OWNER:

2930
B
300
1015 300 1015 300

NORTH POINT:
CONCRETE STUB

1200
400
BBS

HOT DIP GALVANISED


I-BEAM ON
CONCRETE SLEEPERS GENERAL NOTES:
(154 X 94X17KG/M)/ 1. Do not scale.
(152 X 89X16KG/M) 2. All dimensions are in mm unless otherwise specified.
A A 3. All details of existing construction to be confirmed
on site. Any discrepancies are to be reported to the
Designer immediately.
B
4. This drawing to be read in conjunction with all
other relevant drawings.
BBS CONCRETE SLEEPERS LAYOUT

C25 CONCRETE(1:1.5:3) 4 T12 (2T& 2B) 4 T12 (2T& 2B) T08-200 C/C C25 CONCRETE
T08-200 C/C 400 CHIP STONES

50
100

100

100

100
GL+0.0 GL+0.0
50

300

300
-150 -150

50

50
50

50

C10 CONCRETE BLINDING


1200 C10 CONCRETE BLINDING 300

SECTION B-B SECTION A-A PLANNING DRAWING


CONTRACTOR:

BBS CONCRETE SLEEPER MATERIAL LIST


Length (m)
No. Item Size Quantity sample Weight
each sub total
Reinforcement
100

100

1 T12 T12 4x3 1.3 16 14.24Kgs


1100

200 SITE TYPE:


GREENFIELD SITE
200

200

2 Reinforcement T08 7x3 0.95 19.95 7.98Kgs SITE COORDINATES (WGS84):


200 LATITUDE:
C25 concrete LONGITUDE: ELEVATION: 1,967m
3
(1:1.5:3) SITE NAME:
KABASIS
4 C10 concrete
SITE ID:
18537_RV_WL1135
DRAWING TITLE:
NETIS PROJECT MANAGER'S APPROVAL: ATC PROJECT MANAGER'S APPROVAL: ATC QA APPROVAL: Landlord's Name: Landlord's Signature: L.R. No :
BBS CONCRETE SLEEPER DETAILS
Name: Name: JAMES NYAMWEA Name:
DRAWN BY: DESIGN CHECK BY: APPROVED BY:
Signature: Signature: Signature: NETIS NETIS AMERICAN TOWERS

Date: Date: Date: DATE: DRAWING No: SCALE:


OCT 2021 ATC-2021-15 AS SHOWN