Pro-Forma 1 Design Information Checklist
Pro-Forma 1 Design Information Checklist
Pro-Forma 1 Design Information Checklist
Client:
Project:
System:
Client:
Project:
System:
Major plant, intermediate heat exchangers and space terminal units are
installed in accordance with the specification and manufacturers'
instructions
1 Air handling units 1
2 Fans 2
3 Ductwork 3
4 Dampers 4
5 Filter units 5
6 Terminals 6
7 Fire dampers 7
8 Controls (These need only be completed in so far as they affect the 8
mutual process of regulation i.e. that they are correctly fitted 'in
link')
Client:
Project:
System:
5 Intake louvers, Diffusers, grilles and louvers fitted, clean and free from 5
obstruction
6 All access doors installed, sealed and secure 6
7 Fan / Chamber / Air Handling Unit / Ductwork system internally clean 7
8 Air filters installed and clean (HEPA types filters to be advised) 8
9 Air leakage tests completed with all test blanks removed 9
10 Fan / AHU / Coil drains and traps complete 10
11 Suitable commissioning test point positions available and accessible 11
Name
Signature
Date
Client:
Project:
System:
Item Report sheet references Checked Approved Witnessed
(Date) (Date) (Date)
GENERAL COMMENTS
Client:
Project:
System:
Client:
Project:
System: Fan
Location Drg Ref:
Manufacturer: Type:
Serial No: Size:
Fan
Manufacturer: Type:
Motor
Design Test
Flow Rate m3/s m3/s
Pressure, suction Pa Pa
Fan
Pressure, discharge Pa Pa
Performance
Pressure, no flow Pa Pa
Speed rev/min rev/min
Voltage V V
Current flc (amps) running (amps)
Motor
Speed rev/min rev/min
Power kW kW
INSTRUMENTS USED / COMMENTS
Client:
Project:
System:
Terminal Terminal size Design Actual % design Final reading Comments
number volume m3/s reading m3/s m/s
GENERAL COMMENTS
Client:
Project:
System:
Traverse Design Duct size Duct area Traverse Actual % design
location volume mm m2 volume
m3/s m3/s
1 2 3 4 5 6 7 8 Av
GENERAL COMMENTS