Professional Documents
Culture Documents
Rebar Monitoring
Rebar Monitoring
Location : Manila sth road. Tagapo Location : Manila sth road. Tagapo Sta. Rosa, Laguna
Prepared by:
Engr. Mark Joseph Suyat
Project Engineer
Requested by:
Engr. Mark Joseph Suyat
Project Engineer
Rebars UGB 28 42/43 18 52/53 15 34/35 44 50 51 38 36
25mm x 12m 27 12 14 25 17 27 14 11 13 21 37
25mm x 10.5m 10 5 20 7 11 20 10 9 6 10
25mm x 9m 10 7 4 24 13 14 21 38 42 6 1
25mm x 7.5m 8 3 16 10 17 15 8 4 10 18 9
20mm x 12m
20mm x 10.5m
20mm x 9m
20mm x 7.5
16mm x 12m 26
16mm x 10.5m
16mm x 9m
16mm x 7.5m
10mm x 12m 10 25 8 12 12 20 20 8 10 8 31
17 32/33 26 13 27 25 23 54 45/11/29 12/19/_40 21/ 22 / 24
27 37 14 18 12 12 6 6 350 5 6 3
8 10 5 4 4 9 3 13 164 7 1 5
1 1 3 3 4 3 2 25 222 9 1
6 9 4 9 7 1 14 6 174 11
4
2
5
1
26
3
51 61 46 41 58 38 40 25 1226 24
31 18 6 19 6 4 6 59 313 21 28 25
2/ 3/ 14/ 16/ 37/ 39/ 41 46/47/48 49
3 5
8 8
12 5 23
4 2
6 1
4 4
11 33
31 32 18 23