ACKNOWLEDGEMENTS
The technical guidelines (TGs) are the result of a collaborative effort between the United Nations Industrial Development
Organization (UNIDO) and the International Network on Small Hydro Power (INSHP). About 80 international experts and 40
international agencies were involved in the document’s preparation and peer review, and they provided concrete comments
and suggestions to make the TGs professional and applicable.
UNIDO and the INSHP highly appreciate the contributions provided during the development of these guidelines and in particular
those delivered by the following international organizations:
- The Global Network of Regional Sustainable Energy Centres (GN-SEC), particularly the ECOWAS Centre for Renewable Energy
and Energy Efficiency (ECREEE), the East African Centre for Renewable Energy and Energy Efficiency (EACREEE), the Pacific
Centre for Renewable Energy and Energy Efficiency (PCREEE) and the Caribbean Centre for Renewable Energy and Energy
Efficiency (CCREEE).
The Chinese government has facilitated the finalization of these guidelines and was of great importance to its completion.
The development of these guidelines benefited greatly from the valuable inputs, review and constructive comments as well
as contributions received from Mr. Adnan Ahmed Shawky Atwa, Mr. Adoyi John Ochigbo, Mr. Arun Kumar, Mr. Atul Sarthak,
Mr. Bassey Edet Nkposong, Mr. Bernardo Calzadilla-Sarmiento, Ms. Chang Fangyuan, Mr. Chen Changju, Ms. Chen Hongying ,
Mr. Chen Xiaodong, Ms. Chen Yan, Ms. Chen Yueqing, Ms. Cheng Xialei, Ms. Chileshe Kapaya Matantilo, Ms. Chileshe Mpundu
Kapwepwe, Mr. Deogratias Kamweya, Mr. Dolwin Khan, Mr. Dong Guofeng, Mr. Ejaz Hussain Butt, Ms. Eva Kremere, Ms. Fang
Lin, Mr. Fu Liangliang, Mr. Garaio Donald Gafiye, Mr. Guei Guillaume Fulbert Kouhie, Mr. Guo Chenguang, Mr. Guo Hongyou, Mr.
Harold John Annegam, Ms. Hou Ling, Mr. Hu Jianwei, Ms. Hu Xiaobo, Mr. Hu Yunchu, Mr. Huang Haiyang, Mr. Huang Zhengmin, Ms.
Januka Gyawali, Mr. Jing Songkun, Mr. K. M. Dharesan Unnithan, Mr. Kipyego Cheluget, Mr. Kolade Esan, Mr. Lamyser Castellanos
Rigoberto, Mr. Li Zhiwu, Ms. Li Hui, Mr. Li Xiaoyong, Ms. Li Jingjing, Ms. Li Sa, Mr. Li Zhenggui, Ms. Liang Hong, Mr. Liang Yong, Mr.
Lin Xuxin, Mr. Liu Deyou, Mr. Liu Heng, Mr. Louis Philippe Jacques Tavernier, Ms. Lu Xiaoyan, Mr. Lv Jianping, Mr. Manuel Mattiat,
Mr. Martin Lugmayr, Mr. Mohamedain Seif Elnasr, Mr. Mundia Simainga, Mr. Mukayi Musarurwa, Mr. Olumide Taiwo Alade, Mr.
Ou Chuanqi, Ms. Pan Meiting, Mr. Pan Weiping, Mr. Ralf Steffen Kaeser, Mr. Rudolf Hüpfl, Mr. Rui Jun, Mr. Rao Dayi, Mr. Sandeep
Kher, Mr. Sergio Armando Trelles Jasso, Mr. Sindiso Ngwenga, Mr. Sidney Kilmete, Ms. Sitraka Zarasoa Rakotomahefa, Mr. Shang
Zhihong, Mr. Shen Cunke, Mr. Shi Rongqing, Ms. Sanja Komadina, Mr. Tareq Emtairah, Mr. Tokihiko Fujimoto, Mr. Tovoniaina
Ramanantsoa Andriampaniry, Mr. Tan Xiangqing, Mr. Tong Leyi, Mr. Wang Xinliang, Mr. Wang Fuyun, Mr. Wei Jianghui, Mr. Wu
Cong, Ms. Xie Lihua, Mr. Xiong Ji, Ms. Xu Jie, Ms. Xu Xiaoyan, Mr. Xu Wei, Mr. Yohane Mukabe, Mr. Yan Wenjiao, Mr. Yang Weijun,
Ms. Yan Li, Mr. Yao Shenghong, Mr. Zeng Jingnian, Mr. Zhao Guojun, Mr. Zhang Min, Mr. Zhang Liansheng, Mr. Zhang Zhenzhong,
Mr. Zhang Xiaowen, Ms. Zhang Yingnan, Mr. Zheng Liang, Mr. Zheng Xiongwei, Mr. Zheng Yu, Mr. Zhou Shuhua, Ms. Zhu Mingjuan.
Further recommendations and suggestions for application for the update would be highly welcome.
Table of Contents
Foreword VII
Introduction VIII
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Turbine 1
4.1 General requirements for turbine type selection 1
4.2 Selection of the rated head 3
4.3 Turbine type selection 3
4.4 Selection of the basic parameters of the reaction turbine 5
4.5 Selection of basic parameters of the Pelton turbine 7
4.6 Calculation of the regulation guarantee of the unit 9
5 Generator 9
5.1 General requirements for generator type selection 10
5.2 Rated data and main parameter selection 10
5.3 Selection of the generator mechanical structure 15
5.4 Generator auxiliary system 16
8 Auxiliary system 21
8.1 Technical water supply and the drainage systems 21
8.2 Oil system 22
8.3 Compressed air system 22
8.4 Hydraulic monitoring system 23
8.5 Selection of the lifting equipment 23
8.6 Heating and ventilation 23
8.7 Allocation of maintenance equipment for the electro-mechanical equipment 24
8.8 Schematic diagrams of typical oil, air and water systems 24
Foreword
The United Nations Industrial Development Organization (UNIDO) is a specialized agency under the United
Nations system to promote globally inclusive and sustainable industrial development (ISID). The relevance of
ISID as an integrated approach to all three pillars of sustainable development is recognized by the 2030 Agenda
for Sustainable Development and the related Sustainable Development Goals (SDGs), which will frame United
Nations and country efforts towards sustainable development in the next fifteen years. UNIDO’s mandate for
ISID covers the need to support the creation of sustainable energy systems as energy is essential to economic
and social development and to improving quality of life. International concern and debate over energy have
grown increasingly over the past two decades, with the issues of poverty alleviation, environmental risks and
climate change now taking centre stage.
INSHP (International Network on Small Hydro Power) is an international coordinating and promoting
organization for the global development of small hydropower (SHP), which is established on the basis of
voluntary participation of regional, subregional and national focal points, relevant institutions, utilities
and companies, and has social benefit as its major objective. INSHP aims at the promotion of global SHP
development through triangle technical and economic cooperation among developing countries, developed
countries and international organizations, in order to supply rural areas in developing countries with
environmentally sound, affordable and adequate energy, which will lead to the increase of employment
opportunities, improvement of ecological environments, poverty alleviation, improvement of local living and
cultural standards and economic development.
UNIDO and INSHP have been cooperating on the World Small Hydropower Development Report since year
2010. From the reports, SHP demand and development worldwide were not matched. One of the development
barriers in most countries is lack of technologies. UNIDO, in cooperation with INSHP, through global expert
cooperation, and based on successful development experiences, decided to develop the SHP TGs to meet
demand from Member States.
These TGs were drafted in accordance with the editorial rules of the ISO/IEC Directives, Part 2 (see www.iso.
org/directives).
Attention is drawn to the possibility that some of the elements of these TGs may be subject to patent rights.
UNIDO and INSHP shall not be held responsible for identifying any such patent rights.
Introduction
Small Hydropower (SHP) is increasingly recognized as an important renewable energy solution to the
challenge of electrifying remote rural areas. However, while most countries in Europe, North and South
America, and China have high degrees of installed capacity, the potential of SHP in many developing countries
remains untapped and is hindered by a number of factors including the lack of globally agreed good practices
or standards for SHP development.
These Technical Guidelines for the Development of Small Hydropower Plants (TGs) will address the current
limitations of the regulations applied to technical guidelines for SHP Plants by applying the expertise and
best practices that exist across the globe. It is intended for countries to utilize these agreed upon Guidelines
to support their current policy, technology and ecosystems. Countries that have limited institutional and
technical capacities, will be able to enhance their knowledge base in developing SHP plants, thereby attracting
more investment in SHP projects, encouraging favourable policies and subsequently assisting in economic
development at a national level. These TGs will be valuable for all countries, but especially allow for the
sharing of experience and best practices between countries that have limited technical know-how.
The TGs can be used as the principles and basis for the planning, design, construction and management of
SHP plants up to 30MW.
• The Terms and Definitions in the TGs specify the professional technical terms and definitions commonly
used for SHP Plants.
• The Design Guidelines provide guidelines for basic requirements, methodology and procedure in terms
of site selection, hydrology, geology, project layout, configurations, energy calculations, hydraulics,
electromechanical equipment selection, construction, project cost estimates, economic appraisal,
financing, social and environmental assessments—with the ultimate goal of achieving the best design
solutions.
• Units Guidelines specify the technical requirements on SHP turbines, generators, hydro turbine governing
systems, excitation systems, main valves as well as monitoring, control, protection and DC power supply
systems.
• The Construction Guidelines can be used as the guiding technical documents for the construction of SHP
projects.
• The Management Guidelines provide technical guidance for the management, operation and maintenance,
technical renovation and project acceptance of SHP projects.
1 Scope
This Part of Design Guidelines specifies the type selection design and the arrangement of the main and
auxiliary hydraulic machinery, the type selection design and arrangement of the turbine as well as the design
of the heating, ventilation and fire control systems of the SHP station. It includes the basic principles of the
type selection for the different machines, the selection and calculation of the basic parameters, the scheme
comparison as well as the examples of typical diagrams of the different powerhouse layouts.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content constitutes
requirements of this document. For dated references, only the edition cited applies. For undated references,
the latest edition of the referenced document (including any amendments) applies.
SHP/TG 001, Technical guidelines for the development of small hydropower plants —Terms and definitions.
4 Turbine
4.1.2 The turbine type selection shall include the following contents:
d) Selection of the basic parameters of the turbine, including the shaft power, runner diameter, rated speed,
rated discharge, efficiency, draft height and the setting elevation. For the impulse turbine, it is necessary
to select the jet diameter, number of nozzles and the draining height;
e) Selection of the appropriate model runner and the plotting of the turbine operating characteristic curve;
f) Estimation of the overall dimensions, weight and cost of the main components of the turbine;
4.1.3 Basic information for the selection of the hydropower station particulars shall include:
a) Operating head of the turbine (including the maximum head, minimum head and weighted average head).
e) Parameters of the power generation and water conveyance systems (including the type, arrangement,
length, pipe diameter and head losses of all the water conveyance systems from the water inlet for the
generation to the tailwater outlet of the hydropower station);
g) Guaranteed output of the hydropower station, the power weighting factor can be provided when necessary;
h) Operation mode of the hydropower station in the electrical power system, reservoir operation and power
evacuation modes;
i) Quality of the water passing through the turbine (including the sediment concentration through the
turbine, the particle size grading, Moh’s hardness, mineral composition, PH value and water temperature);
j) Meteorological conditions of the hydropower station (including the air temperature, water temperature
and relative humidity);
k) Geographic position of the hydropower station (including the sea level elevation, atmospheric pressure
and gravitational acceleration of powerhouse).
4.2.2 As for the hydropower station with the medium/high head, the rated head should be selected within
the scope of 0.85 to 0.95 times the weighted average head.
4.2.3 As for the run-of-river hydropower station, the rated head shall guarantee that the hydropower station
may generate the installed capacity.
4.2.4 As for the hydropower station on an overloaded river with the reservoir operating in a mode of “storing
clear water and discharging muddy water”, the rated head should be selected within the scope between the
weighted average head and the lower limit productive head in the storage period of the reservoir.
4.2.5 When the rated head is close to the minimum head, it is necessary to demonstrate its rationality and
economic efficiency. With regard to the impulse turbine with high head with small variation of the reservoir
water level, the minimum head may be used as the rated head of the turbine.
Turbine type
Classification as per the Classification as per the Classification as per the Applicable head scope, m
energy conversion mode water flow direction structural feature
Bulb turbine
shaft-extension-type
Through-flow turbine
tubular turbine 3~30
pit turbine
Propeller turbine
Axial-flow turbine 3~80
Kaplan turbine
NOTE The applicable head scope is the parameter under normal conditions, which may be determined through comprehensive
comparison according to the specific situation and the special requirements of the different projects when selecting the type of small
turbine. The applicable head scope for the various types of units in the junction head section may be appropriately broadened.
4.3.2 As for the run-of-river hydropower station with a maximum head of 20m or lower and a capacity
greater than 10MW, the through-flow turbine should be selected by preference.
4.3.3 When there are two applicable turbine types under the junction head, it is necessary to select one
through technical and economical comparison in the respect of the technical characteristic parameters, the
economic indicators, operational reliability and the design and manufacturing difficulty.
4.3.4 The model runner should be selected in combination with the selected turbine type and according to
the operation head of the hydropower station, after appropriate technical and economical comparisons.
4.3.5 The model runner of the turbine shall have relatively higher energy and cavitation performance, and its
performance shall be free from any obvious pressure fluctuations and cavitation in all operating conditions.
4.3.6 For the hydropower station on an overloaded river, it is necessary to select the model runner with a
relatively lower rotating speed; for the hydropower station with big head variation, it is necessary to select
the model runner with the wider stable operating range; for the hydropower station in high altitude localities,
it is necessary to select the model runner with the appropriate cavitation performance in combination with
the setting elevation element.
4.3.7 The layout of the vertical shaft and horizontal shaft Francis turbines and impulse turbines should be
combined with the single unit capacity, the diameter of the runner, and the appropriate speed and plant
layout. The horizontal shaft should be preferred.
4.3.8 See Appendix C.4 to Appendix C.7 for the small turbine generator units with the conventional vertical
shaft and the horizontal shaft.
4.4.2 According to the comparative calculation, the different parameter combination schemes should
be combined with the power plant layout, the actual topography and geological conditions, the operating
water head range and the reservoir regulation characteristics, and the technical characteristics, economic
indicators, operational reliability, and design and manufacturing technology level, after technical and
economy comparison, a reasonable scheme for the basic parameters of the hydraulic turbine is selected.
4.4.3 After determining the main parameters of the turbine, the turbine operating performance curve
including the iso-efficiency curve, the iso-cavitation curve and the output limitation curve should be drawn.
4.4.4 Axial hydraulic thrust and the main component weight of the turbine should be estimated.
4.4.5 The turbine shall have the relatively higher weighted average efficiency and the operational scope shall
include the high efficiency area. The overall operating condition of the turbine in the working water head
should be better, and there is no obvious vibration area.
4.4.6 The draft height and setting elevation of the turbine shall be determined according to the following
requirements:
a) The draft height of the reaction turbine shall be respectively calculated in accordance with the operating
conditions under the different characteristic heads and their corresponding initial cavitation coefficients
σi. If no initial cavitation coefficient σi is available, it may be calculated with the critical cavitation
coefficient multiplied by the ratio coefficient Kσ.
b) Under the condition that the power plant units share the tail water pool, when 1 or 2 units are installed,
the requirements of the suction height and the tailwater level of a unit at 50% maximum output operation
under various water heads should be satisfied; when more than 2 units are installed, the requirements of
the suction height and the tailwater level of one unit at maximum output operation under various water
heads should be satisfied.
c) The design tailwater level for determining the setting elevation shall be selected with comprehensive
consideration given to the relation curve between the tailwater level and the discharge, the power
generation requirement at the preliminary stage, the requirements for flood control and the operational
water level of the downstream cascade power stations.
d) The setting elevation of the turbine shall meet the requirements for the draft height and the corresponding
tailwater level under various operating conditions, and shall comply with the requirement that the
minimum submerged depth of the upper edge of the draft tube (or the tailrace tunnel, excluding the
tailrace tunnel with sloping ceiling) outlet shall not be less than 0.3m to 0.5m.
e) In addition to satisfying the aforementioned conditions a), b), c)and d), the final selection of the installation
elevation should be based on the actual topographic and geological conditions of the project, the layout of
the plant hub and other factors, and the comparison between technique and economics.
4.4.7 The maximum runaway speed of the Francis or propeller turbine should be determined according to the
maximum net water head and the maximum unit runaway speed. The maximum runaway speed of the Kaplan
turbine should be calculated according to the coupled relationship. When there are special requirements, it
can be calculated according to the damage from the on-cam operating condition.
4.4.8 The turbine runner diameter shall be calculated by the formula (1).
Nf
D1 .....................................................................(1)
9.81Q H sj1.5T f
'
1
where
4.4.9 The rated rotating speed shall be calculated by the formula (2):
n1' H pj
nr ........................................................................................ (2)
D1
where
n1’ is the unit speed, r/min; (1-1.05)n10’is taken for Francis turbine; 1.1n10’is taken for high specific speed
ial-flow turbine;
4.4.10 See Appendix A for reference formulas for the rated discharge Qr , draft height H S , setting elevation
of the turbine and the correction calculation of the reaction turbine efficiency.
4.5.2 After the main parameters of the turbine are determined, the turbine operating performance curves
including the turbine output limitation curve and the equivalent efficiency curve shall be drawn.
4.5.3 The basic parameters of the Pelton turbine may be calculated with the fixed specific speed method
and converted according to the combined characteristic curve of the model, or calculated with the variable
specific speed method.
4.5.4 The number of nozzles of the Pelton turbine is usually 1, 2, 4 or 6; the number of nozzles shall be
selected with consideration given to the arrangement of the nozzles to avoid the mutual interference of the
jet flow.
4.5.5 When selecting the number of nozzles, it is necessary to avoid the jet flow funnel phenomenon,
meanwhile the arrangement and machining of the buckets shall be taken into account.
4.5.6 As for the multi-nozzle turbine, its jet flow intersection angle shall not be a multiple integer of the
intersection angle between the adjacent buckets.
4.5.7 For ensuring the relatively higher efficiency of the turbine, it is necessary to select the value m within
the scope of 10 to 20; when selecting the value m, it is necessary to consider the manufacturing of the runner
and the strength of the bucket; usually, the higher value is taken for the high head and the smaller value is for
the low head.
4.5.8 When calculating the unit discharge of the turbine, it is necessary to consider that the value m of the
real turbine is different from that of the model turbine; its unit discharge may be converted by the formula
(3):
4.5.9 The efficiency of the Pelton turbine is usually same as the efficiency of the model turbine and will not
be corrected. When the value m of the turbine exceeds the scope of 10 to 20, about 0.5% negative correction
may be considered.
4.5.10 The design head of the turbine shall be the head corresponding to the maximum efficiency point of the
model, and the operation scope of the turbine shall include the high efficiency area.
4.5.11 The maximum unit runaway speed of the Pelton turbine may usually be 70r/min.
4.5.12 The draining height of the Pelton turbine shall be selected to ensure the safe and stable operation of
the turbine, avoid the influence of the tailwater surge and keep sufficient aeration height for the tailrace at the
maximum tailwater level and under any power generating condition of the hydropower station.
4.5.13 The discharge height should be the diameter (1 to 1.5) D1 of the runner pitch circle. The horizontal
shaft unit should have a low value, the vertical shaft unit should have a large value. When determining the
discharge height, the necessary ventilation height should be ensured, and the ventilation height should be no
less than 300 mm.
4.5.14 The runner diameter and the value m shall be calculated by the formula (4) and the formula (5):
(39 ~ 40) H sj
D1
nr ........................................................................(4)
D1
m=
d 0 .......................................................................................(5)
where
The value m should be within the scope of 10-20. The lower value applies to the low head and the higher
value applies to the high head.
4.5.15 See Appendix B for the reference formulas for the estimation of the jet diameter d 0 , rated speed
nr , nozzle diameter d p and the number of buckets Z1 of the Pelton turbine and the calculation of the draining
height h p and setting elevation .
4.5.16 The basic parameters of the inclined-jet turbine and the cross-flow turbine may be selected with
reference to the requirements in this section.
4.6.2 As for the hydropower station with bifurcated penstocks, the maximum speed rising ratio of the units
and the maximum pressure rising ratio at the end of the spiral casing shall be calculated according to the
number of units connected to the main penstock and the main electrical connection mode, as well as the
number of units that are able to simultaneously perform load shedding.
4.6.3 As for the hydropower station with a relatively simpler power generation and water conveyance
system, the calculation of the regulation guarantee may be conducted by the empirical formula, and with the
numerical method or the analytical method; as for the hydropower station with a complex water conveyance
system, the calculation shall be made by computer simulation.
4.6.4 Axial-flow and through-flow turbine units should be equipped with a closing device with two gradients
of closing rate to reduce the reverse hydraulic thrust and mitigate the influence of the turbine lifting.
4.6.5 The water flow inertia time constant Tw of the water conveyance system for the turbine without a
pressure regulating facility shall not be more than 4s; the inertia time constant Ta of the reaction turbine unit
shall not be less than 4s and the inertia time constant Ta for the impulse turbine unit shall not be less than
2s.The specific value Tw/Ta shall not be more than 0.4; if Tw/Ta is more than 0.4, the water diversion system
and unit stability calculation shall be performed in case of small fluctuations according to the actual situation.
4.6.6 When calculating the rising ratio of the rotating speed of the axial-flow and through-flow turbine
units, it is necessary to include the influence of the inertia moment of the water flow; the calculation of the
regulation guarantee shall include the pressure of the reverse water hammer.
4.6.7 In case of load shedding, the guarantee value of the maximum rising ratio of the rotating speed shall be
selected according to the following different circumstances:
a) The guarantee value should be less than 50% when the proportion of the unit capacity to the total capacity
of the electrical power system is relatively large or the unit has the frequency adjustment function;
b) The guarantee value should be less than 60% to 65% when the proportion of the unit capacity to the total
capacity of the electrical power system is not large, or the unit has no frequency adjustment function;
c) The maximum rising ratio of the rotating speed of the through-flow turbine unit should be less than 65%;
d) The maximum rising ratio of the rotating speed of the impulse turbine unit should be less than 30%.
4.6.8 In case of load shedding, the guarantee value of the maximum pressure rising ratio at the end of the
spiral casing (in front of the movable guide vane of the through-flow turbine unit) shall be selected as per the
following circumstances:
a) The guarantee value should be 70% to 100% if the rated head is less than 20m;
b) The guarantee value should be 70% to 50% if the rated head is 20m to 40m;
c) The guarantee value should be 50% to 30% if the rated head is 40m to 100m;
d) The guarantee value should be 30% to 25% if the rated head is 100m to 300m;
e) The guarantee value should be less than 25% if the rated head is more than 300m.
4.6.9 When the unit load suddenly increases or decreases, the minimum pressure at the highest point of
various sections along the entire length of the penstock shall not be less than 0.02MPa, and the negative
pressure flow separation phenomenon shall not occur.
4.6.10 In case of load shedding, the maximum vacuum guarantee value at the entrance section of the draft
tube shall not be more than 0.08MPa.
5 Generator
5.1.2 The type selection for the generator shall include the following contents:
f) Insulation grade;
g) Exciting mode;
j) Estimation of the overall dimensions, weight and cost of the main components of the generator.
a) Determine the power and rotating speed according to the turbine characteristics;
b) Determine the voltage and power factor according to the requirements of the electrical power system;
c) Determine the moment of inertia of the generator according to the calculation of the regulation guarantee
of the hydropower station and the requirement of the electrical power system;
d) Determine the structural style of the generator according to the general situation.
5.2.1 Power
1) Directly coupled unit: The rated power of the generator shall be equal to the rated output of the
turbine multiplied by the generator efficiency;
2) Booster unit: The rated power of the generator shall be equal to the rated output of the turbine
multiplied by the booster efficiency and by the generator efficiency.
0.5, 0.63, 0.8, 1.0, 1.25, 1.6, 2.0, 2.5, 3.2, 4.0, 5.0, 6.3, 8.0, 10.0
5.2.2 Voltage
a) The requirements of the power grid of the country where the hydropower station is located.
b) The rated voltage shall be selected with consideration given to the value range of the rated current. The
rated current shall be calculated by the formula (6):
1000 Pr
Ir =
3U r cos ..............................................................................(6)
where
a) The rated power factor may lag 0.8 or 0.92 under the premise of meeting the requirements of the power
grid;
b) Under rated power of the generator, the leading phase operation depth is allowed;
c) It is preferable to select a higher power factor value when the system permits, select a lower value when
the hydropower station is close to the load centre and select a higher value when the transmission
distance is great.
a) The rated synchronous speed of the generator shall be determined by the turbine type. It shall be
calculated by the formula (7):
60 fr
nr =
p .....................................................................................(7)
where
Number of
4 6 8 10 12 14 16 (18) 20 (22) 24
poles 2p
nr (50Hz) 1500 1000 750 600 500 428.6 375 (333.3) 300 (272.7) 250
nr (60Hz) 1800 1200 900 720 600 514.3 450 (400) 360 (327.3) 300
Number of
(26) 28 30 32 (34) (36) 40 42 (44) 48 (50)
poles 2p
nr (50Hz) (230.8) 214.3 200 187.5 (176.5) (166.7) 150 142.9 (136.4) 125 (120)
nr (60Hz) (276.9) 257.1 240 225.0 (211.8) (200) 180 171.4 (163.6) 150 (144)
Number of
(52) 56 60 64 (66) (68) 70 (72) (78) 80 …
poles 2p
nr (50Hz) (115.4) 107.1 100 93.8 (90.9) (88.2) 85.7 (83.3) (76.9) 75 …
nr (60Hz) (138.5) 128.6 120 112.5 (109.1) (105.9) 102.9 (100) (92.3) 90 …
NOTE The rotating speeds not in parentheses are the recommended speeds; the rotating speeds in parentheses may be selected when
necessary.
c) The coefficient for determination of the unit rotating speed shall be calculated by the formula (8); the
coefficient for determination of the rotating speed shall meet the provisions of Table 3:
Kn = Pr(10 3 nr ) 3 .............................................................................(8)
where
2<Kn≤4
Rotating speed type Ultra-low speed Low speed Medium speed High speed Ultra-high speed
The generator efficiency is positively correlated to the capacity and the rotating speed. At the rated power
factor, the relationship between generator power and efficiency shall meet the requirements in Table 4.
The insulation grade of the generator shall be Grade F. In the high altitude region or under special ambient air
temperature, the temperature rise shall be corrected.
a) The mechanical time constant shall be calculated by the formula (9); the value range shall meet the
provision of Table 5.
Tmec = 2.74GD 2 (10 3 nr ) 2 / Pr ................................................................(9)
where
1) A small amount of increase may be realized by increasing the weight of the rotor section with the
larger rotary diameter;
2) A relatively greater amount of increase may be realized by increasing the size of the stator bracket;
3) For the horizontal unit, the moment of inertia may be increased by installing the additional flywheel
according to the provisions in Table 6.
1) The moment of inertia for the unit shall be determined through calculation of the regulation guarantee
of the hydraulic system of the hydropower station;
2) The value for the moment of inertia shall be reasonable; when the relatively higher moment of inertia
is required, it is necessary to comprehensively consider the influences on generator dimension,
appearance, efficiency, stability and weight.
The value for the generator short-circuit ratio shall be in the range provided in Table 7.
Table 7 Value for the power factor and the short-circuit ratio
a) Common sizes include(mm): 740, 850, 990, 1180, 1430, 1730, 2150, 2600, 2860, 3250, 3300, 3600, 3850,
4250, 4650, 5000, 5500 and 6000;
b) The conventional size of the stator bracket may be estimated by the formula (10):
Pr 1.25 0.25
D 1500( kd )
nr ....................................................................... (10)
where
Kd is the value coefficient, take 1.35 for ultralow speed, 1.4 for low speed and 1.5 for other speeds.
c) The size of the stator bracket of the vertical reaction turbine unit may be calculated by the formula
(11):
2.7
D K S D1 1
2 P .......................................................................... (11)
where
Ks is the take 1.35 for the axial-flow turbine and 1.45 for the Francis turbine;
d) The value D for the generator shall be estimated by the formula (10), another value D for the vertical
reaction generator shall be estimated by the formula (11) as if the head cover is lifted out in its
entirety from the inner circle of the core; the higher value shall be selected after comparison, and
e) It is necessary to select the smaller size for the horizontal unit to reduce the centre height of the unit and
to improve the unit stability.
5.3.2 Bearings
There are mainly two bearing types, i.e. rolling bearing and sliding bearing:
a) Each generator shall be fitted with at least two bearings which shall be selected by the manufacturer
according to the load condition.
b) Rolling bearing applies to the series of the horizontal generator with a bracket diameter of990 mm or
smaller and the unit has two or three or four fulcrums, as well as the vertical generator with a bracket
diameter of 1180 mm or smaller which does not sustain the weight of the rotary part and the axial
hydraulic thrust of the turbine.
d) Except that the horizontal impulse unit is fitted with only two transverse bearings, the generator unit of
the other types shall be fitted with at least one thrust bearing.
The cooling mode of the generator is air cooling - the ventilation patterns mainly include closed recirculation,
duct ventilation and open-type ventilation.
a) Closed recirculation: The hot air generated from the cooling of the generator is cooled in the air cooler,
and then returned to the generator in a closed loop which applies to generators of all types. The closed-
recirculation air cooler of the horizontal generator may be arranged in the turbine pit by the side or on
the top of the generator.
b) Duct ventilation: Including the ordinary duct ventilation structure employing the direct axial air inlet
mode and the closed-pipeline ventilation structure absorbing air from the turbine pit.
c) Open-type ventilation: Take air from the powerhouse to cool down the generator and then discharge the
hot air directly in the powerhouse.
d) See Table 8 for the application scope of the different ventilation types.
NOTE Both ventilation patterns within the power range overlapping two columns may be selected for the generator.
The unit with the sliding bearing should be equipped with mechanical braking devices, while the impulse
turbine unit with reverse jet braking should not be equipped with mechanical braking
a) The braking medium of the mechanical braking device should be0.7MPa compressed air or the pressure
oil of the regulator after pressure reduction.
c) In the mechanical braking device for the vertical generator, the pressure oil shall be able to jack up the
rotating part of the unit and the lock safely on any position - the brake with a piston diameter of more
than 100mm shall employ the oil-gas separation structure.
The fire extinguishing method shall be selected for the hydropower station and generators according to the
local fire control specifications.
The generator shall determine whether to install the dehumidification device according to different
environmental humidity and unit capacity. The dehumidification device may be electric the heater and the
dehumidifier. In case of the electric heater, it is necessary to ensure that the air temperature in the turbine
pit is 5K higher than the ambient temperature, meanwhile a local high temperature which might damage the
insulation is unacceptable.
6.1.2 The operating capacity of the governor shall match with the turbine. The governor shall use the most
advanced and latest technology, operate reliably, be convenient for maintenance and easily realize the
automation of the hydropower station.
6.1.3 The unit which might operate in the isolated grid shall be equipped with the microprocessor-based
automatic turbine control system for the convenience of ensuring the safety of the equipment in the
hydropower station and the electrical safety of the users when the unit is disconnected from the system.
6.1.4 As for the small and miniature units without the frequency regulation task and with no need to
guarantee the auxiliary power when the unit breaks down, it is allowed to select the electric actuator or the
hydraulic actuator, but it is necessary to ensure that the unit could stop safely and reliably when it breaks
down. As for the hydropower station without the DC operating power supply, the actuator selected shall have
the emergency shutdown device acting in case of power failure.
6.1.5 As for the governor with the pressure regulating valve control function, the control of its pressure
regulating valve shall employ the hydraulic-coordinated mechanism.
6.1.6 The governor should employ the structural style of the high oil pressure (10MPa and above) bladder
type accumulator and be fitted with the external servomotor.
6.1.7 The governor shall satisfy all kinds of requirements for automatic regulation and remote control. It
could be operated manually and meet the demands in the process of starting, stopping, emergency stopping,
and the overhaul process of the unit.
6.2.2 The operating capacity of the control systems for the medium and small sized Francis and axial-flow
fixed blade propeller turbine may be calculated by the formula (12):
A = KQ H max D1
........................................................................ (12)
where
6.2.3 See Appendix C for the reference formulas for the calculation of the operating capacity of the governing
systems of the impulse turbine, Kaplan turbine, shaft-extension through-flow and bulb through-flow turbines.
6.3.2 The technologically advanced and latest hardware and supporting electronic components should be
adopted, and the hardware should be the programmable logic controller (PLC) or the single chip, and the
interface communicating with the monitoring system shall be equipped.
6.3.3 The control system of the governor shall have the following basic auxiliary functions: the frequency
tracking (for fast synchronization), trouble detection and treatment, artificial dead band, non-disturbance
manual automatic switchover, auxiliary test and partial fault-tolerance functions.
7.1.2For the unit water conveyance system of the dam toe hydropower station with the short penstock, or
the low head unit water conveyance system of the runoff type hydropower station or the river bed type
hydropower station, the intake or tailwater outlet has been equipped with the fast gate as the unit accident
protection, so the intake valve cannot be installed before the turbine.
7.2.2 The selection of main valve shall include the following contents:
7.2.3 Basic information for the type selection of the intake valves:
a) The maximum static head and the maximum transient pressure at the intake valve of the power station;
d) The content and characteristics of the sediment passing through the machine;
a) The butterfly valve, spherical valve and gate valve are often used as the main valves of the turbine. When
the head is lower than 250m, the butterfly valve should be selected. When the head is higher than 250m
(inclusive), the spherical valve or the gate valve should be selected. The butterfly valve used as the main
valve of the turbine shall be of the eccentric structure, the valve body shall be marked with an arrow
indicating the water flow direction. Full-bore fixed spherical valve shall be used and arranged horizontally.
The gate valve shall be of full-bore structure and the valve shaft shall be installed vertically.
b) The main valve of the turbine shall be able to be closed in flowing water - the closing time shall not
exceed the time allowable for the continuous operation of the unit under maximum runaway speed. The
main valve can be opened normally and will not produce harmful vibration when the pressure difference
between both sides is not more than 30% of the maximum static water pressure.
a) The design pressure of the main valve is the maximum transient pressure, in MPa.
b) The nominal diameter of the butterfly valve may be calculated by the formulas (13) and (14):
D0
Df =
................................................................................. (13)
= 1 0.06873 H max
..................................................................... (14)
where
c) The operating mode of the main valve shall meet the following requirements:
1) The main valve may be operated manually, hydraulically or electrically. As for the hydropower station
designed to be unattended (or attended with few people), the main valve shall be electrically or
hydraulically driven. Manually operated main valve is used for very small turbines.
2) The hydraulically-driven main valve has mainly two types – namely the counterweight and the
accumulator type. The counterweight hydraulic control device opens the valve with the oil pressure
supplied by the oil pump and closes the valve with the counterweight. The accumulator type control
device opens or closes the valve with the oil pressure supplied by the accumulator and the oil pump
is equipped to maintain the oil pressure in the accumulator. The hydraulically-driven main valve shall
be equipped with the manual mechanical locking device for overhaul.
3) The manual valve shall be fitted with a legible arrow indicating the closing direction.
d) The type selection and diameter of the bypass valve shall meet the following requirements:
1) The bypass valve may employ the straight-through valve or the angle valve. As for the medium and
low heads, the straight-through valve is usually used and, as for the high head, the angle valve is used.
2) The discharge capacity of the bypass valve shall be greater than the water leakage of the guide vane -
its nominal diameter shall not be less than 10% of the nominal diameter of the main valve.
3) As for the high sediment concentration and the relatively higher head, the diameter of the bypass
valve may be preliminarily calculated by the formula (15):
Qsj
D p = (0.29 ~ 0.33)
H sj
.............................................................. (15)
where
e) The adjustable scope of the opening and closing time of the main valve should be 60s to 120s. The
closing time of the main valve in flowing water shall not exceed the allowable operating time of the
unit at maximum runaway speed.
When the head is medium or low and the sediment concentration in the water flow is high, the rubber soft
seal should be used; when the head is high and the sediment concentration is low, the metal hard seal should
be used. The shaft end seal may employ the entire-loop solid rubber seal.
8 Auxiliary system
8.1.3 The technical water supply system shall be able to be operated automatically.
8.1.4 The water for the main shaft seal of the turbine should be provided with the standby water source
which could be put into use automatically.
8.1.5 When the water is supplied by pump, it is necessary to provide the standby water pump.
8.1.6 The technical water supply system shall be equipped with the water filter. When the water filter is
filtering the dirt, the water supply for the system shall not be interrupted. The quality of the water used for
the bearing lubrication and main shaft sealing shall meet the requirements for cleanliness for the desired
use.
8.1.7 The water drainage for unit overhaul (dewatering) and for leakage in the power plant should be
realized with separate but interconnected drainage systems. Two drainage pumps shall be installed for the
maintenance of the unit, and the total displacement shall be guaranteed to exclude the total displacement
of one unit for maintenance within 4h to 6h. There shall be no less than two drainage pumps for the water
collecting well in the plant, one of which is standby, and the drainage pump shall be automatically controlled
according to the change in water level of the water collecting well.
8.1.8 The outdoor drainage system in the plant area shall be an independent system, which shall not feed
water into the water-collecting well or the water-collecting gallery in the plant.
8.1.9 Power station leakage and drainage shall not be directly discharged into the river without treatment.
8.2.2 Insulation oil system for the hydropower station may not be necessary.
8.2.3 The volume of the turbine oil tank shall meet the requirements for oil storage, oil replacement during
overhaul and oil purification. The volume of the turbine oil tank should be 110% of the oil consumption of
the unit with maximum capacity.
8.2.4 The oil treatment equipment shall include the oil pump and oil purification equipment. Their types,
capacity and quantity shall be determined according to the oil consumption of the hydropower station.
8.2.5 A central oil service system should be established for the cascade hydropower stations or a group of
hydropower stations. The central oil service system shall be equipped with the oil storage, oil treatment and
oil purification equipment. The configuration of the oil system for the hydropower station equipped with
central oil service system shall be simplified.
8.3.2 The pressure of the medium pressure air compressor system for the inflation of the oil pressure supply
unit shall be determined according to the rated operating pressure of the oil pressure supply unit; two air
compressors shall be provided, one for use and one for standby and one air tank shall be provided. The
volume of the air tank may be determined according to the air compensation for the pressure oil tank. The
rated operating pressure of the air tank should be 0.2MPa to 0.3MPa higher than the rated operating pressure
of the pressure oil tank. The air tank shall be fitted with the safety valve, pressure gauge and blow-down valve
and the condensate removal arrangement.
8.3.3 The pressure of the low pressure air compressor system for the braking, overhaul and maintenance of
the unit as well as the sealing of the shroud ring of the turbine main shaft and the sealing ring of the butterfly
valve shall be 0.7MPa to 0.8Mpa; the braking air for the unit shall meet the following requirements:
a) The braking air system of the unit shall be equipped with the special air tank and the air supply pipeline
for the braking air system of the unit;
b) The total volume of the air tank for unit braking shall be determined according to the total air consumption
of the units to be braked at the same time;
c) The capacity of the air compressor shall be determined as per the air consumption of the units to be
braked at the same time and the time for resuming the operating pressure of the air tank. The time for
resuming the operating pressure of the air tank may be10min to 15min;
d) The braking air of the unit shall be supplied with the standby air compressor or other standby air source
in addition to supply from the air compressor.
8.4.2 The hydropower station should be provided with the conventional measurement items including
the upstream water level, downstream water level, surge-chamber water level, hydropower station head,
pressure difference between the front and back of the trashrack reservoir as well as the reservoir water
temperature. The unit should be provided with pressure at the intake of the spiral casing, the head cover
pressure, the pressure at the intake of the draft tube as well as the cooling water pressure of the unit, while
the selective measurement items may be provided as well, such as the flow passing through the unit, the
pressure fluctuation of the turbine, the unit efficiency, unit vibration, unit throw and the pressure (vacuum)
in the draft tube.
8.4.3 The hydraulic monitoring system shall be designed and arranged in combination with the automatic
monitoring system of the hydropower station for the purpose of the optimal generating by the hydropower
station.
8.6.2 The main machine hall of the surface powerhouse, the erection bay and the auxiliary powerhouse
should employ natural ventilation. When the indoor air parameter requirements could not be met by natural
ventilation, the combination of natural ventilation and mechanical ventilation, mechanical ventilation and
local air conditioning may be adopted.
8.6.3 If the generator is ventilated through the pipeline, the hot air shall be led out of the powerhouse.
8.6.4 The oil tank room and the oil treatment room shall be equipped with separate ventilation systems. The
air outlets of the ventilation system shall be 1.5m higher than the roof.
8.6.5 The ventilation rate of the GIS room shall be 8 times/hr., and the air inlet shall be set in the lower part
of the room.
8.6.6 The heating device shall be equipped when the indoor temperature of the main and auxiliary
powerhouses is lower than 5℃.
8.6.7 Necessary ventilation facilities shall be installed in the gallery at the bottom of the dam.
9.1 Basic principle for the design of the fire extinguishing system
9.1.1 Fire protection system of the power station and unit equipment should follow the fire protection
standards of the country.
9.1.2 The fire hazards and fire resistance rating shall be classified for the buildings and structures in the
hydropower station.
9.2.2 There shall be at least two evacuation exits for the powerhouse of the hydropower station. On the
generator floor and the floors below, the distance from the farthest workplace indoors to the nearest
evacuation exit on this floor shall not exceed 60m.
9.2.3 It is necessary to provide a 100% oil storage pit or a20% oil storage pit and a common oil storage
tank for the main oil-immersed transformer with single oil capacity over 1000kg and the other oil filling
equipment.
9.2.4 The power cables and the control cables shall be laid in layers. The cables laid in layers shall be separated
with clapboards with fire endurance not less than 0.5h.
9.2.5 Every 100m of cable tunnels and ditches should be equipped with a fire-proof partition. Closure and
partition measures should be implemented for the through-wall.
9.2.6 The automatic fire extinguishing system such as water spray shall equip the generator with a unit
capacity not less than 12.5MV·A and the indoor main oil-immersed transformer with a unit capacity not less
than 12.5MV·A.
9.2.7 The powerhouse shall be equipped with smoke discharging facilities and these shall be combined with
the ventilation system.
9.2.8 The fire water for the plant area may be supplied with natural water flows, the special fire water tank
and fire water pump, and may be combined with the living and the generation water supply systems. The
water supply quality, water pressure and water volume shall meet the requirements for firefighting water
supply.
9.2.9 The firefighting apparatuses shall be powered as per the level-II load and employ the separate and
fail safe power supply loop. The control equipment for the firefighting apparatus shall be installed in the
central control room. When the water is supplied with the firefighting water pump, the starting device for the
firefighting water pump shall be set in the firefighting cabinet.
9.2.10 The emergency lighting and evacuation indication signs shall be provided in the escape route in the
powerhouse at all floors, staircases, exits and in the firefighting water pump house.
9.2.11 The automatic fire alarm shall be installed in the hydropower station.
a) The requirement for the integral lifting of the generator rotor together with the shaft;
b) The requirements for assembling the turbine and the shaft sleeve and for integral lifting;
c) The requirement to send the main transformer to the factory for overhaul if necessary;
d) The requirement to turn over the components like the water distributor for the bulb tubular unit;
e) The distance between components lifted by the crane and the fixed object shall not be less than 0.3m in
the vertical direction nor be less than 0.4m in the horizontal direction.
10.2.2 The surface area of the erection bay shall be determined according to the demand for the expanded
overhaul of one of the unit-main components of the unit shall be arranged within the working scope of the
crane hook and meet the following requirements:
a) Requirement of the sequence for lifting large pieces in the installation and overhaul process;
b) Net distance between the large pieces of the unit as well as between big pieces and wall (column) or fixed
equipment shall be 0.8m to 1.0m;
c) The requirement for vehicles coming into the plant for the loading and unloading of the components shall
be met;
d) The turbine oil room may be set up in the powerhouse while the insulation oil tank maybe set up outside
the powerhouse and the oil treatment room shall be arranged near the oil tank room;
e) Other auxiliary machinery shall be arranged for the convenience of the installation, operation, overhaul
and maintenance of the equipment.
Appendix A
(Normative)
Reference formula for the basic parameter calculation for the
reaction turbine
Qr = Q1'r D12 Hr
........................................................................(A.1)
where
Q'1r is the unit discharge under the rated working condition, in m3/s;
A.2 Calculation of the draft height and determination for setting the elevation of
the turbine
A.2.1 See formula (A.2) for the calculation of the draft height
Hs 10 K mH
900 .............................................................(A.2)
where
Usually it may be calculated as per rated head; for the minimum head of the axial-flow turbine as well as the
maximum head and corresponding σm of the Francis turbine shall be verified.
A.2.2 See formula (A.3) for setting the elevation of the vertical-shaft Francis turbine.
b0
w Hs
2 .....................................................................(A.3)
where
A.2.3 See formula (A.4) for setting the elevation of the vertical-shaft axial-flow turbine.
w Hs xD1
....................................................................(A.4)
where
A.2.4 See formula (A.5) for setting the elevation of the horizontal-shaft reaction turbine.
D1
w H s
2 .......................................................................(A.5)
A.3.1 See formulas (A.6) and (A.7) for the calculation of the prototype turbine efficiency
T M △ .............................................................................(A.6)
In addition to the calculation according to the reference formulas listed in A.3.2 to A.3.4 below, the efficiency
correction of the turbine should also take into account the correction caused by the abnormal components
and the process deviation between the prototype and the model turbines. When the diameter of the runner
is less than 1 m, it should be negatively corrected.
A.3.2 For the first method for the turbine efficiency correction, see formulas (A.8) and (A.9).
Francis:
0.2
D
△ K (1 M max ) 1
1M ........................................................(A.8)
D1
Axial-flow:
0.2 0.1
D1M HM
△ K (1 M max ) 0.7 0.7
.......................................(A.9)
D1 HP
where
K is the coefficient, K=0.5-0.7 (low value is for the retrofitted unit and the high value is for the
new unit);
A.3.3 For the second method for the turbine efficiency correction, see formulas (A.10) and (A.11).
Calculation formula for the efficiency correction of the reaction turbine recommended in IEC60193:
0.16 0.16
Re Reuref
uref
△b ref
Re Re
um up ............................................... (A.10)
1 bopt m
r ef 0. 16
Reur ef 1 Vr ef
Reuopt m Vr ef
..................................................... (A.11)
where
△ b is the corrected value converted from the model efficiency to the prototype efficiency;
δref is the corrected value converted from the nominal value to the prototype efficiency;
Reuoptm is the reynolds number at the optimum efficiency point of the model;
Vref is the standard loss distribution coefficient (0.8 for the Kaplan turbine, 0.7 for the Fancis
and the fixed blade propeller turbines).
As for the existing model test curve, the model test data of the Reynolds number and the water temperature,
the efficiency correction may be calculated by the formulas (A.12-14):
Re 0.16
△b (1 boptm )Vm 1
um
Re
up .................................................. (A.12)
Vm = Vopt m = Vr ef
..................................................................... (A.13)
where
Voptm is the oss distribution coefficient at the optimum efficiency point of the model.
NTr 9. 81Qr H r Tr
.................................................................. (A.15)
where
H max
nf max
n1'f max
D1
................................................................ (A.16)
where
2
Pz K z D1 H max (kN ) .............................................................. (A.17)
4
where
Kz is the is the axial hydraulic thrust coefficient; to be obtained as per the relevant experimental
parameters.
Appendix B
(Normative)
Reference formula for the basic parameter calculation of the
impulse turbine
Qsj
d 0 545
K p Z 0 Hsj ................................................................(B.1)
Nf
Qsj
9. 81Hsj T f .....................................................................(B.2)
where
ns
ns 1 =
K pZ 0
............................................................................(B.4)
NTr
N1 =
K pZ 0
..............................................................................(B.5)
where
(39 ~ 40) H sj
D1
nr .....................................................................(B.6)
D1
m=
d 0 ...................................................................................(B.7)
where
For ensuring the relatively higher efficiency of the turbine, the value m should be within the range of 10 to 20.
Low value applies to the low head while the high value applies to the high head.
d p = (1.15 ~ 1.25)d 0
.....................................................................(B.8)
D1
Z 1 6. 67 0
d0
.........................................................................(B.9)
where
B.5.2 When determining the draining height, it is necessary to ensure the necessary ventilation height which
should not usually be less than 400mm.
h p (1.0 ~ 1.5) D1
..................................................................... (B.10)
where
hp is the draining height, m; high value is for the vertical shaft unit and the low value is for the
horizontal shaft unit.
B.6.1 The setting elevation shall be determined according to the maximum tailwater level for power
generation. Under any power generation conditions, sufficient draining height should be kept for the tailrace.
D1
Wm hp
2 ................................................................. (B.12)
nr NTr
ns r
H r 5/ 4
....................................................................... (B.13)
where
70 H max
nf max
D1
.................................................................... (B.14)
where
where
Appendix C
(Normative)
Reference formula for the working capacity calculation of the
governing system for some turbines
For the calculation of the operating capacity of the governing system for the impulse turbine, see formulas
(C.1) and (C.2)
d02 H max
Anz = 10Z (d0 + )
6000 ................................................................. (C.1)
Ade = 11 10 3 d 03 H max Z .................................................................. (C.2)
where
For the calculation of the operating capacity of the governing system for the Kaplan turbine, see formulas
(C.3) and (C.4)
Aru=K2φHmaxD13............................................................................. (C.4)
where
K2 is the coefficient;
φ is the intersection angle between two extreme positions of the blade, in radian.
When the number of blades Z=4, K2=8.0; when Z=5, K2=8.5; when Z=6, K2=9.0.
For calculation of the operating capacity of the governing systems for the shaft-extension tubular and the
bulb tubular turbines, see formula (C.5)
A = 400Q H max D1
...................................................................... (C.5)
where
Key
1 turbine 2 generator
Figure C.1 - Transverse cross-section plan of the vertical unit power plant
Key
1 turbine
2 generator
3 bridge crane
Figure C.2- Transverse cross-section plan of the horizontal unit power plant
Key
Key
3 generator 4 turbine
Key
2 working tank
Figure C.6 - Schematic diagram of the low pressure compressed air system
C.10 Schematic diagram of the technical water supply and drainage system
Figure C.7 - Schematic diagram of the technical water supply and drainage system