Name of Work : Construction of Minor Bridge at km 6/2 of Silambimangalam - Portonovo

road (via) Samiyarpettai Pudukuppam - Chinnur

ABSTRACT ESTIMATE
Approach road
Sl.
Description Quantity. Unit Rate Amount
No
1

Providing and laying U.S Gravel including cost


and conveyance of U.S gravel from approved
quarry to work site including spreading watering
92.25 M3 707.00 65221
with all lads and consolidatiion by power roller
and all ither incidental charges etc., complete as
per standard specification for shoulders.

2
Providing and Laying Granular Sub-Base
Grade- V consisting of well graded Material
confirming to the grading given in Table No.400-
1, mixing in a mechanical mix plant at OMC,
carriage of mixed Material to work site,
133.00 M3 1956.55 260221
spreading in uniform layers with motor grader on
prepared surface and compacting with vibratory
roller to achieve the desired density, etc.,
complete as directed by the Engineer. as per
MORTH No. 111, 112, 401, 900.

3
Provding and Laying Wet Mix Macadam
consisting of clean crushed aggregates
confirming to the grading given in Table No.400-
13, including premixing the Material with water
at OMC in mechanical mix plant carriage of
mixed Material by tipper to site, laying in uniform 166.25 M3 2199.86 365727
layers with paver on well prepared surface and
compacting with vibratory roller to achieve the
desired density, etc., complete as directed by
the Engineer. as per MORTH No. 111, 112, 406,
900.
4
Providing and applying Prime Coat over
granular Base with bitumen emulsion (SS-I type)
on prepared surface including preparing the
road surface and spraying the primer at the rate 665.00 M2 72.65 48312
of 0.70 kg / sqm using bitumen sprayer as
directed by the Engineer - over WMM as per
MORTH No. 111, 112, 502, 900

5
Providing and applying Tack Coat over granular
surface treated with primer using Bitumen
Emulsion (RS-I type) with mechanical sprayer at 665.00 M2 17.06 11345
the rate of 0.25 kg per sqm as directed by the
Engineer as per MORTH No.111,112,503,900.

6
Providing and applying Tack Coat over existing
bituminous surfaces with Bitumen Emulsion
(RS-I type) using mechanical sprayer at the rate
95.00 M2 22.97 2182
of 0.20 kg per sqm on the prepared bituminous
surface as directed by the Engineer as per
MORTH No. 111, 112, 503, 900

7
Providing and laying Bituminous Macadam
which work shall consist of construction, using
crushed aggregates, premixed with VG 30
Grade Bitumen at the rate of 3.40% by weight of
the total mix confirming to the aggregates and
binder as per table no.500-7 in the Hot mix
plant, transporiting the mix to the worksite, 33.25 M3 7940.70 264028
laying with paver finisher and compaction with
smooth wheeld and vibratory roller in
accordance with the requirements of the
specification and in confirmity with the drawing
as directed by the Engineer for BM (Grade-II)
as per MORTH No. 111, 112, 504 900
8

Providing and laying Bituminous Concrete


which work shall consist of construction using
coarse aggregates (Table 500-17) premixed
with VG 30 Grade Bitumen at the rate of
minimum 5.40% by weight of the total mix
confirming to the aggregates and binder as per
the job mix formula in the Hot mix plant,
22.80 M3 9975.88 227450
transporiting the mix to the worksite, laying with
paver finisher and compaction with smooth
wheeld and vibratory roller in accordance with
the requirements of the specification and in
confirmity with the drawing as directed by the
Engineer for BC (Grade-II) as per MORTH No.
111, 112, 507, 900

1244486

Assistant Divisonal Engineer, Junior Engineer,


Highways, C&M Highways, C&M
Kuirnjipady. Portonovo.
Name of Work : Construction of Minor Bridge at km 6/2 of Silambimangalam -
Portonovo road (via) Samiyarpettai Pudukuppam - Chinnur

Detailed Estimate
Approach road
Sl. Measurement Uni
Description No Qty
No L B D t

Providing and laying U.S Gravel including cost and conveyance of U.S gravel
from approved quarry to work site including spreading watering with all lads and
1
consolidatiion by power roller and all ither incidental charges etc., complete as
per standard specification for shoulders.

Towards
1 x 1 5.000 12.000 0.900 54.00
Silambimangalam
Towards Portonovo 1 x 1 5.000 12.000 0.900 54.00
(((16+12)/2)+7
(0.9+0)/2
)/2
Towards
1 x 1 35.000 10.500 0.450 165.38
Silambimangalam
Towards Portonovo 1 x 1 25.000 10.500 0.450 118.13
Deduct GSB -133.00
Deduct WMM -166.25
92.25 m3
Providing and Laying Granular Sub-Base Grade- V consisting of well graded
Material confirming to the grading given in Table No.400-1, mixing in a
mechanical mix plant at OMC, carriage of mixed Material to work site, spreading
2
in uniform layers with motor grader on prepared surface and compacting with
vibratory roller to achieve the desired density, etc., complete as directed by the
Engineer. as per MORTH No. 111, 112, 401, 900.

(12+7)/2
Towards
1x 1 40.000 9.500 0.200 76.00
Silambimangalam
Towards Portonovo 1x 1 30.000 9.500 0.200 57.00
133.00 m3

Provding and Laying Wet Mix Macadam consisting of clean crushed aggregates
confirming to the grading given in Table No.400-13, including premixing the
Material with water at OMC in mechanical mix plant carriage of mixed Material
3
by tipper to site, laying in uniform layers with paver on well prepared surface and
compacting with vibratory roller to achieve the desired density, etc., complete as
directed by the Engineer. as per MORTH No. 111, 112, 406, 900.

(12+7)/2
Towards
1x 1 40.000 9.500 0.250 95.00
Silambimangalam
Towards Portonovo 1x 1 30.000 9.500 0.250 71.25
166.25 m3
Providing and applying Prime Coat over granular Base with bitumen emulsion
(SS-I type) on prepared surface including preparing the road surface and
4
spraying the primer at the rate of 0.70 kg / sqm using bitumen sprayer as
directed by the Engineer - over WMM as per MORTH No. 111, 112, 502, 900

(12+7)/2
Towards
1x 1 40.000 9.500 380.00
Silambimangalam
Towards Portonovo 1x 1 30.000 9.500 285.00
665.00 m2

Providing and applying Tack Coat over granular surface treated with primer
5 using Bitumen Emulsion (RS-I type) with mechanical sprayer at the rate of 0.25
kg per sqm as directed by the Engineer as per MORTH No.111,112,503,900.

(12+7)/2
Towards
1x 1 40.000 9.500 380.00
Silambimangalam
Towards Portonovo 1x 1 30.000 9.500 285.00
665.00 m2
Providing and applying Tack Coat over existing bituminous surfaces with
Bitumen Emulsion (RS-I type) using mechanical sprayer at the rate of 0.20 kg
6
per sqm on the prepared bituminous surface as directed by the Engineer as per
MORTH No. 111, 112, 503, 900
(12+7)/2
1x 1 10.000 9.500 95.00
95.00 m2

Providing and laying Bituminous Macadam which work shall consist of


construction, using crushed aggregates, premixed with VG 30 Grade Bitumen at
the rate of 3.40% by weight of the total mix confirming to the aggregates and
binder as per table no.500-7 in the Hot mix plant, transporiting the mix to the
7
worksite, laying with paver finisher and compaction with smooth wheeld and
vibratory roller in accordance with the requirements of the specification and in
confirmity with the drawing as directed by the Engineer for BM (Grade-II) as per
MORTH No. 111, 112, 504 900

(12+7)/2
Towards
1x 1 40.000 9.500 0.050 19.00
Silambimangalam
Towards Portonovo 1x 1 30.000 9.500 0.050 14.25
33.25 m3
Providing and laying Bituminous Concrete which work shall consist of
construction using coarse aggregates (Table 500-17) premixed with VG 30
Grade Bitumen at the rate of minimum 5.40% by weight of the total mix
confirming to the aggregates and binder as per the job mix formula in the Hot
8
mix plant, transporiting the mix to the worksite, laying with paver finisher and
compaction with smooth wheeld and vibratory roller in accordance with the
requirements of the specification and in confirmity with the drawing as directed
by the Engineer for BC (Grade-II) as per MORTH No. 111, 112, 507, 900

(12+7)/2
Towards
1x 1 40.000 9.500 0.030 11.40
Silambimangalam
Towards Portonovo 1x 1 30.000 9.500 0.030 8.55
1x 1 10.000 9.500 0.030 2.85
22.80 m3

Assistant Divisonal Engineer, Junior Engineer,


Highways, C&M Highways, C&M
Kuirnjipady. Portonovo.
DATA
Name of Work : Construction of Minor bridge at km 0/4 of Silambimangalam - Portonovo
road (via) samiyarpettai Pudukuppam - Chinnur road

Providing and laying Carted Earth having minimum CBR of 8


with an additional lead of 10 km including cost of earth,
seniorage charges conveyance, laying, watering and
consolidation etc., complete as directed by the Engineer for
forming the shoulders as per MORTH No.111, 112, 305, 900.

1.16 Cost of Earth 63.60 73.78

1.16 Conveyance @ 10 Km 96.20 111.59

1.00 Hire and Labour charges 16.14 16.14

Total 201.51
BAR BENDING SCHEDULE - ( as per SD 109)
TOTAL UNIT
Sl No SHAPE OF BARS TYPE OF DIA IN SPACING LENGTH Nos LENGTH (in WEIGHT ( in TOTAL WEIGHT ( in
BARS ‘mm’ IN ‘mm’ (in ‘m’) ‘m’) Kg/ m) Kg)

1 1 12 200 #VALUE! #VALUE! #VALUE! 0.888 #VALUE!


#VALUE! #VALUE!
#VALUE!
2 2 12 200 5.208 #VALUE! #VALUE! 0.888 #VALUE!

3.48

0.90
3 #VALUE! #VALUE! 3 12 130 #VALUE! #VALUE! #VALUE! 0.888 #VALUE!

#VALUE!
4
4 Bar not used

5 5 10 200 #VALUE! #VALUE! #VALUE! 0.617 #VALUE!

0.2 #VALUE!

#VALUE!
6 #VALUE! 6 12 180 #VALUE! #VALUE! #VALUE! 0.888 #VALUE!
0.20 0.2

7
7 Bar not used

8 #VALUE! 8 12 200 #VALUE! #VALUE! #VALUE! 0.888 #VALUE!


#VALUE! #VALUE!
9 0.2 9 10 250 1.222 #VALUE! #VALUE! 0.617 #VALUE!
0.862
0.2
10 0.2 10 12 250 1.242 #VALUE! #VALUE! 0.888 #VALUE!
0.89
0.2
11 #VALUE! 11 10 250 #VALUE! #VALUE! #VALUE! 0.617 #VALUE!
0.18 0.18

12 #VALUE! 12 10 250 #VALUE! #VALUE! #VALUE! 0.617 #VALUE!


0.18 0.18

13 #VALUE! 13 10 250 #VALUE! #VALUE! #VALUE! 0.617 #VALUE!


0.18 0.18

14 #VALUE! 14 10 250 #VALUE! 12 #VALUE! 0.617 #VALUE!


0.18 0.18

15 #VALUE! 15 10 250 #VALUE! #VALUE! #VALUE! 0.617 #VALUE!


0.18 0.18

16 #VALUE! 16 10 #VALUE! 12 #VALUE! 0.617 #VALUE!


0.16 0.16

17
17 Bar not used
18 0.15 18 10 150 1.092 #VALUE! #VALUE! 0.617 #VALUE!

0.45

19 0.16 0.16 19 10 - 2.860 4 11.44 0.617 7.058

2.60
20 1.30 20 10 150 4.207 #VALUE! #VALUE! 0.617 #VALUE!

1.1 1.556
0.20

21 0.2 0.2 21 12 - 2.928 20 58.56 0.888 52.001

2.60
#VALUE!

#VALUE!
(or) #VALUE!

You might also like