Sarabia Ogl421 Riskmanagementplan
Sarabia Ogl421 Riskmanagementplan
Marcelino Sarabia
3 September 2021
Risks:
Revisit the Anticipated Project Risks section of your Risk Management Project Roles and
Responsibilities assignment. Given the timeline that Eldon Tyrell has given you, are your initial
identified risks still valid? Why or why not? Do you foresee any additional risks?
The risks identified previously remain valid as they were standard risks such as having
one too many people involved in major communication, triple constraint, and technology bugs.
The mitigation plans for these risks also remain the same and should be followed closely and
updated if anything changes. The individuals responsible for the risks and communication also
remain the same. These are expected and safe to plan for however given the three-month
timeline for this project, naturally there were additional risks identified.
These newly identified risks include scope creep, inaccurate cost estimations, turnover
issues, interpersonal issues, and change resistance. These were zoned in on as a short
timeframe can cause additional stress and decrease the window for work to get done therefore
placing more pressure on speediness while maintaining, if not approving the quality of work.
Although there were a good number identified and added, they are easy to mitigate since they
will be strongly planned for. If the team follows the risks analysis and utilizes the mitigation and
actions plans set, they will not cause any setbacks for the project overall.
Sarabia, 2
Solutions:
For this section, create a table. In the left-hand column, create a list of all the risks you have
identified so far for this project. In the right-hand column, create a list of your proposed
solution(s) to each risk. These solutions must be detailed, including the resources or
communication that will be needed to mitigate the risks. Your solutions must also be practical.
Risk Mitigation
Rachel – “use of a middleman”. Project Manager needs to hold face-to-face (in person
status updates).
Technology Bugs Engineers will provide full support in analyzing
Now is the time to create an action plan for these risks. For this section, list all risks and rank
your risks from greatest to least (this can be in numerical format or in a list with the greatest
risks at the top). Once you have done this, provide a detailed action plan for each. Be sure to
and consistently
Roles/Responsibilities check-in to
tasks.
2. Inaccurate Skilled experts will Preventative Inaccurate cost
Sarabia, 5
ground or median
between both.
3. Staff There will be frequent Contingency If the staff is
timeline.
and responsibilities)
in the case of
Sarabia, 7
termination, voluntary
separation, or
up plans include
redelegation of work
project manager
the separated
individual.
4. Technology When the website goes Contingency Bugs are
them immediately.
engineers to discuss
the solution.
5. Change Upon identifying any Preventative This is
form of communication
offering or opportunity
for questions or
change.
6. Rachel – The Project Manager Preventative This is
meetings/conversation. confirmation
correctly and
effectively. It is
Executive Sponsor to
he is available to
attend.
Sarabia, 10
required follow-up to
check in on the
effectiveness.