Professional Documents
Culture Documents
Aeap 0645
Aeap 0645
Aeap 0645
J-323
Beta-2
Greater Noida Uttar Pradesh 201308
India
GSTIN 09ABOFA4888R1Z7
Estimate
# : AEAP-0645 Place Of Supply : Haryana (06)
Estimate Date : 01/08/2021
Bill To Ship To
Kathi Nation Gurgaon
Gurgaon Haryana
Haryana India
India
Subject :
Quotation For Kitchen Fume Extraction System
IGST
# Item & Description HSN/SAC Qty Rate % Amt Amount
1 Exhaust Hood 8414 1.00 8,250.00 18% 1,485.00 8,250.00
OPTION - 1 Nos.
Supply & Installation of suitable G.I
Constructed Kitchen Exhaust Hood
Size 3 Ft x 2.5 Ft
2 OPTION - 2 1.00 12,750.00 18% 2,295.00 12,750.00
Supply & Installation of suitable SS 202
Constructed Kitchen Exhaust Hood
Size 3 Ft x 2.5 Ft
3 Exhaust Fan 841459 1.00 11,250.00 18% 2,025.00 11,250.00
Supply of Suitable Heavy Duty Exhaust Nos.
Fan for Extraction of Kitchen Fumes with
Crompton / Havells Make Three Phase
Motor
4 Installation 1.00 1,750.00 18% 315.00 1,750.00
Charges For Exhaust Fan Nos.
5 Electric Starter 8536 1.00 2,650.00 18% 477.00 2,650.00
Supply of suitable Three Phase DOL Nos.
Starter to operate the Exhaust Fan
L&T / Havells / Any Reputed Make only
6 Ducting 841459 1.00 16,250.00 18% 2,925.00 16,250.00
Supply & Installation of suitable G.I Lot
Ducting For Exhaust Fan & Hood
Connection with all necessary hanging
arrangements.(up to 20 running ft. only)
7 Electric Work 841459 1.00 0.00 18% 0.00 0.00
Extra In Client Scope Lot
8 Civil Work 841459 1.00 0.00 18% 0.00 0.00
Extra In Client Scope Nos.
Sub Total 52,900.00
Total In Words IGST18 (18%) 9,522.00
Indian Rupee Sixty-Two Thousand Four Hundred Twenty- Total 62,422.00
Two Only
Note
*Our Scope is limited upto supply & installation of exhaust fan with suitable
G.I Ducting & Hood.
*Any other material which is not mentioned in our offer will be charged extra
Authorized Signature
or in client scope.
*Kindly confirm for the fume extraction process i.e. fume extraction with
cleaning or fume extraction without cleaning.
*Also check the noise issue in the nearby location.