Model Divison Musa Pak
Model Divison Musa Pak
18.70
18.10
17.90
20.00
17.20
16.80
16.60
16.00
15.60
15.30
15.10
15.10
15.10
14.50
14.20
14.10
14.00
13.60
13.42
13.40
13.38
13.30
13.20
13.10
13.02
12.88
15.00
12.34
12.27
12.24
11.47
11.29
11.16
10.00
5.00
0.00
Gulgusht Shamsabad Hassanabad Bosan Road WAPDA Town. Musa Pak Division
No of
Division / Sub-Division
Consumers
Gulgusht 57934
Shamsabad 23169
Hassanabad 62986
Bosan Road 41543
WAPDA Town. 43811
Musa Pak Division 229443
Sr. Sub Grid Feeder Peak Load Annual Energy Loss (KWH)
Division FY 2019-20
No Division Station Name Existing Proposed Saving
WAPDA
Musa Ahmad 390 148345
1 Hassan Abad Town 1441825 41627
Pak 2
Bosan Road Naqshband 220
Bosan Road Pir Khursheed 350
Musa 236519
2 Gulgasht Nawab Pur 1759708 605491
Pak Bosan Road 320 9
Road
Musa Wapda Muhammad 135149
3 Suraj Miani 390 597501 753991
Pak Town Pur 2
Old Garay
Gulgasht Bosan Road 360
Wala
Musa 272470
4 Gulgasht Bosan Road Usman Abad 370 1918649 806060
Pak 9
Gulgasht Bosan Road Khan Village 290
Gulgasht Bosan Road Sabza Zar 300
Musa 209272
5 WAPDA 1665099 427630
Pak Gulgasht Wains 360 9
Town
853412
9 5940957 2634799
By incorporating the saved units in line losses for the F.Year 2020-21 the loss
level of Division will decreased by
i. Line losses analysis of all the 11-KV Feeders vs. Technical losses of Feeders
(reason of difference in technical and actual losses).
ii. Feeder wise Length of HT / LT Line & number of Transformers installed
with calculated KVA.
iii. Feeder wise No. of Connections + Load & category wise active
connections.
iv. Technical Data of Feeders (HT Loss, LT Loss, Max Load, Type of Conductor)
action taken for feeders having lengthy lines and high technical losses.
Feeder wise No. of Tripping with Duration to analyze the less units sold due to
power outage period.
Administrative Loss Reduction
1. Securing of Metering Equipment
i. Identifying / preparation of A/C No. wise list of all the Old design
mechanical Meters installed in the system. Priority with reference to
potential consumers be pared w.r.to meters to be replaced to achieve
maximum benefits.
ii. Consumption / MCO patron of all defective meters (code allotted) be
analyzed to be detect theft of electricity by habitual consumers etc.
3. Organizational Structure.
4. Facilitation to Consumers
i. Restructuring of Customer Service centers / Complaint Centers in all
Sub-Divisions.
ii. Requirement of vehicles for speedy redressal of complaints.
Advantages