB – CHAPTER 2
LOWERING THE CAB
1. If removed, attach the three-point-hitch lifting
device.
2. Remove the four 10 x 5/8 inch bolts (1) and
washers (2) from the cab mounts (3).

2 1

10005320

39
NOTE: Inspect cab mounts for wear or damage.
Replace if necessary.
1
3. Install the cab mount bolts (1) and cab mounts (2)
in the cab mounting brackets (3).

10005294 3
40

90-15
SECTION 90 – CAB – CHAPTER 2
4. Remove the cab stands nuts (5) Remove the four
3/4 inch bolts (3) from the cab stands (1) and (2)
and cab frame (4).
5. Raise the cab enough to remove the cab stands
(1) and (2) from the tractor frame on both sides 1
of the cab.
6. Lower the three-point-hitch approximately 76mm
(3 inches). Adjust the ratchet jack to push the cab
backward to maintain a level cab position.
Repeat until cab sets on mounts. 3
7. Install the tie wraps that were removed during the
10005316 4
lifting of the cab. Inspect the brake lines, hoses,
electrical lines as necessary to avoid damage to 41
these components when lowering the cab.

5
3

4
10005317

42
8. Position the bolts (1) on an angle to avoid binding
on the bolt threads during cab lowering.
9. Lower the three-point-hitch until the cab mounts 1
set squarely between the cab and frame
mounting brackets. Adjust the ratchet jack to shift
the cab and align the cab mounting brackets until
the cab mounting bolts drop through the frame
mount.
NOTE: The three-point-hitch and ratchet jack may
need adjustment to allow for the bolts, to be installed.

10. When the bolts are completely through the frame 10005306
cab mounts, lower the cab until the full cab weight
is resting on the mounts. 43

90-16
SECTION 90 – CAB – CHAPTER 2
11. Remove the stabilizer assembly lynch pins (1)
from the stabilizer assemblies (2).

10005295

44
12. Remove the bull horns (1) from the lifting tool
frame (2). 1 2
NOTE: The three-point-hitch and ratchet jack may
need adjustment to allow for the bull horns to be
removed.

10005305

45
13. Remove the pin (3) and latch pin (4) from the tool
frame (2) and ratchet jack (1).
NOTE: The three-point-hitch may need adjustment
up or down to allow for the pin to be removed.

10005302 1 4 2 3
46

90-17
SECTION 90 – CAB – CHAPTER 2
14. Lower the tool frame (1) to the ground.

1
47
15. Release the quick attach assembly (1) on each
of the lower lift links (2).

1
10005296

48
16. Install the shipping caps (1) in the tractor frame
(2). 2

10005303

49

90-18
SECTION 90 – CAB – CHAPTER 2
17. Remove the latch pins (1) from the special tool
frame ends (2).

2
1

10005299

50
18. Remove the special tool frame ends (1) from the
quick attach assembly ends (2). 2

10005298

51
19. Reattach the quick attach assembly (1) on each
of the lower lift links (2).

1
10005296

52

90-19
SECTION 90 – CAB – CHAPTER 2
20. Adjust the stabilizer assembly (2) then install the
lynch pins (1).

10005295

53
21. Remove the latch pin (4) from the pin (3).
22. Remove the upper link mounting pin (3) from the
bottom hole of the bracket (2).
23. Remove the ratchet jack (1) from the bracket (2).
3 4

10005301

54
24. Install the upper link (1) on the tractor.

40005254

55

90-20
SECTION 90 – CAB – CHAPTER 2
25. Install the mounting pin (1) into the bracket (2).

2
MA03F016

56
26. Install the pin and ring assembly (1) into the
mounting pin.

40005252

57
27. Install the hydraulic overflow container (1) in the
bracket (2).
1

40005251

58

90-21
SECTION 90 – CAB – CHAPTER 2
28. Install the flow control cable ends on the
implement valve (3). Tighten the set screws (1) 2
on all three of the flow control cable ends (2).
NOTE: The flow control cables are color coded to
match the implement valve. Adjust the flow control as
needed per valve.

50005289 3
59
29. If applicable, install the 3rd foot pedal option
cable in the groove in the cab bracket (6) and 4 1
tighten the cable nut (5) to the cab bracket.
3
30. Install the bolt (3) in the cable end (2). Install the 5
cable end on the bell crank (4) coming through
the cab floor. Install the lock nut (1) and tighten.
Adjust as needed.
2

10005288 6
60
31. Install the nuts (1) on the LH and RH cab end cab
mounting bolts (2). Torque the nuts to 560 N⋅m
(414 ft. lbs.). 2

1
10005293

61

90-22
SECTION 90 – CAB – CHAPTER 2
32. Install the bolts (1) and rubber washers (2)
through the access holes in the cab floor. 1 2

10005292

62
33. Install the nuts (1) on the engine end and cab end
mounting bolts (2). Torque the mounting
hardware to 560 N⋅m (414 ft. lbs.).
2

63
34. Apply silicone sealer around the access hole (1).
Install the access hole cover plates (2) over the
RH and LH access holes (1).

2
1
10005291

64

90-23
SECTION 90 – CAB – CHAPTER 2
35. Install the fuel tank breather hose and clamp (1)
to the LH side of the cab.

MA03F015

65
36. Install the ground strap from the tractor cab.
Install the nut (1) to the ground strap (2).

10005286

66

37. Install the clamps (5) to the tractor cab. Install the
nuts (4) to the clamps on both sides of the tractor.
4 2 3
38. Install the bolts (1) and plate (2) to the rubber
hose mounting clamp (3). Tighten the bolts. 5
39. Remove the articulation lock pin.
40. Connect the batteries negative terminal.
41. Inspect the hydraulic oil level and top off the fluid
level.
42. Start the tractor and inspect the hydraulic lines 1
for any leakage. Repair leakage if found.
10005284
43. Articulate the tractor and verify that the hydraulic
lines are not binding. 67
44. The tractor is ready to return to service.

90-24
SECTION 90 – CAB – CHAPTER 2

LIFTING THE CAB USING THE HOIST


LIFTING TOOL

LIFTING THE CAB


1. Prepare the tractor cab for lifting, refer to the Cab
Preparation Section in this chapter.

2. Remove the four bolts (1) and washers (2) from


the cab roof bolt locations.

68

10005308

69
3. Install the four NH01335 cab lifting fixtures (1)
and washers (2) in the four cab roof bolt
locations.

10005309

70

90-25
SECTION 90 – CAB – CHAPTER 2
4. Install the center cab lifter (1) on the cab lifter end
bar (2). 2
NOTE: The center cab lifter (1) must slide in the
groove of the end piece (2).
1

10005310

71
5. Install the bolts (1) and washers (2) in the center
cab lifter (3) and cab lifter end piece (4) from the 3 5
6
bottom. Install the washer (5) and nut (6). Install
the other end piece. Do not tighten the mounting
hardware at this time.

2
1 4
10005311

72
6. Raise the cab lifting tool (1) to the cab roof.
1

10005312

73

90-26
SECTION 90 – CAB – CHAPTER 2
7. Align the four cab lifting fixtures (1) with the cab
lifting special tool (2). 2

10005313
1

74
8. Install the washers (1) and nuts (2) on the cab
lifting fixtures (3). Do not tighten the nuts.
2

10005314

75
9. Tighten the cab lifting center piece nuts (1).
1 1
WARNING
Make sure the cab lifting center piece does not
slip out of the grooves in the cab lifting end
pieces when tightening the cab center piece
nuts. Machine damage or personal injury may
occur.

10005313

76

90-27
SECTION 90 – CAB – CHAPTER 2
10. Tighten the four cab lifting fixtures nuts (1).
11. Raise the cab approximately 76 mm (3 inch).
1
12. Inspect the tie wraps, brake lines, hoses, 1
electrical lines as necessary to avoid damage to
these components.

WARNING
Cut tie wraps, adjust brake lines, relocate hoses,
relocate electrical lines as necessary before cab
removal is started to eliminate the chance of
tractor damage or personal injury.
10005313
13. Raise the cab to a total height of approximately 77
280 mm (11 inch).

WARNING
Do not raise the cab higher than 280 mm (11 inch).
If the cab is raised higher than 280 mm (11 inch),
tractor damage or personal injury may occur.

10005316 4
78
14. Install the cab stands on the tractor frame on both
sides of the cab, front (1) and rear (2).
15. Install the four 3/4 inch bolts (3) included in the 2
special tool kit through the cab stands (1) and (2)
and cab frame (4) then fasten the cab stands with
the nuts (5). Tighten securely.

5
3

4
10005317

79

90-28
SECTION 90 – CAB – CHAPTER 2
16. Carefully lower the cab on the cab stands (1)
adjust the cab to be centered between the two
rear cab stands. 1 1

10005318

80
NOTE: When lowering the cab, adjust the cab so the
welded cab mounts (1) do not rest on the cab stands
(2).

10005319

81
17. Remove the cab mount bolts (1) and mounts (2)
from the mounting brackets (3).
1

10005294 3
82

90-29
SECTION 90 – CAB – CHAPTER 2
18. To stabilize the tractor, install the four 10 x 5/8
inch bolts (1) and cab mount large washers (2).
Fasten the bolts with nuts. Tighten securely.

2 1

10005320

83
LOWERING THE CAB
1. Attach the hoist to the cab.
2. Remove the four 10 x 5/8 inch bolts (1) and
washers (2) from the cab mounts (3).

2 1

10005320

84
3. Install the cab mount bolts (1) and mounts (2) in
the mounting brackets (3).
1

10005294 3
85

90-30
SECTION 90 – CAB – CHAPTER 2

4. Remove the cab stands nuts (5). Remove the


four 3/4 inch bolts (3) from the cab stands (1) and
(2) and cab frame (4).
1
5. Raise the cab enough to remove the cab stands
(1) and (2) from the tractor frame on both sides
of the cab.
6. Lower the hoist approximately 76 mm (3 inch).
3
7. Install the tie wraps that were removed during the
lifting of the cab. Inspect the brake lines, hoses, 4
10005316
electrical lines as necessary to avoid damage to
these components when lowering the cab. 86

5
3

4
10005317

87
8. Position the bolts (1) on an angle to avoid binding
on the bolt threads during cab lowering.
9. Lower the hoist until the top cab mounting 1
brackets touch the cab frame mounting brackets.
10. Install the bolts in the cab mounting brackets.

10005306

88

90-31
SECTION 90 – CAB – CHAPTER 2
11. Install the flow control cable ends on the
implement valve (3). Tighten the set screws (1) 2
on all three of the flow control cable ends (2).
NOTE: The flow control knobs are color coded to
match the implement valve. Adjust the flow control as
needed per valve.

50005289 3
89
12. If applicable, install the 3rd foot pedal option
cable in the groove in the cab bracket (6) and 4 1
tighten the cable nut (5) to the cab bracket.
3
13. Install the bolt (3) in the cable end (2). Install the 5
cable end on the bell crank (4) coming through
the cab floor. Install the lock nut (1) and tighten.
Adjust as needed.
2

10005288 6
90
14. Install the nuts (1) on the LH and RH cab end cab
mounting bolts (2). Torque the nuts to 560 N⋅m
(414 ft. lbs.). 2

1
10005293

91

90-32
SECTION 90 – CAB – CHAPTER 2
15. Install the bolts (1) and rubber washers (2)
through the access holes in the cab floor. 1 2

10005292

92
16. Install the nuts (1) on the LH and RH engine end
and cab end mounting bolts (2). Torque the nuts 2
to 560 N⋅m (414 ft. lbs.).

93
17. Apply silicone sealer around the access hole (1).
Install the RH and LH access hole cover plates
(2) on the engine end of the cab floor.

2
1
10005291

94

90-33
SECTION 90 – CAB – CHAPTER 2
18. Install the fuel tank breather hose and clamp (1)
to the LH side of the cab.

MA03F015

95
19. Install the ground strap from the tractor cab.
Install the nut (1) to the ground strap (2).

10005286

96
20. Install the clamps (5) to the tractor cab. Install the
nuts (4) to the clamps on both sides of the tractor.
21. Install the bolts (1) and plate (2) to the rubber 4 2 3
hose mounting clamp (3). 5
22. Remove the articulation lock pin.
23. Connect the batteries negative terminal.
24. Inspect the hydraulic oil level and top off the fluid
level.
25. Start the tractor and inspect the hydraulic lines
1
for any leakage. Repair leakage if found.
10005284
26. Articulate the tractor and verify that the hydraulic
lines are not binding. 97
27. The tractor is ready to return to service.

90-34
SECTION 90 – CAB – CHAPTER 2

CAB MOUNTS

Removal
NOTE: It is recommended if replacing one cab mount
assembly that all four of the cab mounts be replaced.

1. Park the tractor on a level surface, set the parking


brake, and remove the keys from the ignition.
2. Disconnect the negative battery cables as
detailed in Section 55 - Electrical.
3. Raise the cab as described previously in this
section, but do not install the four 3/4 inch bolts
included in the special tool kit.
4. Remove the mount assembly (1) from the tractor.
1
Installation
1. Install the new mount assemblies (1) on the
tractor cab flanges.
2. Lower the cab as previously described in this 10005293
section.
98
3. Torque the hardware in the kit mount assemblies
to 560 N⋅m (413 ft. lbs.).

90-35
SECTION 90 – CAB – CHAPTER 2

CAB
Removal 12. Disconnect the heater hose at the shut-off valve
The following procedure detail the removal and on the engine as describe in Section 50 - Climate
replacement of the tractor cab as a complete unit. Control System.

Cab removal is only necessary if major damage to 13. Disconnect the heater hose at the left-hand side
the cab . front frame as described in Section 50 - Climate
Control System.
1. Park the tractor on a level surface, set the parking 14. Disconnect the AC suction line at the inlet port of
brake, and remove the keys from the ignition. the compressor as describe in Section 50 -
Climate Control System.
2. Disconnect the negative battery cables as
detailed in Section 55 - Electrical. 15. Disconnect the console main wiring harness
connectors at the left-hand side of the tractor as
3. Raise the cab as described previously in this
described in Section 55 - Electrical.
section using the hoist lifting tool.
16. Disconnect the cab main wiring harness
NOTE: the cab weighs approximately 816 kg (1800
connectors at the right-hand side of the tractor as
lbs).
described in Section 55 - Electrical.
4. Disconnect the throttle cable at the engine as 17. If installed, remove the four 3/4 inch bolts
describe in Section 10 - Engine. included in the special tool kit.
5. Disconnect the FNR cable from under the cab at CAUTION
the bellcrank as described in Section 21 - Splitter
It is unacceptable and dangerous to lift the cab in
Box and Hydrostatic Drive.
any fashion other than the procedure described
6. Disconnect the brake line at the tee on the cab above. Do not attempt to lift the cab with an
end axle as described in Section 27 - Cab End overhead sling, hydraulic jacks, any type of
Axle and Brakes. “welded on” fixture or any other method that
become unstable and cause the cab to fall. Be
7. Tag and disconnect the control lever linkage from
sure that all personnel are clear of the cab while
the implement valve as described in Section 35
raising or moving it.
- Hydraulics and Steering.
8. Tag and disconnect the control pedal linkage as
18. Lift the cab 152 mm (6 inches) at a time and
described in Section 35 - Hydraulics and
continue to check for any binding or cables/
Steering.
hoses that could catch on the cab frame during
9. Tag and disconnect the steering hydraulic lines lifting.
coming from inside the cab to the implement
19. Once the cab is completely clear of the frame,
valve as described in Section 35 - Hydraulics and
move the overhead hoist away from the tractor
Steering.
and set the cab on a stable platform.
10. Tag and disconnect the hydraulic lines from the
20. Be sure to move any cables, lines or hoses still
reverse valve as described in Section 35 -
attached to the cab so they will not be damaged
Hydraulics and Steering.
when lowering the cab.
11. Disconnect the receiver/dryer outlet line as
described in Section 50 - Climate Control
System.

90-36
SECTION 90 – CAB – CHAPTER 2
Installation 10. Connect the receiver/dryer outlet line as
1. Using an overhead hoist and lifting tool, raise the described in Section 50 - Climate Control
cab and position it in place over the frame of the System.
tractor. 11. Connect the hydraulic lines from the reverse
2. Check to be sure all other cables/hoses are out valve as described in Section 35 - Hydraulics and
of the way so that they will not be caught between Steering.
the cab and frame when the cab is lowered into 12. Connect the steering hydraulic lines coming from
position. inside the cab to the implement valve as
3. Slowly lower the cab onto the stilts that were described in Section 35 - Hydraulics and
installed on the tractor frame when raising the Steering.
cab. 13. Connect the control pedal linkage as described
4. Install the four 3/4 inch bolts included in the in Section 35 - Hydraulics and Steering.
special tool kit. 14. Connect the control lever linkage from the
5. Connect the cab main wiring harness connectors implement valve as described in Section 35 -
at the right-hand side of the tractor as described Hydraulics and Steering.
in Section 55 - Electrical. 15. Connect the brake line at the tee on the cab end
6. Connect the console main wiring harness axle as described in Section 27 - Cab End Axle
connectors at the left-hand side of the tractor as and Brakes.
described in Section 55 - Electrical. 16. Connect the FNR cable from under the cab at the
7. Connect the AC suction line at the inlet port of the bellcrank as described in Section 21 - Splitter
compressor as describe in Section 50 - Climate Box and Hydrostatic Drive.
Control System. 17. Connect the throttle cable at the engine as
8. Connect the heater hose at the left-hand side of describe in Section 10 - Engine.
the frame as described in Section 50 - Climate NOTE: The cab weighs approximately 816 kg (1800
Control System. lbs).
9. Connect the heater hose at the shut-off valve on
the engine as describe in Section 50 - Climate 18. Lower the cab as described previously in this
Control System. section using the hoist lifting tool.
19. Connect the negative battery cables.

90-37