Professional Documents
Culture Documents
Eh Ec210b LC en
Eh Ec210b LC en
Automatic Idling System: Reduces engine speed to idle The following important functions are included in the system:
when the levers and pedals are not activated resulting in less Summation system: Combines the flow of both hydraulic
fuel consumption and low cab noise levels. pumps to ensure quick cycle times and high productivity.
Low-Emission Engine: Boom priority: Gives priority to the boom operation for faster
Make . . . . . . . . . . . . . . . . . . . . VOLVO raising when loading or performing deep excavations.
Model . . . . . . . . . . . . . . . . . . . D6D
Power output at . . . . . . . . . . . 32 r/s (1,900 rpm) Arm priority: Gives priority to the arm operation for faster
Net (ISO 9249/ cycle times in leveling and for increased bucket filling when
SAE J1349) . . . . . . . . . 107 kW (145 ps / 143 hp) digging.
Gross (SAE J1995) . . . . . . . 119 kW (162 ps / 159 hp) Swing priority: Gives priority to swing functions for faster
Max. torque . . . . . . . . . . . . . . 647 N.m at 1,425 rpm simultaneous operations.
No. of cylinders . . . . . . . . . . . 6
Displacement . . . . . . . . . . . . . 5.7 l Regeneration system: Prevents cavitation and provides flow to
Bore . . . . . . . . . . . . . . . . . . . . 98 mm other movements during simultaneous operations for maximum
Stroke . . . . . . . . . . . . . . . . . . . 126 mm productivity.
Power boost: All digging and lifting forces are increased.
Holding valves: Boom and arm holding valves prevent the
digging equipment from creeping.
Power Max: All function speeds are increased.
ELECTRICAL SYSTEM
Main pump:
Type . . . . . . . . . . . 2 x variable displacement axial piston pumps
High capacity electrical system that is well-protected.
Maximum flow . . . 2 x 200 l/min
Waterproof double-lock harness plugs are used to secure
corrosion free connections. The main relays and solenoid Pilot pump:
valves are shielded to prevent damage. The master switch is Type . . . . . . . . . . . Gear pump
standard. Maximum flow . . . 1 x 19 l/min
GROUND PRESSURE
Long crawler machine with 5.7 m monoblock boom, 2.9 m arm, 920 l (740 kg) bucket and 3,700 kg counterweight.
Description Shoe width Operating weight Ground pressure Overall width
600 mm 20,840 kg 43.2 kPa (0.44 kg/cm2) 2,990 mm
2
700 mm 21,290 kg 37.8 kPa (0.39 kg/cm ) 3,090 mm
Triple grouser
2
800 mm 21,560 kg 33.5 kPa (0.34 kg/cm ) 3,190 mm
2
900 mm 21,840 kg 30.2 kPa (0.31 kg/cm ) 3,290 mm
Double grouser 700 mm 21,590 kg 38.4 kPa (0.39 kg/cm2) 3,090 mm
Long crawler machine with 5.7 m monoblock boom, 2.9 m arm, 920 l (740 kg) bucket and 4,200 kg counterweight.
Description Shoe width Operating weight Ground pressure Overall width
2
600 mm 21,340 kg 44.3 kPa (0.45 kg/cm ) 2,990 mm
700 mm 21,790 kg 38.7 kPa (0.39 kg/cm2) 3,090 mm
Triple grouser
2
800 mm 22,060 kg 34.3 kPa (0.35 kg/cm ) 3,190 mm
2
900 mm 22,340 kg 30.9 kPa (0.31 kg/cm ) 3,290 mm
2
Double grouser 700 mm 22,090 kg 39.3 kPa (0.40 kg/cm ) 3,090 mm
BUCKET & ARM COMBINATION
5.7 m Boom
Description Unit
2.5 m Arm 2.9 m Arm 2.9 m HD arm 3.9 m Arm
GP bucket 1.5 t/m3 l 1,450 1,350 1,325 1,150
3
GP bucket 1.8 t/m l 1,250 1,175 1,150 1,000
3
RB bucket 1.8 t/m l 1,100 1,050 1,025 900
RB bucket 2.0 t/m3 l 1,025 975 950 825
5.7 m Boom
Description Unit
2.5 m Arm 2.9 m Arm 2.9 m HD arm 3.9 m Arm
GP bucket 1.5 t/m3 l 1,375 1,275 1,250 1,100
3
GP bucket 1.8 t/m l 1,200 1,125 1,100 950
3
RB bucket 1.8 t/m l 1,200 1,125 1,100 950
3
RB bucket 2.0 t/m l 1,050 1,000 975 850
5.7 m Boom
Description Unit
2.5 m Arm 2.9 m Arm 2.9 m HD arm 3.9 m Arm
GP bucket 1.5 t/m3 l 1,550 1,450 1,425 1,250
GP bucket 1.8 t/m3 l 1,350 1,275 1,250 1,100
3
RB bucket 1.8 t/m l 1,200 1,125 1,100 950
3
RB bucket 2.0 t/m l 1,100 1,025 1,000 900
5.7 m Boom
Description Unit
2.5 m Arm 2.9 m Arm 2.9 m HD arm 3.9 m Arm
3
GP bucket 1.5 t/m l 1,475 1,375 1,350 1,175
GP bucket 1.8 t/m3 l 1,300 1,200 1,175 1,025
3
RB bucket 1.8 t/m l 1,300 1,200 1,175 1,025
3
RB bucket 2.0 t/m l 1,150 1,075 1,050 900
DIMENSIONS
L A
C
M
F
K
J
G I
H B
L'
M'
Boom
Description 5.7 m 5.7 m HD 5.57 m 2-piece
Arm
Description 2.5 m 2.9 m 2.9 m HD 3.9 m
Height
Length 3,530 mm 3,900 mm 3,900 mm 4,940 mm
Height 880 mm 880 mm 880 mm 820 mm
Length
Width 440 mm 440 mm 440 mm 440 mm
Weight 975 kg 1,000 kg 1,085 kg 1,135 kg
* Includes cylinder, piping and linkage
WORKING RANGES & DIGGING FORCES
A
B
H
C D E
C D E
EC210B LC
Across Lifting
undercarriage hook 3.0 m 4.5 m 6.0 m 7.5 m 9.0 m Max. reach
related
Along to ground
Max.
undercarriage level mm
EC210B LC
Across Lifting
undercarriage hook 3.0 m 4.5 m 6.0 m 7.5 m 9.0 m Max. reach
related
Along to ground
Max.
undercarriage level mm
ALTERNATIVE EQUIPMENT
Engine Cab and interior Track shoes Digging equipment
Block heater, 120 V / 240 V Seat: – 600 / 700 / 800 / 900 mm track Boom: 5.7 m monoblock
Fuel filler pump: 35 l/min, – Fabric seat shoes with triple grousers 5.7 m heavy duty
50 l/min with automatic shut-off – Fabric seat, with heater – 700 mm track shoe with double 5.57 m 2-piece
– Fabric seat, with heater and grouser Arm: 2.5 / 2.9 / 3.9 m
Hydraulic system air suspension 2.9 m heavy duty
Pilot-operated wrist control joysticks Superstructure
– Semi-long joysticks Counterweight, 3,700 kg / 4,200 kg
– Control joystick, with 3 switches each
– Control joystick, with 5 switches each
All products are not available in all markets. Under our policy of continuous improvement, we reserve the right to change specifications
and designs without prior notice. The illustrations do not necessarily show the standard version of the machine.