4-5 - Master Document List (Updated On 4-May)
4-5 - Master Document List (Updated On 4-May)
4-5 - Master Document List (Updated On 4-May)
TA3-BSR-PVMRBMA-GEN-012-2
5 Package 4 Major equipment list TA3-BSR-PVMRBMA-GEN-005-0 28-Feb-17 PVMR/BM Richard Not Yet Submit Code 3
Accepted by BSR
6 Package 4 Internaface & Coordination Plan TA3-BSR-PVMRBMA-GEN-006-0 30-Mar-17 PVMR/BM Richard Not Yet Submit
DC
Contractor BSR returned on
7 Package 4 Equipment Mobilization Plan TA3-BSR-PVMRBMA-GEN-007-0 5-Apr-17 PVMR/BM Richard 8-Feb In Progress 1st Submission on 8-Feb
Review 26-4
Contractor BSR returned on
8 Package 4 Manpower Mobilization Plan TA3-BSR-PVMRBMA-GEN-008-0 5-Apr-17 PVMR/BM Richard 8-Feb In Progress 1st Submission on 8-Feb
Review 26-4
Accepted by BSR
9 Package 4 Material Control Procedure TA3-BSR-PVMRBMA-GEN-009-0 20-Mar-17 PVMR/BM Richard 21-Mar-17 Not Yet Submit In Progress
DC
Accepted by BSR
10 Package 4 Welding Control Procedure TA3-BSR-PVMRBMA-GEN-010-0 20-Mar-17 PVMR/BM Richard 21-Mar-17 Not Yet Submit In Progress
DC
11 Package 4 Detailed Organization Chart TA3-BSR-PVMRBMA-GEN-011-0 5-Apr-17 PVMR/BM Richard Not Yet Submit Code 4
Accepted by BSR
12 Package 4 Subcontractor List and Evaluation TA3-BSR-PVMRBMA-GEN-012-0 15-Feb-17 PVMR/BM Richard
DC
SCHEDULE
1st Submission on 25-Jan
Minor Comment
1 Package 4 Pre TA3 Master Schedule for Package 4 TA3-BSR-PVMRBMA-SHD-001-0 28-Feb-17 PVMR/BM VQHuy 13-Mar 17-Mar-17 Resubmitted 2nd Submission on 13-Mar
on 15-Mar
3rd Submission on 5-Apr
PLOT PLAN/DRAWING
PACKAGE 4 TURNAROUND MASTER DOCUMENT LIST AND DEVELOPMENT PLAN
TA3-BSR-PVMRBMA-GEN-012-2
2 Package 4 Temporary Site Layout Plan TA3-BSR-PVMRBMA-DW -002-0 28-Feb-17 PVMR/BM Richard Not Yet Submit Code 1 Approved Approved Approved Approved Internal Review
3 Package 4 Scaffolding Sketch drawing for Package 4 TA3-BSR-PVMRBMA-DW -003-0 PVMR/BM Richard Not Yet Submit Submitted Internal Review
PACKAGE 4 TURNAROUND MASTER DOCUMENT LIST AND DEVELOPMENT PLAN
TA3-BSR-PVMRBMA-GEN-012-2
Code 3
8 Package 4 Method Statement for SG2501 & SG2502 TA3-BSR-PVMRBMA-MS-008-0 3-Mar-17 PVMR/BM Richard Not Yet Submit 1st submission on 13-Apr
Resubmit on 4-5
PROCEDURE
Code 3
2 Package 4 Procedure for Insulation Work TA3-BSR-PVMRBMA-PRO-002-0 1-Mar-17 PVMR/BM Richard 20-Mar-17 Internal Review In Progress 1st submission on 12-Apr
resubmit on 26-4
3 Package 4 Procedure for Blinding Work TA3-BSR-PVMRBMA--PRO-003-0 1-Mar-17 PVMR/BM Richard 20-Mar-17 Internal Review In Progress Code 1 Approved Approved Approved Approved 1st submission on 12-Apr
Code 3
5 Package 4 Procedure for Bundle Puller Operating TA3-BSR-PVMRBMA-PRO-005-0 1-Mar-17 PVMR/BM Richard 20-Mar-17 Internal Review In Progress 1st submission on 12-Apr
Resubmit on 3-5
7 Package 4 Procedure for AFC External Foarm Cleaning TA3-BSR-PVMRBMA-PRO-007-0 1-Mar-17 PVMR/BM Richard 20-Mar-17 Internal Review In Progress Code 1 Approved Approved Approved Approved 1st submission on 12-Apr
9 Package 4 Procedure for Bolt Tightening TA3-BSR-PVMRBMA-PRO-009-0 1-Mar-17 PVMR/BM Richard Not Yet Submit Code 1 Approved Approved Approved Approved
Code 3
14 Package 4 Procedure for Hot Bolting for HE and AFC TA3-BSR-PVMRBMA-PRO-014-0 1-Mar-17 PVMR/BM Richard Not Yet Submit
Resubmit on 26-4
PACKAGE 4 TURNAROUND MASTER DOCUMENT LIST AND DEVELOPMENT PLAN
TA3-BSR-PVMRBMA-GEN-012-2
LIST OF INSPECTION REPORT/CHECK LIST (To be finalized upon QA/QC Plan Approval)
TEMPLATE FOR TURNAROUND MASTER DOCUMENT LIST AND DEVELOPMENT PLAN
Revision 0 Date:
20/11/2016
Document
BSR standard Document Submission Person in Charge Remark
No. Package Document/Procedure Tittle Document No. Status
reference revision Schedule
Prepared by Review By Approve by
LIST OF INSPECTION PROCEDURE FROM BSR
1 Package 4 Inspection of Heat Exchanger BSR-MNT-INS-005 BSR
2 Package 4 Magnetic Particle Testing Procedure BSR-MNT-INS-010 BSR
3 Package 4 Dye Penetrant Testing Procedure BSR-MNT-INS-011 BSR
4 Package 4 Profile Radiography Procedure BSR-MNT-INS-012 BSR
5 Package 4 Ultrasonic Thickness Measurement BSR-MNT-INS-013 BSR
24 Package 4 general requirement for Double Pipe & Multitube 8474L-000-JSS-0630-001 BSR
Exchangers
25 Package 4 general requirement for Plate & Frame Heat 8474L-000-JSS-0660-001 BSR
Exchangers