The Bid
Before making our bid we carefully examine all of the
relevant factors to determine the most practical approach
to the survey and the equipment needed to meet the
client’s requirements in full.
2
Stage 2
UK Mobilisation
Careful preparation is reflected in the process of checking
and re-checking every item of equipment at our UK base
prior to mobilisation. This involves essential calibration
procedures as well as pressure tests on specific items
of equipment. Surveys are carried out using the latest
technology including:
Stage 3
Overseas Mobilisation
3
The essence of our business is the very close technical
co-operation with survey companies to achieve the most
reliable results in the shortest practical time.
4
Stage 4
Surveying
As the survey proceeds, graphical information
is displayed on screen in ‘real time’ enabling
problem areas to be studied in extra detail.
The condition of anodes and the coating are
continuously monitored and all relevant details Data gathered at mean rate of 10 readings per
are ‘event listed’. The ‘weight coat’ is examined second for extremely detailed potential profile.
visually and ‘stab’ readings are taken to assess
the condition of the di-electric coating, especially Rate can be modified from one potential reading
where damage has occurred. Areas directly per metre to one reading every 10 centimetres
around the platform are also carefully studied to to meet client specifications.
ascertain the condition of the anodes and detect
any problems such as ‘long line current flow’ Enables an extremely detailed potential profile to
where anodes are prematurely consumed. be produced.
Stage 5
Data Processing
5
On board preliminary processing highlights any areas
of concern while the spread is still operational.
Trailing Wire
Platform Surveys
Ship
The trailing wire system (CP PRO/T) is a fast
Insulation Flange (If fitted) and convenient method of undertaking cathodic
protection surveys on buried pipelines, where
ROV methods are not practical or cost effective.
It is ideally suited to infield pipelines up to 40km
in length. Beyond this distance, operational
difficulties and increased inherent inaccuracies
Remote Reference can make the method ineffective. The system
Trailing Wire Electrode
has the following advantages:
Riser
Indicates the effectiveness of cathodic
protection.
Towed Fish & Allows rapid rate of survey.
Close Cell
Ideally suited to buried pipelines.
Pipeline
Hybrid ROV/
Trailing Wire Surveys Platform
Ship
Corrintec are the only company in the world to use
this dual survey method which combines the best Insulation Flange (If fitted)
features of the ROV and Trailing Wire techniques.